o M
)SMUD f
"' SACAAWitWTo IAUNICIPAL UTIUTY DisTfilCT C 0201 S Siteet P.o. Boa it,B30, Sectamento CA 9b8624030.1916) 462 3211 i
AN ELECTRIC SYSTcM SERVING THE HEART OF CALIFORNIA l
^.
AGM/NUC 89-169 October 27, 1989 I
f U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
},
Docket No. 5%312 6
Rancho Seco Nuclebr Generating Station License No. DPR.54 NPC Bl;LLETIN WO. '88-11, PRES $URIZER SURGE LINL 1HERNAL STRATIFICATICM;
- GENERIC LETTER 86-20 INDIVIDUAL Pl. ANT E7JIMINATION FOR SL1'ERE ACCIDENT i
4 WLNERABILITIES1 AXD GINE910 LE1TER 8841, NRC FGITION ON RADIAYION i
W EMBRITTLEMENT OF REACTOR. VESSEL hATLRIALS 4KD ITS XMPACT (W DLANT 0?! RATIONS l
Attention: George Knight 0n
Reference:
1.
S W D to NRC letter dated June 2, 1989, NRC Bulletin No. 88-11, Pressurizer Surge Line Thermal Stratification 2.
SMUD to NRC letter dated March 29, 1989, NRC Position On Radiation Embrittlement of Reactor Vessel Materials and Its Impact on Plant Operations (Generic Letter 88-11)
{
In reference 1, the District committed to submit additional information on l
thermal stratification by October 31, 1989.
Rancho Seco has entered the shutdown condition and is preparing to defuel the reactor.
In addition, the District plans to maintain the plant in a defueled condition for the foreseeable future.
Therefore, because the Reactor. Coolant System (RCS) is not at elevated temperature, pressurizer surge line thermal stratification is r
not credible.
The District will not perform additional analysis on surge line stratification and will be unable to submit additional information.
Prior to any future operation of the facility, we will confer with the NRC to determine what actions will be required to comply with the Bulletin.
i In reference 2, the District committed to:
1.
Evaluate the heatup/cooldown values to determine what, if any, changes were needed to Technical Specifications and/or procedures.
Complete and submit results prior to Cycle 8 operation.
/gM
/s 8911070368 091027 PJ R ADOCK 05000312 F
PNV i Ip i
RANCHO SECO NUCLEAR GENERATING STATION D 1444o Twin Cities Road, Herald, CA 95638 9799;(2091 333-2935
. ~
r
(
~
o George Knighton AGM/NUC 89-169
?.
Update procedures prior to Cycle 8 operation to include restrictions described in the letter.
3.
Include required Technical Specification changes in the Improved Technical Specification Program submittal scheduled for October 1989.
The District has reviewed the radiation embrittlement issue for Rancho Seco I
and determined that additional analyses are not required.
No additional work or submittals will be made associated with Generic Letter 88-11 at this time; however, prior to any future operation of the facility, we will confer with I
the NRC to determine what actions will be required to comply with the Generic Letter.
The Dittrict has also reviewed Generic Letter 88-20, Individual Plant Examination (IPE) For Severe Accident Vulnerabilities and determined that, with the facility maintaining a defueled condition, severe accidents as would be modeled and analyzed by an IPE are no longer credible.
Therefore, the District will not perform an IPE or probabilistic risk assessment at recommended by Generic Letter 08-20 for operating nuclear power plants at this time; However, prior to any future operatior. of the facility, we will confer t'ith the NRC to determine what actions will be required to comply with the Generic LPiter.
Members of your staf f with questions requiring additional i.tformation or clarification may contact Dave Swank at (209) 333-2935, extension 4920, 1
I State of California SS County of Sacramento Dan R. Keuter, being first duly sworn, deposes and says:
that he is Assistant General Manager, Nuclear of Sacramento Municipal Utility District (SMUD), the licensee herein; that he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute this document on behalf of said licensee.
C e)
Dan R. Keuter Assistant General Manager Nuclear Subscribed and affirmed to before me on this 87 ay of J A A >
, 1989.
il5['tY^ DANDY dw t
,/$Ndo**cIVEY Eli?M'eth L. Gandy g
g p M y 0V. ?D. 199?.
Notary Public l
l cc:
J. B. Hartin, NRC, Walnut Creek l
A. D'Angelo, NRC, Rancho Seco l