Informs NRC of Licensee Schedule for Providing Final Response to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs. Response Delayed Until 891122
ML19324C325
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/09/1989
From: Rosenblum R
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-07, GL-89-7, NUDOCS 8911160135
Download: ML19324C325 (2)


Text

((

.,.t

  1. 4:

c t

,y Southem Califomia Edison Company

+

P. O. BOX 800 2344 WALNUT OROVE AVENUE ROSEMgf C, CALirORNIA 91770

"' "..".S$[a"o"I" i.I'."C 5.. '

November 9, 1989 uca.a uoutuon u..

b J

'Y U. ~ S. Nuclear Regulatory Commission

-Attention:

Document Control Desk Washington, D.'C.

20555 Gentlemen:

Subject:

Docket Nos. 50-206, 50-361 and 50-362 Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs - Generic Letter 89-07 San Onofre Nuclear Generating Station Units 1,'2 and 3

Reference:

' October 27, 1989 letter from H. E. Morgan (SCE) to Document Control Desk (NRC).

Subject:

Docket 50-206, 50-361 and 50-362; San Onofre Nuclear Generating Station Units 1, 2 and 3; 10.CFR 50.54(p) Changes; Safeguards-Contingency Plan, Revision 7 The purpose of this letter is to inform the NRC of Southern California Edison's (SCE's) schedule for providing the final response to Generic Letter l

89-07:

" Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs" for San Onofre Units 1, 2 and 3.

As requested by this Generic Letter 89-07, short-term actions that could be taken to protect against attempted radiological sabotage involving a land vehicle bomb if such a threat were to materialize have been included in San Onofre safeguards contingency planning and were provided to the NRC by the above reference. However, the formal engineering evaluation of potential vulnerability of San Onofre required by Generic Letter 89-07 is still in the final review and approval D

3o03

$$b yc LECOS iI

a p

1' A

_=,6

~

Document Control Center.

2 November 9, 1989 i

t l.

l

+

process. As discussed on November 9, 1989 with Mr. L. E. Kokajko,.NRC Project Manager for San Onofre Units 2 and 3, the response to this generic letter will be delayed until November 22, 1989.

If you have any. questions, please feel free to call me.

b L-Very truly yours b

l t

TDMercurio/lVBDL cc:

J. B. Martin, Regional Administrator, NRC Region V j

C. Caldwell, NRC Senior Resident Inspector, San Onofre l

Units 1, 2 and 3 i

u.

l.

1,-

1.

l 1

1:

1 I

l' L

..