Application for Amends to Licenses DPR-29 & DPR-30,modifying Tech Spec Requirements for Jet Pump Flow Indication
ML19325C904
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/11/1989
From: Stols R
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
Shared Package
ML19325C905 List:
References
0315T, 315T, NUDOCS 8910180077
Download: ML19325C904 (2)


Text

q

^

~

9

,j.s %s"

,M'*

s *#

  • \\

g i

- rP West Adams Street, Chicago, Dhnos l

!" c' i

ld;

'\\

) X6diesTRepij to: P5 sin 5 B5776T-4 i

\\d Chicago, liknois 60090 - 07c7 -

i Q'

j

. 0ctober 11, 1989 l

o*

'i l.

1 Dr. Thomas E. Murley, Director l

0*fice of Nud ear Reactor Regulation-U.S. Nuclear Regulatory Commission i

Washington, DC 20555 I

l

!s

-Subjeri:- Quad Cities Statlon Units 1 and 2 Appilcation for Amendment to Facility Operating Licenses DPR-29 and DPR-30, e

Appendix A Technical Specifications NRC Docket Nos. 50-254 and 50-265 i

References (a):

R. L. Bolger to B. C. Rusche letter l

4 dated September 19, 1975 u

(b):

G. A. Abre11 to D. L, Ziemann letter t

dated March 3, 1976

)

(c):

J. R. Hojnarowski to H.- R. Denton letter dated January 28, 1986

[

L (d):

I, M. Johnson to T. E. Murley letter dated November 16, 1987 Dr. Murley t

Pursuant to 10 CFR 50;90 Commonwealth Edison proposes to amend l'

Appendix A, Technical Specification to facility Operating License DPR-29 and L

DPR-30 for the Quad Cities Nuclear Power Station.

The proposed changes, enclosed in Attachment 1, modify the Technical Specification requirements for jet pump flow indication.

Similar Technical Specifications have been

?

previously proposed in references (a) through (d).

The proposed changes are further described in Attachments 2 and 3.

l L:

The proposed changes have been re/lewed and approved by both On-site and Off-site Review in accordance with Commonwealth Edison Company's t

procedures.

The proposed amendment has been reviewed in accordance with 10 CFR 50.92(c) and it has been determined that the proposed amendment does not

. involve a significant hazards consideration.

The evaluation is documented in Attachmeat 4.

G910180oy7 99yog3 hDR ADOCK 050002r4 l

PDU 1

0315T:1

  • ,-~,

m

, ~,

- -.. ~ - -

m

.q r

is

(

Dr. T.E. Murley October 11, 1989

}

4 Commonwealth Edison is notifying the State of Illinois by providing a

(

copy of this letter and the Attachments to the designated State Official.

L i

Please direct any questions you may have regarding this matter to t

.this office.

l Very truly yours, R. Stols Nuclear Licensing Administrator 1m Attachments 1:

7toposed changes to Appendix A Technical Specifications 2:

Summary of Changes 3: Description and Bases for Amendment Request 4:

Evaluation of No Significant Hazards Consideration 5: General Electric Report EAS 07-0289 " Safety Evaluation to Justify Operation with Loss of Jet Pump-flow Indication for Quad Cities Units I and 2" dated March, 1989 6: Summary and Justification for Corrective Action on Unit 1 Jet Pump Seven dated February 1989 cc:

Document Contro! Desk - U.S. NRC

.R.L. Higgins - Senior Resident Inspector, Quad Cities T.M. Ross - Project Manager, NRR Office of Nuclear facility - IDNS 0315T:2

>