ML19325D738
| ML19325D738 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/19/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Vaughn G HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML19325D739 | List: |
| References | |
| NUDOCS 8910260049 | |
| Download: ML19325D738 (4) | |
See also: IR 05000498/1989038
Text
'
'
- y
'
--
'
,
p
. ,'
,
o,.'
'
o
a.
,
<
7
x ,ig gs,
.
'
3 In Reply Refer To:
'
<
Dockets:
50-498/89-38
'
50-499/89-38
'<
r
,
,
,
<
, i
Houston Lighting & Power Company
'
-
ATTN:
Gerald E. Vaughn
.
'
,
Group Vice President, Nuclear
,
"
P. O .1 Box 289
'
,Wadsworth, Texas 77483
.
Gentlemen:
,
This refers to the inspection. conducted by Messrs. J. E. Bess,'R. J. Evans,
J. 1. Tapia, and D. M. Hunnicutt of this office during the period
September 1-30, 1989, of activities authorized by NRC Operating Licenses NPF-76
and NPF-80.for the South Texas Project, Units 1 and 2, and to the discussion of
,
our11ndings with you and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included' plant status, onsito followup of
plant events, onsite followup of written reports of nonroutine events, monthly
maintenance observations, monthly surveillance observations, operational safety
-
verification, spent fuel pool activities, and refueling activities.
Within
these areas, the inspection consisted of selective examination of procedures
End representative records, interviews with personnel, and observations by the
NRC inspectors.
The inspection findings are documented in the enclosed
~ inspection report.
-
,
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
,
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 4 of-the enclosed report.
,
The response directed by this letter and the enclosed. Notice is not subject to
.the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
t
.
.
JEBess/1r
RJE
s
JITapia
DMHunn utt
EHo11er.
LMilgoan
10 /19/89
/o /13 /89 10//$ /89 /o /13 /89
/o//6/89,
/0/ / F89
.
fS
i\\
8910260049 091019
'
ADOCK 05000490 ;
L.,
. .
. . . ,
,
.
PNV
G
,
m ', ;., (
,
,
'
+
.,
,
,
.
j '(,
-
'
'
Houston Lighting & Power Company
-2-
,
J'
,
J
Should you have any questions concerning this inspection, we will be pleased to ~
discuss them with you.
~
,
Sincerely,
\\
Onoind SDn'd BY
Ttomas P.Gwynn
James L. Milboan Director
Division of. Reactor Projects
Enclosure:
1.
Appendix A - Notice of Violation
2.-
Appendix B - NRC Inspection Report
50 498/89-38
50-499/89-38
cc w/ enclosure:
Brian Berwick, Esq.
Assistant Attorney General
Environmental Protection Division
P.O. Box 11548
Capitol Station
'
Houston Lighting and Power Company
ATTN:
J. T. Westermeier, General Manager
South Texas Project
P.O. Box 289
'
Houston, Texas 77483
.
Houston Lighting and Power Company
ATTN:
M. A. McBurnett, Manager
Operations Support Licensing
P.O. Box 289
t
Wadsworth, Texas .77483
City of Austin Electric Utilitv
ATIN:
R. J. Miner, Chief Oper'ating
Officer (2 copies)
721 Barton Springs Road
0
i
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
i
P.O. Box 1771
'
-
San Antonio, Texas 78296
-
.
a
et
'
,
sk'
3
'a .
, . ,
4,
}
p[ ..
Lighting & Power Company
-3-
-
-
,
.
[
41C Corporation
'
,6
- . E. T. Molnar/L. W. Hurst
,
"y
.0.> Box 2166
i
+ Nouston,, Texas 77252-2166
!
l
'
Newman & Holtzinger, P. C.
v
ATIN:
Jack R. Newman, Esq.
'
1615 L Street, NW
Washington, D.C.
20036
'
,,
C:ntral Power and Light Company
'
ATTN:
R. P. Verret/R. L. Range
!
P.O. Box 2121
i
'
C:rpus Christi, Texas 78403--
,
B:ker & Botts
ATTN: Melbert Schwartz, Jr., Esq.
,
,
l
One Shell Plaza
i
l
'H:uston, Texas 77002
'
I
D:ub, Muntzing and Glasgow
l
Att:rneys at Law
-
Suite 400
I
'
808 Seventeenth Street, N.W.
l
Washington, D.C.: 20006
i
1
>
Rec:rds Center
1100 Circle 75 Parkway
e ;
Atlanta, Georgia 30339-3064
,
U.S. . Nuclear Regulatory Commission
i
,
ATTN:
Resident Inspector
i'
P.O.. Box 910
!
,
Bay. City, Texas 77414
!
t
Ms. Iris J. Jones
i
l
Acting City Attorney
City of Austin.
!
P.O. Box 1088
!
>
~
l
.
!
-Houston Lighting & Power Company
l
'
l
AT.TN: ~ S. L. Rosen, Vice President
J
l
Nuclear Engineering and
^
. Construction
P.O. Box 289
l
.
Wadsworth, Texas 77483
i
i
4
1
'
<
I
L
.
.