ML19323H593

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/80-12 & 50-374/80-08 on 800312-14 & 18-19 & Notice of Violation
ML19323H593
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 04/26/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19323H594 List:
References
NUDOCS 8006130255
Download: ML19323H593 (2)


See also: IR 05000373/1980012

Text

m

,

/ a aug'o

Q

f

n

UNITED STATES

8

,'n

NUCLEAR REGULATORY COMMISSION

,

8

L

REGION lli

a

-

D[

74

790 ROOSEVELT ROAD

%

GLEN ELLYN,ILLINolS 60137

    • ,.*,o

APR 2 61980

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspections conducted by Mr. I. T. Yin of this office

on March 12-14, 1980 at the site, on March 18-19, 1980 at the corporate

office of Sargent and Lundy Engineers, and on March 19, 1980 at Common-

wealth Edison Company, of activities at the La Salle County Station,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-99 and

No. CPPR-100 and to the discussion of our findirgs with Mr. B. J. McAndrew,

Mr. G. F. Marcus, and others of your staff at tLe conclusion of each

intpection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance: (1) corrective action

taken and the results achieved; (2) corrective action to be taken to avoid

further noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

Public Document Room, except as follows.

If the enclosures contain

I

l

8006180256 g

L_

.

Commonwealth Edison Company

-2-

APR 2 61980

information that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The application must include a full statement of the reasons for which

the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is contained

in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspectior.

Sincerely,

I

edidh

G. Fiorelli, Chief

Reactor Construction and

Engineering Suppart Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-373/80-12 and

No. 50-374/80-08

cc w/ encl:

Mr. D. L. Peoples, Director

of Nuclear Licensing

Mr. L. J. Burke, Site

Project Superintendent

Mr. T. E. Quaka, Quality

Assurance Supervisor

Mr. R. H. Holyoak, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General