f Nl 00T 2 6 1989 Docket'No. 50-302 License No. DPR-72 Florida Power Corporation Mr. W. S. Wilgus Vice President, Nuclear Operations ATTN: Manager. Nuclear Operations Licensing P. O. Box 219-NA-21.
Crystal River, FL 32629 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- CRYSTAL RIVER UNIT 3 This'1etter refers to the meeting which was held in our office at your request on September'14, 1989.
The purpose of this meeting was to discuss the licensee's plans to resolve electrical issues prior to unit restart.
It is our opinion that this meeting was beneficial and provided a better understanding of this issues.
In - accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, Original signed by Albert F. Gibson (for)
Stewart D. Ebneter Regional Administrator
Enclosures:
1.
List of Attendees 2.
Meeting Agenda 3.
Meeting Summary ec w/entis:
(See page 2) 8911070302 091026 ADDCK0500g2 gg PDR P
7
m l.c,.
4 t
Florida Power Corporation 2
OCT 2 01989 cc w/encis:
' Gary L. Boldt l.
H Vice President Nuclear Production Florida Power Corporation P. O. Box 219-SA-2C
/
Crystal River, FL 32629 5
P. ' F. McKee, Director Nuclear Plant Operations Florida Power Corporation P. O. Box 219-NA-2C Crystal River, FL 32629 R. C. Widell, Director Nuclear Site Support Florida Power Corporation P. 0. Box 219-NA-21 Crystal River, FL 32629
.A. H. Stephens General Counsel Florida Power Corporation MAC - A50 P. O. Box 1404?
I St. Petersburg, FL 33733 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Jacob' Daniel Nash Office of Radiation Control l
Department of. Health and Rehabilitative Services
?
1317 Winewood Boulevard Tallahassee, FL 32399-0700 Administrator Department of Environmental l
l Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 (cc w/encls - cont'd - see page 3) i
g 1
[-
L<
Florida Power Corporation 3
OCT 2 61989 (cc w/enci cont'd)
State Planning and. Development Clearinghouse Office of Planning and Budgeting Executive Office of the Governor The Capitol Building Tallahassee, FL 32301 Chairman
!~
Board of County Commissioners c
Citrus County 110 N. Apopka Avenue Iverness, FL 36250 Robert B. Borsum Babcock and Wilcox Company Nuclear Power Generation Division 1700'Rockville Pike, Suite 525 Rockville, MC 20852-1631
' State of Florida bec w/enciv:
Document Control Desk NRC Resident Inspector U.S. Nucle:ar Regulatory Commission 15760 W. Power Line Street Crystal River, FL 32629 i
'h ht,.-
h SVias:er C lenjak MSinkule LReyes 10/)/89 10/2J/89 10/ /89 10$3/89 3
RII:D RII:0RA
.TConi n AGibson
'10pf/89 10/$/89 f
f
/
n c
4 o
g,
'n.
l
'o
},,
1.
7 s
7 o
i F
ENCLOSURE 1 i
LIST OF ATTENDEES i
i NRC:
S. D. Ebneter, Regional Administrator B. Grimes, Acting Deputy Regional Administrator F
L. A. Reyes.. Director, Division of Reactor Projects (DRP)
[
M. V. Sinkule, Chief, Reactor Projects Branch 2, DAP i
S. J. Vias, Project Engineer, Reactor Projects Branch 2 DRP e
C. A. Julian, Chief,' Engineering Branch, Division of Reactor Safety (DRS)
T. E. Conlon, Chief, Plant Systems section DRS M. D. Hunt, Reactor Inspector, Plant Systems Section, DRS i
J. Tedrow, Resident Inspector, Crystal River (By Phone)
G..C. Lainas, Assistant Director for Region II Reactors, NRR H. Silver, Project Manager, NRR 6
FPC:
i
'W. S. Wilgus, Vice President, Nuclear Operations G. L. Boldt, Vice President, Nuclear Production E. C. Simpson, Director, Nuclear Operations, Engineering and Projects n
R. C. Widell, Director, Nuclear Operations, Site Support i.
l 0, o
l.
L; un i
1 l$'
-[
l 1
1 i
g f.4 fi).
'5 L k.
i eI, ENCLOSURE 2 i
MEETING AGENDA NRC/FPC ELECTRICAL ISSUES REGION II 0FFICES - ATLANTA GA
~
SEPTEMBER 14. 1989 1:00 P.M.
I. Introduction / Opening Remarks II. Review of Major Electrical Issues A.
Station Batteries B.
Second Level Undervoltage Relays (SLURS)
C.
Component DC Voltage Problems D.
Alternate Source of Transformer Feeder Breaker Replacement III. Other FPC Actions Regarding Electrical Issues A.
Startup Transformer B.
Emergency Diesel Generators C.
Configuration Management - Electrical Systems D.
Electrical Calculations IV. Management Summary 1
l l
l l
l l
l l
l l
l' L
I
-<<1
-g--------
y a,
F I
1
,.c J
L ENCLOSURE 3 METING
SUMMARY
j On September 14, 1989, a meeting was held between representatives of Florida Power Corporation and NRC management at the NRC Region 11 Office to discuss the licensee's plans to resolve various electrical issues prior to restart of the unit.
The licensee provided a general overview of the Crystal River Unit 3 electrical issues.
The licensee then presented a detailed discussion describing their p ogress toward resolving the issues.
The following topics were reviewed:
A station batteries, B)second level under voltage relays (SLURS),
C component DC voltage problems, and D) alternate source of transformer feeoer breaker replacement.
The licensee also presented an overview of the status and actions regarding other electrical issues which are ongoing.
These are included:
A)startup transformer, B) emergency diesel generators, C) configuration management for the electrical systems, and D) licensee's electrical calculations.
The licensee comitted to provide a letter to the Region within a week outlining their commitments in the various electrical areas and to provide an integrated schedule of planned electrical improvements.
The licensee, in a letter dated September 21, 1989, provided a detailed schedule of items to be completed prior to restart from the current outage and other milestones pertaining to the electrical issues at Crystal River Unit 3.