Interim Part 21 Rept Re Operation of Centrifugal Charging Pumps at Min Flow Rate When RCS Reaches Pressurizer Safety Valve Setpoint Pressure During Secondary Sys High Energy Line Rupture.Westinghouse Will Analyze Problem
ML19323J371
Person / Time
Site: Marble Hill
Issue date: 06/02/1980
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To:
References
REF-PT21-80-219-001 NUDOCS 8006200069
Download: ML19323J371 (3)


Text

_

9 ATTACHED IS A PART 21 REPORT FROM IE fMIL UNIT - ROOM 359Ehl PAL M PART 21 IDENTIFICATION No. So - a 19 -oo i COMPANY tWE Ah~ e 0

DATEOFLETTER  %/#6 DOCET NO. ro -34(o , ro64/ 7

-DATEDISTRIBlJIED 6//(/fo ORIGINAL REPORTSUPPLBENTARY Z @

DISTRIBlITION:

~

REACT 0P(8)[ FUEL CYCLE & _ SAFEGUARDS (S)U f%TERIALSfi)_

t NRR/ DOR, DIRECTOR (2) AD/FFMSI - AD/SG-IE NRR/DPM DIECTOR (2) INSS/FCMS AD/RDI AD/RDI(2) EGIONS EGIONS AD/RCI IEFILES NRR/DDR,DIECTO'R REGIONS PDR NMSS/SG SS-881 IEFILES LPDR PDR CENTRAL FILES CENTRALFILES-SS-396 LPDR CENTRAL F'ILES (CHRON) TERA gLFILES(CHRON)

PDR IEFILES(2)

LPDR CENTRAL FILES 016

[ LOEBhPA FIB 5715 AE0D - MGB-7602 CENTPAL FILES (CHRON)

CENTRAL FILES - SS-396 MAPA- M B 5715 AE0D tiiBB-7602 L0EBhPA MiB 5715 i

. . AE0D IID3-76C2 ACTION:

PRELIMINARY EVUALATION OF THE ATTACHED REPORT INDICATES LEAD RESPONSIBILIT( FOR FOLLOW-UP AS SH0hN BELOW: )

E.k E __ Eb E-A5b SG FFMSI P&,

80062 00M

06068040uh

', T!

3/ pq Qgy c.a

v 5 i9

~

PUBLIC l-

' SERVICE lNDIANA S. W. Shields Senior Vice President -

Nuclear Division June 2, 1980 Mr. James C. Keppler, Director Docket Nos.: STN 50-546 U. S. Nuclear Regulatory Commission STN 50-547 Region III Construction Permit Nos.:

799 Roosevelt Road CPPR - 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station Units 1 and 2

Dear Mr. Keppler:

On May 9, 1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc. (PSI) notified your office of a potentially reportable item as required 'by 10CFR 50.55(e). The same item has also.been reported by Westinghouse (letter to Mr. V. Stello of NRC, dated May 8, 1980, ref. no. NS-TMA-2245) under 10CFR 21. Westinghouse has identified a potential problem in the operation of centrifugal charging pumps (CCPS) at their minimum allowable flow rate when the reactor coolant system reaches the pressurizer safety valve setpoint pressure during a secondary system high energy line rupture. This situation could lead to the failure of the CCPS.

PSI has requested Westinghouse to analyze this problem. Westinghouse has initiated efforts to do plant specific analysis for the Marble Hill plant., At this time PSI has not determined the impact of this it m on the safety of the nuclear power plant operation. However, the NRC will be informed, as required under 10CFR 50.55(e), of the outcome of the Westinghouse analysis by September 1, 1980. This letter is intended to fulfill the requirer.cnts of an interim report as defined in 10CFR 50.55(e). If you.have any questions regarding this letter, please feel free to contact me.

Sincerely,

'$. W. Ghields RAB/cg P.O. Box 1.90, Ncw Washington, Indiana 47162 812. 293.4441

. e.

  • ;4Y5~I .

c ;)u~ . /

PUSUC SERVICE INDIANA Letter: Mr. Keppler' June 2, 1980 cc: . Director of Inspection and Enforcement

.U. S. Nuclear Regulatory Con: mission Washington, D. C. 20555 E. R. Schweibinz, P. E.

J. J. Harrison 1

\