Text
3x n~
[; {,; i 16,
s w,:
..[ }/
h o UNITED STATES g., M
,,4 E[
NUCLEAR REGULATORY COMMISSION l
=*
rj sj WASHINGTON. D, C,20$$5
" ' # 'r'k.
./
October 19, 1989
- ...+
' Docket No. 50-412 y
c-
'Mr.--J..D. Sieber,.Vice President lhuclearGroup
-l
~Duquesne' Light Company
~ Post Office Box 4 Shippingport,. Pennsylvania.15077
($
i
Dear Mr. Sieber:
SUBJECT:
BEAVER-VALLEV UNIT 2 - SAFEGUARDS REGULATORY EFFECTIVENESS
+
' REVIEW (RER) PROGRAM (TAC NO. 75073)
The purpose of this. letter is 'to confirm our plan to conduct a site visit to
-obtain location information as part of our efforts in the RER program.
Tne o
' primary purpose of.the RER program is to assess the effectiveness of your
. reactor safeguards program, as implemented in accordance with the general performance objective of 10 CFR 73.55(a).
In support of the RER program,.our contractor SAIC performs vital equipment i
and. vital area analyses, and documents such analyr.es'in. Facility' Systems i
g Analysis.(FSA) reports.
These efforts include the construction of a sabotage i
fault tree 'for each plant, reduction of the tree to Boolean equations that define ~ facility fault and protection equations, and fault equations for the a-individual systems that are included in the facility fault tree model.
These reports are used as guides to assist the RER of your designated vital 3
4
- equipment and areas, and the RER of your response force drills' target
-selection.
s g The site visit will be performed by Messrs. Lew Goldman, Randy Zounes and i
Bruce Wooten, all of SAIC.
As agreed with Mr. J. Vasse11o of your staff, the j
g visit will~take place in tha week of December 4, 1989.
Please ensure that at least a, senior reactor operator and/or equipment operator is available to l
escort the contractor personnel at all times and provide technical T
information.
Part of the activities will involve walking down those systems l
-(if accessible) listed in the enclosure.
Location information for systems not bN accessible (i.e., due to high radiation) will be obtained from your personnel.
4 Q
Jl. : {.
, y.,
8910270081 891019 i
PDA ADOCK 05000412
- n a
y ppc
,a f'.,
~ _. _
"i
.g
(
t,:,. 1 r
ki/h S'
i4r. J. D. Sieber
-l2 -
f-1t.
' Please designate a contact' person, who will then discuss with Mr. Goldman N
...(619-458-2627) about details of the visit.
e-Sincerely, Peter S. Tam, Sen or Project Manager 1
e-Project' Directorate I-4 Division of Reactor Projects - I/II i
Office of Nuclear Reactor Regulation 0'
Enclosure:
As stated cc w/ enclosure:
See next page o
1 h
l.
l
\\
l l'
?
l l
I il l
l'
gy.
ic" p
, ii y
oo p,,
u
, a.
~
flb.m
,.Mr. J. D. Sieber October 19, 1989-e.
,in yA O
Please designate a contact person, who will then discuss with Mr. Goldman
? 4 (619-458-2627) about details of the visit, k*
Sincerely, i
K
-j a
/s/
Peter S. Tam, Senior Project Manager Project Directorate I-4 g
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
.i
Enclosure:
As. stated l
4 cc w/ enclosure:
l L
See next page i
e DISTRIBUTION g 6 'pm BBoger(14A2)
EJordan (MNBB 3302)
PDI-4 Rdg.'
SVarga(14E4)-..
PTam BGrimes (9A2)
ACRS(10)
BMendelsohn 1
id J o j
'10//789 10/(j/89 10/{} 09 l
l w
f 0FFICIAL RECORD COPY Document Name:
BV2 RER 75073 q.
c f
'.,i m
p-L r
[19 i-
- '. MF. J. Siebar Beaver Valley Power Station Duquesne Light Company Units 1 & 2 cc:
Jay E. Silberg, Esquire-Bureau of Radiation Protection Shaw, Pittman, Potts and Trowbridge Pennsylvania Department of 2300 N Street, N.W.
Environmental Resources Washington, DC 20037 ATTN:
R. Janati Post Office Box 2063 Kenny Grada, Manager Harrisburg, Pennsylvania 17120 Nuclear Safety Duquesne L.ight Company Mayor of the Borrough of P. O. Box 4 Shippingport Shippingport, Pennsylvania 15077 Post Office Box 3 Shippingport, Pennsylvania 15677 John A. Lee, Esquire Ashley C. Schannauer Duquesne Light Company Assistant City Solicitor One Oxford Centre City of Pittsburgh 301 Grant Street 313 City-County Building Pittsburgh, Pennsylvania 15279 Pittsburgh, Pennsylvania 15219 Commissioner Roy M. Smith Regional Administrator, Region I West Virginia Department of Labor U.S. Nuclear Regulatory Commission Building 3, Room 319 475 Allendale Road Caoitol Complex King of Prussia, Pennsylvania 19406 Charleston, W 25305 John D. Borrows Resident Inspector Director, Utilities Department U.S. Nuclear Pegulatory Commission Fublic Utilities Commission Post Office Box 181 100 East Broad Street Shippingport, Pennsylvania 15077
(
Columbus, Ohio 43266-0573 Director, Pennsylvania Emergency I
Management Agency Post Office Box 3321 Harrisburg, Pennsylvania 17105-3321 Mr. J. D. Sieber, Vice President Nuclear Group Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077 E