UNITED STATES
NUCLEAR REGULATORY COMMISSION
y
,
g
"
3/
r
REGION 111
o,,
,f
799 ROOSEVELT ROAD
%,
,o*
GLEN ELLYN, ILLINolS 6o137
IJUN
5 G80
.
.
Docket No. 50-409
Dairyland Power Cooperative
ATTN:
Mr. F. W. Linder
General Manager
j
2615 East Avenue - South
I
La Crosse, WI 54601
Gentlemen:
This refers to the inspection conducted by Messrs. K. R. Ridgway, W. L. Forney
and M. W. Branch of this office on May 5-9, 1980, of activities at La Cro se
Boiling Water Reactor authorized by NRC Operating License No. DPR-45 and to
4
the discussion of our findings with Mr. Shimshak and members of the staff at
the conclusion of the inspection.
The enclosed copy of our inspection rcport identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
The inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence. Consequently, no reply to this
noncompliance is required and we have no further questions regarding this
matter at this time.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal P.egulations, a copy of this letter, the enclo-
sures, and your response to this letter will be placed in the NRC's Public
Document Room, except as follows.
If the enclosures contain information
that you or your contractors believe to be proprietary, you must appl / in
writing to this office, within twenty days of your receipt of this letter,
to withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the application.
l
l
t
l
l
i
800 617 0 Crj3
-
,
..
Dairyland Power Cooperative
-2-
UUN
5 G80
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
0
-
,
s
R. F. Heishman, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice of
Violation
2.
IE Inspection Report
No. 50-409/80-01
cc w/encls:
Mr. R. E. Shimshak, Plant
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. John J. Duffy, Chief
Boiler Inspector, Department
of Industry, Labor and Human
Relations
D. Eisenhut, DOL-NRR
C. Long, DOL-NRR
.
.
..
--
. - -
w
-, =