Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217K8901999-10-18018 October 1999 TS Change Request NPF-38-224 for License NPF-38,modifying TS 3.6.2.2 LCO to Allow Plant to Operate with Two Independent Trains of Containment Cooling,Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20210M9761999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One HPSI Train Inoperable & TS 3.5.3 to Change end-state to Hot Shutdown with at Least One Operable Shutdown in Operation ML20210M9601999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One LPSI Train Inoperable & Allowed Outage Time of 72 Hours Imposed for Other Conditions ML20210H1401999-07-29029 July 1999 TS Change Request NPF-38-220 to License NPF-38,modifying TS 3.8.1.1 & Associated Bases by Extending EDG Allowed AOT from 72 H to Ten Days ML20210H2091999-07-29029 July 1999 TS Change Request NPF-38-221 to License NPF-38,modifying TS 3.6.2.1 to Extend Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3181999-07-19019 July 1999 TS Change Request NPF-38-219 for License NPF-38,modifying TS 4.5.2.f.2 by Increasing Performance Requirement for LPSI Pumps ML20210D0831999-07-15015 July 1999 TS Change Request NPF-38-216 to License NPF-38,adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20210D0341999-07-15015 July 1999 TS Change Request NPF-38-217 to License NPF-38,creating New TS for Feedwater Isolation Valves to Ts.Unreviewed Safety Question Re Crediting of Rt Override Feature & AFW Pump High Discharge Pressure Trip,Provided ML20209H3051999-07-15015 July 1999 Application for Amend to License NPF-38 to Modify TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 Efpy.Proprietary Rept 51-1234900-00 Encl.Proprietary Encl Withheld,Per 10CFR2.790 ML20195B1771999-05-20020 May 1999 Application for Amend to License NPF-38 to Change TS Bases B 3/4.3.1 & 3/4.3.2,B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20198G2311998-12-23023 December 1998 Application for Amend to License NPF-38,modifying LCO for TS 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20154E1011998-10-0101 October 1998 Tech Spec Change Request NPF-38-211 to License NPF-38, Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20153D5571998-09-23023 September 1998 Emergency TS Change Request NPF-38-210 to License NPF-38, Addressing Functional Requirements of 10-4% Bistable of Rps. TS Change Request NPF-38-21 Replaces 980918 Request Entirely ML20153B4381998-09-18018 September 1998 Emergency Application for Amend to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints & Table 3.3-1 Re Reactor Protective Instrumentation.Application Supersedes 980911 Submittal ML20151W5791998-09-11011 September 1998 TS Change Request NPF-38-210 to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7901998-08-12012 August 1998 Application for Amend to License NPF-38,increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7281998-07-29029 July 1998 Application for Amend to License NPF-38 to Revise TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model.Request Associated W/Methodology Used to Obtain SBLOCA Results ML20249C7861998-06-29029 June 1998 TS Change Request NPF-38-205 to License NPF-38,modifying TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection & Associated Bases ML20249C8301998-06-29029 June 1998 Application for Amend to License NPF-38,revising Control Room Ventilation TS to Be More Consistent w/NUREG-1432 ML20248B7441998-05-28028 May 1998 Application for Amend to License NPF-38 to Change TS 3.7.1.2,surveillance Requirement 4.7.1.2 & Bases Change for Emergency Feedwater Sys ML20217D4921998-03-25025 March 1998 Rev 1 to 960718 TS Change Request NPF-38-177 to License NPF-38,correcting Discrepancy in Original Submittal & Incorporating Addl Changes to Improve Clarity of TS 3.9.8.1 & TS 3.9.8.2 ML20199A1031997-11-13013 November 1997 TS Change Request NPF-38-202 to License NPF-38,modifying TS 6.8.4.a, Primary Coolant Sources Outside Containment, to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217G2351997-10-0707 October 1997 Application for Amend to License NPF-38,modifying TS 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8091997-09-25025 September 1997 Application for Amend to License NPF-38,modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G6951997-07-0707 July 1997 Application for Amend to License NPF-38,supplementing TS Change Request NPF-38-179 by Modifying Value Previously Submitted to Prevent Vortexing & Value for Short Term Requirements of CCW Makeup Sys & Expand Applicability of TS ML20141D8471997-06-26026 June 1997 Application for Amend to License NPF-38,revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20148G6221997-06-0303 June 1997 Suppl to 960717 TS Change Request NPF-38-179,providing Updated Info Based on Min Required Level in Condensate Storage Pool.Attachment a Contains Original Vortexing Calculation & Attachment B Contains Revised Calculation ML20140B1591997-06-0303 June 1997 Application for Amend to License NPF-38,consisting of TS Change Request NPF-38-108,revising Action Requirements for TS 3/4.3.2 for Safety Injection Sys Sump RAS ML20141K1911997-05-24024 May 1997 TS Change Request NPF-38-197 to License NPF-38,modifying TS 3/4.7.4 Re Ultimate Heat Sink,Table 3.7-3 by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20141K1611997-05-24024 May 1997 TS Change Request NPF-38-196 to License NPF-38,modifying Specifications 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1 by Removing Cycle Dependent Boron Concentration & Boration Flow Rate from Action Statements ML20137T4251997-04-11011 April 1997 Application for Amend to License NPF-38,deleting TS 3.7.1.3, Action (B) & Associated Surveillance Requirement ML20137T4451997-04-11011 April 1997 Application for Amend to License NPF-38,making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis ML20137T3971997-04-11011 April 1997 Application for Amend to License NPF-38-195,modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137P2561997-04-0707 April 1997 Application for Amend to License NPF-38,deleting TS 4.8.1.1.2a.7 & Incorporating 184 Day Fast Start Test Requirement as 4.8.1.1.2d,renumber Subsequent Requirements & Adding Footnote as Indicated ML20137G4711997-03-27027 March 1997 TS Change Request NPF-38-192 to License NPF-38,modifing TS 3/4.5.2, ECCS Subsystems Modes 1,2 & 3 ML20137F9201997-03-27027 March 1997 TS Change Request NPF-38-191 to License NPF-38,modifying TS Surveillance Requirements 4.5.2.d.3 & 4.5.2.d.4 Re Granular Trisodium Phosphate Dodecahydrate ML20137G2021997-03-27027 March 1997 Application for Amend to License NPF-38,increasing SFP Storage Capacity & Increasing Maximum Fuel Enrichment from 4.9 W/O to 5.0 W/O U-235.Proprietary & Nonproprietary Repts HI-971628 Encl.Proprietary Rept Withheld ML20134F7091997-02-0505 February 1997 Application for Amend to License NPF-38,requesting to Increase Minimum Boron Concentration in Safety Injection Tanks & Refueling Water Storage Pool to 2050 Ppm ML20135A7661996-12-0202 December 1996 Application for Amend to License NPF-38,permitting Use of 10CFR50,App J,Option B Re performance-based Containment Leakage Testing for Type A,B & C Leak Rate Testing ML20134L6771996-11-18018 November 1996 Application for Amend to License NPF-38,requesting Rev to Change Testing Requirement for Shutdown Cooling Sys Suction Line Relief Valves to Test in Accordance W/Ts 4.0.5 ML20134L1901996-11-15015 November 1996 Application for Amend to License NPF-38,requesting Revision to Scope of Limiting Condition for Operation 3.6.3 Re Containment Isolation ML20128Q1661996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 185,expanding Applicability for CPC Operability & Allowing for Application of Cycle Independent Shape Annealing Matrix ML20128Q2221996-10-16016 October 1996 Application for Amend to License NPF-38,requesting That Change Request 182,permit Use of 10CFR50,App J,Option B, Performance-Based Containment Leakage Testing ML20128Q1871996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 183,extending Allowable Time for Core Operating Limit Supervisory Sys OOS by Monitoring for Adverse Trends ML20128Q2091996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 186,relocating Certain Adminstrative Controls to QA Program Manual & Changing Shift Coverage from 8 H day,40 H Wks to Option of 8 or 12 H Days & Nominal 40 H Wks ML20116B0461996-07-25025 July 1996 Application for Amend to License NPF-38,modifying TS 3/4.7.4 Ultimate Heat Sink by Incorporating More Restrictive Fan Operability Requirements & Lower Basin Temp ML20115G5071996-07-18018 July 1996 Application for Amend to License NPF-38,revising TS 3.9.8.1, Shutdown Cooling & Coolant Circulation High Water Level & TS 3.9.8.2, Shutdown Coolant Circulation Low Water Level ML20116D0071996-07-17017 July 1996 Application for Amend to License NPF-38,consisting of Change Request 174,extending Surveillance Interval for Rtbs from Monthly to Quarterly & Increasing AOT for Operation W/Inoperable Rtb from One H to Two H ML20115G2811996-07-17017 July 1996 Application for Amend to License NPF-38,reflecting That Name La Power & Light Co Has Been Changed to Entergy Louisiana,Inc ML20115G4901996-07-17017 July 1996 Application for Amend to License NPF-38,modifying Spec 3/4.7.1.3 Condensate Storage Pool by Increasing Minimum Required Contained Water Vol from 82% to 91% Indicated Level 1999-08-04
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217K8901999-10-18018 October 1999 TS Change Request NPF-38-224 for License NPF-38,modifying TS 3.6.2.2 LCO to Allow Plant to Operate with Two Independent Trains of Containment Cooling,Consisting of One Fan Cooler Per Train,Operable During Modes 1,2,3 & 4 ML20210M9761999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One HPSI Train Inoperable & TS 3.5.3 to Change end-state to Hot Shutdown with at Least One Operable Shutdown in Operation ML20210M9601999-08-0404 August 1999 Application for Amend to License NPF-38,to Modify TS 3.5.2 to Extend Allowed Outage Time to Seven Days for One LPSI Train Inoperable & Allowed Outage Time of 72 Hours Imposed for Other Conditions ML20210H1401999-07-29029 July 1999 TS Change Request NPF-38-220 to License NPF-38,modifying TS 3.8.1.1 & Associated Bases by Extending EDG Allowed AOT from 72 H to Ten Days ML20210H2091999-07-29029 July 1999 TS Change Request NPF-38-221 to License NPF-38,modifying TS 3.6.2.1 to Extend Allowable Outage Time to Seven Days for One Containment Spray Sys Train Inoperable ML20210B3181999-07-19019 July 1999 TS Change Request NPF-38-219 for License NPF-38,modifying TS 4.5.2.f.2 by Increasing Performance Requirement for LPSI Pumps ML20210D0831999-07-15015 July 1999 TS Change Request NPF-38-216 to License NPF-38,adding TS Bases Control Program to TS Administrative Controls Section & Correcting Editorial Error Identified in TS Following Issuance of Amend 146,dtd 981019 ML20210D0341999-07-15015 July 1999 TS Change Request NPF-38-217 to License NPF-38,creating New TS for Feedwater Isolation Valves to Ts.Unreviewed Safety Question Re Crediting of Rt Override Feature & AFW Pump High Discharge Pressure Trip,Provided ML20209H3051999-07-15015 July 1999 Application for Amend to License NPF-38 to Modify TS 3/4.4.8.1,Figures 3.4-2 & 3.4-3 to Extend RCS Pressure Temperature Curves to 20 Efpy.Proprietary Rept 51-1234900-00 Encl.Proprietary Encl Withheld,Per 10CFR2.790 ML20195B1771999-05-20020 May 1999 Application for Amend to License NPF-38 to Change TS Bases B 3/4.3.1 & 3/4.3.2,B 3/4.6.3,B 3/4.7.1.2 & B 3/4.7.12 ML20198G2311998-12-23023 December 1998 Application for Amend to License NPF-38,modifying LCO for TS 3.3.3.7.1 for Chlorine Detection Sys by Changing Alarm/Trip Setpoint from 3 Ppm to 2 Ppm ML20154E1011998-10-0101 October 1998 Tech Spec Change Request NPF-38-211 to License NPF-38, Modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20153D5571998-09-23023 September 1998 Emergency TS Change Request NPF-38-210 to License NPF-38, Addressing Functional Requirements of 10-4% Bistable of Rps. TS Change Request NPF-38-21 Replaces 980918 Request Entirely ML20153B4381998-09-18018 September 1998 Emergency Application for Amend to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints & Table 3.3-1 Re Reactor Protective Instrumentation.Application Supersedes 980911 Submittal ML20151W5791998-09-11011 September 1998 TS Change Request NPF-38-210 to License NPF-38,modifying Notes in Table 2.2-1 Re Reactor Protective Instrumentation Trip Setpoints Limits & Table 3.3-1 Re Reactor Protective Instrumentation ML20237A7901998-08-12012 August 1998 Application for Amend to License NPF-38,increasing Max Boron Concentration in SITs & Rwsp from 2300 Ppm to 2900 Ppm ML20236U7281998-07-29029 July 1998 Application for Amend to License NPF-38 to Revise TS 6.9.1.11.1 to Replace Ref to Abb Combustion Engineering SBLOCA ECCS Performance Evaluation Model.Request Associated W/Methodology Used to Obtain SBLOCA Results ML20249C8301998-06-29029 June 1998 Application for Amend to License NPF-38,revising Control Room Ventilation TS to Be More Consistent w/NUREG-1432 ML20249C7861998-06-29029 June 1998 TS Change Request NPF-38-205 to License NPF-38,modifying TS 3.3.3.7.1, Chlorine Detection Sys & TS 3.3.3.7.3, Broad Range Gas Detection & Associated Bases ML20248B7441998-05-28028 May 1998 Application for Amend to License NPF-38 to Change TS 3.7.1.2,surveillance Requirement 4.7.1.2 & Bases Change for Emergency Feedwater Sys ML20217D4921998-03-25025 March 1998 Rev 1 to 960718 TS Change Request NPF-38-177 to License NPF-38,correcting Discrepancy in Original Submittal & Incorporating Addl Changes to Improve Clarity of TS 3.9.8.1 & TS 3.9.8.2 ML20199A1031997-11-13013 November 1997 TS Change Request NPF-38-202 to License NPF-38,modifying TS 6.8.4.a, Primary Coolant Sources Outside Containment, to Add Portions of Containment Vacuum Relief Sys & Primary Sampling Sys to Program ML20217G2351997-10-0707 October 1997 Application for Amend to License NPF-38,modifying TS 3.3.3.7.3 & Surveillance Requirement 4.3.3.7.3 for Broad Range Gas Detection Sys ML20211F8091997-09-25025 September 1997 Application for Amend to License NPF-38,modifying LCO 3.6.1.2, Containment Leakage, Associated Action & SR 4.6.1.2 ML20141G6951997-07-0707 July 1997 Application for Amend to License NPF-38,supplementing TS Change Request NPF-38-179 by Modifying Value Previously Submitted to Prevent Vortexing & Value for Short Term Requirements of CCW Makeup Sys & Expand Applicability of TS ML20141D8471997-06-26026 June 1997 Application for Amend to License NPF-38,revising TS Tables 3.7-1 & 3.7-2 by Changing MSSVs Orifice Size from 26 Inches to 28.27 Inches & Relocating Orifice Size from TS to TS Bases ML20148G6221997-06-0303 June 1997 Suppl to 960717 TS Change Request NPF-38-179,providing Updated Info Based on Min Required Level in Condensate Storage Pool.Attachment a Contains Original Vortexing Calculation & Attachment B Contains Revised Calculation ML20140B1591997-06-0303 June 1997 Application for Amend to License NPF-38,consisting of TS Change Request NPF-38-108,revising Action Requirements for TS 3/4.3.2 for Safety Injection Sys Sump RAS ML20141K1911997-05-24024 May 1997 TS Change Request NPF-38-197 to License NPF-38,modifying TS 3/4.7.4 Re Ultimate Heat Sink,Table 3.7-3 by Incorporating More Restrictive Dry Cooling Tower Fan Requirements & Changes Wet Cooling Tower Water Consumption in TS Bases ML20141K1611997-05-24024 May 1997 TS Change Request NPF-38-196 to License NPF-38,modifying Specifications 3.1.1.1,3.1.1.2,3.10.1 & Figure 3.1-1 by Removing Cycle Dependent Boron Concentration & Boration Flow Rate from Action Statements ML20137T4251997-04-11011 April 1997 Application for Amend to License NPF-38,deleting TS 3.7.1.3, Action (B) & Associated Surveillance Requirement ML20137T3971997-04-11011 April 1997 Application for Amend to License NPF-38-195,modifying TS 3.3.3.7.3 & SR 4.3.3.7.3 for Broad Range Gas Detection Sys ML20137T4451997-04-11011 April 1997 Application for Amend to License NPF-38,making TS 3.6.2.2 & Surveillance Requirement 4.6.2.2 Consistent W/Containment Cooling Assumptions in Waterford 3 Containment Analysis ML20137P2561997-04-0707 April 1997 Application for Amend to License NPF-38,deleting TS 4.8.1.1.2a.7 & Incorporating 184 Day Fast Start Test Requirement as 4.8.1.1.2d,renumber Subsequent Requirements & Adding Footnote as Indicated ML20137G4711997-03-27027 March 1997 TS Change Request NPF-38-192 to License NPF-38,modifing TS 3/4.5.2, ECCS Subsystems Modes 1,2 & 3 ML20137F9201997-03-27027 March 1997 TS Change Request NPF-38-191 to License NPF-38,modifying TS Surveillance Requirements 4.5.2.d.3 & 4.5.2.d.4 Re Granular Trisodium Phosphate Dodecahydrate ML20137G2021997-03-27027 March 1997 Application for Amend to License NPF-38,increasing SFP Storage Capacity & Increasing Maximum Fuel Enrichment from 4.9 W/O to 5.0 W/O U-235.Proprietary & Nonproprietary Repts HI-971628 Encl.Proprietary Rept Withheld ML20134F7091997-02-0505 February 1997 Application for Amend to License NPF-38,requesting to Increase Minimum Boron Concentration in Safety Injection Tanks & Refueling Water Storage Pool to 2050 Ppm ML20135A7661996-12-0202 December 1996 Application for Amend to License NPF-38,permitting Use of 10CFR50,App J,Option B Re performance-based Containment Leakage Testing for Type A,B & C Leak Rate Testing ML20134L6771996-11-18018 November 1996 Application for Amend to License NPF-38,requesting Rev to Change Testing Requirement for Shutdown Cooling Sys Suction Line Relief Valves to Test in Accordance W/Ts 4.0.5 ML20134L1901996-11-15015 November 1996 Application for Amend to License NPF-38,requesting Revision to Scope of Limiting Condition for Operation 3.6.3 Re Containment Isolation ML20128Q2091996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 186,relocating Certain Adminstrative Controls to QA Program Manual & Changing Shift Coverage from 8 H day,40 H Wks to Option of 8 or 12 H Days & Nominal 40 H Wks ML20128Q2221996-10-16016 October 1996 Application for Amend to License NPF-38,requesting That Change Request 182,permit Use of 10CFR50,App J,Option B, Performance-Based Containment Leakage Testing ML20128Q1871996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 183,extending Allowable Time for Core Operating Limit Supervisory Sys OOS by Monitoring for Adverse Trends ML20128Q1661996-10-16016 October 1996 Application for Amend to License NPF-38,consisting of Change Request 185,expanding Applicability for CPC Operability & Allowing for Application of Cycle Independent Shape Annealing Matrix ML20116B0461996-07-25025 July 1996 Application for Amend to License NPF-38,modifying TS 3/4.7.4 Ultimate Heat Sink by Incorporating More Restrictive Fan Operability Requirements & Lower Basin Temp ML20115G5071996-07-18018 July 1996 Application for Amend to License NPF-38,revising TS 3.9.8.1, Shutdown Cooling & Coolant Circulation High Water Level & TS 3.9.8.2, Shutdown Coolant Circulation Low Water Level ML20116D0071996-07-17017 July 1996 Application for Amend to License NPF-38,consisting of Change Request 174,extending Surveillance Interval for Rtbs from Monthly to Quarterly & Increasing AOT for Operation W/Inoperable Rtb from One H to Two H ML20115G2811996-07-17017 July 1996 Application for Amend to License NPF-38,reflecting That Name La Power & Light Co Has Been Changed to Entergy Louisiana,Inc ML20115G4901996-07-17017 July 1996 Application for Amend to License NPF-38,modifying Spec 3/4.7.1.3 Condensate Storage Pool by Increasing Minimum Required Contained Water Vol from 82% to 91% Indicated Level 1999-08-04
[Table view] |
Text
M
,q- 7 I. Loulalana Power & Light Company
' "'> e '
~~~'s:I.-
{<
P 'O, Box 60340 Now Orloana, LA 70160-0340 Tot. 504 605 2781 J. G. Dewease L.
o Sena vec Presutant-Nuckw Oswatsons W3P88-1287
, , A4.05 November 3, 1989 9^
U.S. Nuclear Regulatory Commission
' ATTN:. Document' Control Desk Washington, D.C. 20555' Sub,)ects Waterford 3 SES 1 L Docket No. 50-382 License No. NPF-38 Technical Specification Change Request NPF-38-105 -
. Gentlemen:
The proposed change adds a series of Technical Specificationc to include explicit operability requirements for the main f eedwater isolation valves, main feedwater, control valves (consisting of one feedwater regulating valve and one associated startup feedwater regulating valve for each stcam generator), and feedwater regulating bypass valves, along with the main
-steam-isolation valves currently addressed by Technical Specification 13/4.7.1.5. Proposed Technical Specification 3/4.7.1.5.1 through p 3/4.7.1.5.5. provide specific measures to address valve inoperability.
Should you have any questions or comments on this matter, please feel free to contact Steven Farkas at (504) 464-3383.
Very truly yours, i
~ -
\
J.p. Dewcase Mnior Vice President Nuclear Operations i I
.JGD:SEF saf ,
i
{
Attachments: NPF-38-105 cc: R.D. Martin F.J. Hebdon D.L. Wigginton NRC Resident inspectors Office E.L. Blake '
W.M. Stevenson Administrator Nuclear Energy Division (State of Louisiana)
American Nuclear Insurers 8911150061 891103 l' i
\
PDR ADOCK 05000382 ji P PDC 3
{" lTw" l ' ,1s * , -
- ~
y ;f ,
n-L : .)'.,, s' .
< \ -
.,7 .s , . v u . ! *l. :t , : ',:
, s.
t
,9 UNITED STATES OF AMERICA-NUCLEAR REGULATORY COMMISSION.
a4 o
.I 3 p .- s L
4 In'the matter of )
)
$ Louisiana Power &' Light Company ) Docket No. 50-382-Waterford 3 Steam Electric Station .)
s-h wi U . AFFIDAVIT J.G. Dewease, being duly sworn, hereby deposes and says that he is Senior Vice President - Nuclear Operations'of Louisiana Power & Light Company;
>- that he is duly authorized to. sign and file with-the. Nuclear Regulatory
, J: Commission,the attached. Technical Specification Change; Request NPF-38-105;.
~, ';
that he is' familiar with the content thereof;-and that the matters set-forth therein are true.and correct to the best of his knowledge, 4
information and belief. ,
Al\^ D% S
' J.f. DWeasi V pnior Vice President Nuclear Operations
/
STATE OF LOUISIANA)
) se L . PARISH OF ORLEANS )
i i
Subscribed and sworn to before me, a Notary Public in and for the Parish and.Statt above named this dM h day of 7/17&ido/A.J ,
l 1989. L l '.
i
~~
/ Notary Public (f
- y. My Commission expires hl .
b .
i
(
~
- r. ,s ,
L' c ,
& M. .o l:
( ,
u b' DESCRIPTION AND SAFETY ANALYSIS
[ia 0F PROPOSED CHANGE NPF-38-105-P-
The proposed change shown in-Attachment B replaces, in its entirety, Technical. Specification 3/4.7.1.5: Main' Steam Line Isolation Valves, with L
new technical specifications:
h i 3/4.7.1.5.1-and 3/4.7.1.5.2: Main Steam Isolation Valves 3/4.7.1.5.3 and 3/4.7.1.5.4 Feedwater Isolation Valves t I
- 3/4.7.1.b.5 ' Feedwater Control- Valves 7
Existing Specifications See Attachment A Proposed Specifications > I L
See Attachment B Description L
4 'The proposed change adds a series of Technical Specifications to include explicit operability requirements for the main f eedwater isolation valves, main feedwater control valves (consisting of one feedwater regulating valve and one associated startup feedwater regulating valve for each steam e generator), and feedwater regulating bypass valves, along with the main
[ steam isolation valves currently addressed by Technical Specification i:
3/4.7.1.5.
The proposed change adds new technical specification requirements explicitly addressing operability, action and surveillance requirements for main feedwater isolation valves, main feedwater control valves, and
' f eedwater regulating bypass valves. The addition of LCOs, action ,
statements, and surveillances for main f eedwater control and isolation ;
, valves provides assurance that conservative plant conditions exist with ,
respect to the FSAR Chapter 15 safety analysis. The new inclusions in Technical Specifications highlight the importance of main feedwater control valves and f eedwater regulating bypass valves.
Technical Specification 3/4.7.1.5 currently (re Attachment A) defines operability requirements for MSIVs and actions when one or both MSIVs are inoperable. The operability requirements for the MSIVs ensure no more than one steam generator blows down in the event of a main steam line rupture, assuming a single failure. Ensuring only one steam generator blows down prevents exceeding the containment design pressure and limits positive reactivity addition during reactor coolant system cooldown. Equally important in mitigating the consequences of these events are the main feedwater isolation valves (MFIVs) and the feedwater regulating and startup feedwater regulating valves. These valves close on a main steam isolation signal (MSIS) and limit the amount of water entering the steam generator.
Response times for main steam isolation and main feedwater isolation are part of the overall engineered safety features actuation system response times in Technical Specification 3/4.3.2 Table 3.3-5: Engineered Safety Features (ESF) Response Times. Technical Specification 3/4.3.2 actions address only instrumentation inoperability.
1
y'
, c-r a .. .
( ;s - b ,
- 4 E The containment isolation specification, 3/4.6.3 (shown in Attachment B),
h , ', provides specific action when listed ESF valves are mechanically i inoperable. Listed. valves include main steam isolation and main feedwater h isolation-valves. ~ Technical Specifications should cover all the operating
}. assumptions made in the plant safety analysis. However, the feedwater e control valves do not appear in 3/4.6.3 because containment isolation is L not their design basis. Neither do feedwater control valves appear in any i_ other specification. Yet,. FSAR 10.4.7.2 assumes feedwater contro', valves
!' backstop feedwater isolation valves. LP&L proposes to revise 3/4.6.3 so
- 'MSIVs and feedwater valve requirements are all in 3/4.7.1.5.
s
.The MSIVs and main feedwater control valves close upon a receipt of a MSIS.
The f eedwater regulating bypass valves are normally closed. The .nain i feedwater control valves terminate feedwater flow to the associated steam generator (like the MFIVs). And, they fulfill the safety function assumed in the safety analysis for a main steam system rupture (re NUREG-0138, Issue 1). Thus, the main feedwater control valves provide a degree of redundancy to the MFIVs when the feedwater regulating bypass valves are closed (re-FSAR 10.4.7.2, page 10.4-19). Because of this redundancy, a 72-hour ACTION statement is proposed for the MFIVs main feedwater control valves and ieedwater regulating bypass valves.
The 72-hour ACTION statement matches other specifications relying on 4
redundant equipment, e.g., ECCS and diesel generators. However, LP&L l
proposes a 4-hour ACTION statement should either both MFIVs, two control valves in different trains, or a MFIV and control valves in the same train become inoperable. The MSIV ACTION statement will remain at 4-hours because it has no complementary equipment. This 4-hour ACTION matches the current containment isolation specification. This proposal also updates the containment isolation specification to refer to the new specifications for MSIVs, MFIVs, and feedwater control valves. The 72-hour feedwater o valve ACTION statements keep the plant from entering unnecessary transients when redundant equipment can complete the safety function i.e., main feedwater isolation on MSIS.
Surveillance Requirement 4.7.1.5 currently requires verification of operable MSIVs. The proposed change expands surveillances to include the MFIVs, main feedwater control valves, and feedwater regulating bypass valves. The proposed surveillances require closing each fast-acting valve on its appropriate actuation signal at least once per eighteen months. ,
The proposed change also revises the Bases to Technical Specification 3/4.7.1.5 to cover both main steam isolation and main feedwater isolation.
Specifically, the new Bases 3/4.7.1.5 clarifies the functions of the MSIVs and the valves required for main feedwater isolation following a main cteam or feedwater line rupture.
l 2
(:',,
m (r/_biW.; ..
p h .. i Safety Analysis-
{? , ,
The proposed changes discussed above shall be deemed to involve a significant hazards' consideration if there is a positive finding in any one of the following areas
>~ .
- 1. 'Will operation of the facility in accordance with this proposed change b involve a:significant increase in the probability or consequence of an accident previously evaluated?
g Response: No.
- ' The proposed change defines the required ACTIONS for the main steam p and main feedwater isolation valves, main feedwater control valves,
(~ and feedwater regulating bypass valves .which currently exists
[ explicitly only for the MSIVs and subtly for MFIVs. These changes E increase the consistency between plant operation and accident analyses.
6.
assumptions, avoiding potentially unacceptable consequences for design basis steam or feedwater line breaks. Therefore, operation of the facility in accordance with this proposed change does not involve a
~
significant increase in the probability or consequences of an accident previously evaluated.
~
- 2. Will cperations of the facility in accordance with'this proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
!' Responset. No.
L The proposed change does not alter the design of the plant or equipment operation. Therefore, the proposed change does not create the pocsibility of a new or different kind of accident from any accident previously evaluated.
- 3. Will operation of the facility.in accordance with this proposed change g involve a significant reduction in a margin of safety? :
1 Response: No.
The proposed change does not reduce the effectiveness of the main steam and main feedwater isolation valves. Therefore, the proposed change will not involve a significant reduction in a margin of safer.y.
The Commission has provided guidance concerning the application of j standards for determining whether a significant hazards consideration i exists by providing certain examples (48 FR 12870) of amendments that are '
considered not likely to involve significant hazards consideration.
i f
3 i
KV"" ,
', ^ ;
. n . ^^
c '
- w . .
, , Example (ii) . relates to a . change that' constitutes an additional limitation, h restriction..or control not presently included in the technical pg7 specifications. . In the accident analyses, the main steam and main
~'
feedwater isolation. valves and feedwater control valves mitigato the consequences of postulated secondary system ruptures. Currently, only the h MS1Vs have expiteit operability, action and surveillance requirements in technical specifications, . Although response times are defined for main feedwater isolation by Technical Specification 3/4.3.2: Engineered Safety Features Actuation System, the Technical Specification 3/4.3.2 operability, action and' surveillance requirements only cover instrumentation. The proposed: change adds new technical specification requirements explicitly addressing operability, action and surveillance requirements.for main feedwater isolation valves, main feedvater control valves, and feedwater regulating bypass valves. .These requirements' constitute additional limitations or restrictions not presently included in technical specifications; therefore, the proposed change is similar to example (ii) of 48.FR 14870.
Safety and Significant Hazards Determination Based on the above discussion, the proposed change does not involve a significant hazards consideration in that it does not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3)' involve a significant reduction in margin of safety. In addition, it is considered that: (1) there is a reasonable assurance that the health and safety of the public will not be endangered by the proposed change; and (2) this action will not result in a condition which significantly alters the impact of the station on the environment as described in the NRC Final Environmental Statement.
4 f 1
. a m9xgg - 94ggr y y w -
~
q; . ~ytc~e^nrn ij
- e . 1
- 4:
- .g. .
t' t i
,j' ir ;
-s l
I t
t
[
t 4
1 I
1 l
i
},
ATTACHMENT A
{,
NPF-38-105 l r
5
'l, 1
1
.4 i
(4 I
c t
{!
i i
x 1
%resamsw x