ML19323J318
| ML19323J318 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 04/21/1980 |
| From: | Kenna W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Damore M WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| Shared Package | |
| ML19323J313 | List: |
| References | |
| NUDOCS 8006200010 | |
| Download: ML19323J318 (2) | |
Text
._
---__.--m a1.-
L.. e,....t _,........,..-"M o
g
.a--*
o UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
a REGION 11 o
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA. GEORGIA 30303 APR 211980 In Reply Refer To:
RII:JWB 70-1151/80-10 Westinghouse Electric Corporation ATTN:
M. D' Amore, ifanager Columbia Plant Nuclear Fuel Division i
Drawer R Columbia, SC 29205 Gentlem'en:
This refers to the inspection conducted by J. W. Bates of this office on March 25-28, 1980, of activities authorized by NRC License No. SNM-1107 at Westinghouse Nuclear Fuels Division, Columbia Plant, and to the discussions of our findings held with Mr. M. D' Amore at the conclusion of the inspection.
Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, Code of Federal Regulations, Part 70, "Special Nuclear Material", and specific license conditions. Within these areas, the inspection consisted of selective examina-tions of procedures and representative records, interviews with personnel, performance tests, and observations by the inspector.
We have examined actions you have taken with regard to previously identified enforcement matters and unresol";d items. The status of these items is dis-cussed in the enclosed repor.c.
During the-inspection, it was found that certain activities under your license appear to be in noncompliance with NRC requirements.
These items and references to pertinent requirements are listed in the Notice of Violation enclosed here-with as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 t
days of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results S
achieved; (2) corrective steps which will be taken to avoid further noncompli-
}
ance; and (3) the date when full compliance will be achieved. Details of activities involving safeguards and security measures are exempt from disclosure in accordance with 10 CFR 2.790(d). Therefore, your response should be incor-porated in a separate paper and referenced in your reply.
t In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and
}
security measures are exempt from public disclosure; therefore, the enclosures-j to this letter with the exception of the report cover page, which is an inspec-tion summary, will not be placed in the Public Document Room.
1
.I
!.nnr.t Trccr: iia!!r.mH
!80061000/O m 2. m.r q
s
!.w!"n m'!:"mr3 ner.=.mH cc."m-... e..I........ a r,a,-
APR 311880 Westinghouse Electric Corporation,
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Since ely, B.Ne a, Chief Safeguar s Branch
Enclosures:
1.
Appendix A, Notice of Violation (Exempt from Disclosure) 2.
Inspection Report No. 70-1151/80-10 (Exempt from Disclosure) 3.
Inspection Summary (Not Exempt) d ad t
CS.ii!.E3 2.70 E;f;?.7.;,T!S:t
- -- -