Omahs Public Power District 1623 Hamey Omaha. Nebnaka 68102 2247 402/536 4000 October 31, 1989 LIC 89 930 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl 137 Washington, DC 20555

References:

1.

Docket 50 285 l

2.

Letter from NRC (D. M. Crutchfield) dated November 23, 1988 i

(Generic Letter 88 20) 3.

Letter from NRC (J. G. Partlow) dated August 29,19W

]

(Generic Letter 88 20 Supplement 1)

Gentlemen:

l i

SUBJECT:

Proposed Program Response to Generic letter 88 20 Supplement No. 1 I

i In response to Generic Letter 88-20 Sup)1ement 1, Omaha Public Power District I

(OPPD) will perform a new Level III Pro)abilistic Risk Assessment (PRA) with external events for the Fort Calhoun Station Unit No.1.

Prior to this analysis no PRA has been performed for Fort Calhoun.

The PRA will be performed I

utilizing the methods described under Section 4, Method 1, of Reference 2.

Specifically, we will be utilizing codes and methods supplied by Science Application International Corporation (SAIC) consistent with NUREG/CR 2300.

l This analysis is intended to be a full scope, comprehensive study that will utilize an extensive in house PRA knowledgeable staff in conjunction with j

personnel supplied by SAIC.

In order to maximize OPPD staff participation as recommended by Generic Letter 88-20, our projected plan consists of utilizing an estimated 22,000 consultant manhours and 24,000 OPPD PRA staff manhours.

Because our plan significantly exceeds the requirements of Generic Letter 88 20, additional time is recuested beyond the three year period identified in i

the Generic letter, in accorcance with the statement issued in Section 11 of Generic Letter 88-20 which reads as follows.

r

" Finally, those licensees 31anning to perform a new Level 11 or Level Ill PRA may need more time.

Tie NRC staff will consider requests for additional time for such an examination."

i 8911080363 891031 ADOCKO$00g5 DR

-. = = -

l

m

(

U. S. Nuclear Regulatory Commission l

LIC 89 955 Page 2 Our proposed schedule, as shown below for the major milestones, is an aggressive one for a project of this magnitude:

1.

Initial Level I models developed - 5/1/91 l

2.

Limited Level 11 models developed and interfaced with Level 1 - 4/1/92 3.

Final Level I/11/111 models 5/1/93 4.

Final models with external events added 9/1/93 s

5.

Submittal to NRC 12/1/93 If you should have any questions regarding our proposed plan, please do not hesitate to contact us.

Sincerely,

. J. Morris Division Manager t

Nuclear Operations KJM/pje c:

LeBoeuf, Lamb, Leiby & MacRae i

R. D. Martin, NRC Regional Administrator A. Bournia, NRC Project Manager P. H. Harrell, NRC Senior Resident inspector i

[.,

c a

UNITED STATES OF AMERICA NUCA. EAR REGULATORY COMMISSION I

f l-In the Matter of i

Omaha Public Power District Docket No. 50 285 i

(Fort Calhoun Station Unit No. 1) i l

F AFFIDAVIT i

K. J. Morris, being duly sworn, hereby deposes and says that he is the Division l

Manager - Nuclear Operations of the Omaha Public Power District; that as such l

he is duly authorized to sign and file with the Nuclear Regulatory Comm:ssion

{

the attached information concerning the response to NRC Generic Letter No.

I 88 20; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information, and belief.

O

]$$$

K.'J/,Aorris Division Manager j

Nuclear Operations j

I i

1 i

STATE OF NEBRASKA ss l

COUNTY OF DOUGLAS Subscribed and sworn to before me, a Notary Public in and for the State of l

Nebraska on this - p s r, day of October, 1989.

Madm N'otary Pilblic i

GENiML NOIART sta g inco {

J.T. GLEAson

% h E4 Mr & tRC j.

L l

l l

l 1

..