Forwards IE Insp Repts 50-295/80-03 & 50-304/80-02 on 800207-0328 & Notice of Violation
ML19323J060
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/26/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19323J061 List:
References
NUDOCS 8006170727
Download: ML19323J060 (2)


See also: IR 05000295/1980003

Text

- - - -

-

/#

'

,..c y

Tic

'

g/

,o,,

UNITED STATES

,

g

NUCLEAR REGULATORY COMMISSION

,

a

REGION iil

D

%

'[

799 ROOSEVELT ROAD

\\

,o

GLEN ELLYN, ILLINOIS 60137

D

APR 2 61980

Docket No.

50-295

Docket No.

50-304

Commonwealth Edison Company

ATTN.

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL

60690

Gentlemen:

This refers to the inspection conducted by Mr. J. E. Kohler of this

office on February 7 - March 28, 1980, of activities at the Zion Nuclear

Power Station authorized by NRC Operating License No. DPR-39, DPR-48 and

to the discussion of our findings with Mr. Wandke at the conclusion of

the inspection.

'

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

The inspection showed that action had been taken to correct

the identified noncompliance and to prevent recurrence.

Consequently, no

reply to this noncompliance is required and we have no further questions

regarding this matter at this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

800 617 0 }Tj? '/F

.

.

Commonwealth Edison Company

-2-

APR 2 61990

th will gladly discuss any questions you have concerning this

inspection.

Sincerely,

o

O

C /'

j

. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-295/80-03,

No. 50-304/80-02

cc w/encls:

Mr. D. L. Peoples, Director

of Nuclear Licensing

Mr. N. Wandke, Plant

,

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

.

%

__ _