Third Stipulation Re Certain Suffolk County Contentions. Specifies Contentions That Have Been Resolved,Contentions That Have Been Merged & Contentions That Are Retained, Pending NRC Action
ML19323H552
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 06/10/1980
From: Bordenick B, Dempsey P, Reveley W
LONG ISLAND LIGHTING CO., NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD), SUFFOLK COUNTY, NY
To:
Shared Package
ML19323H551 List:
References
NUDOCS 8006130162
Download: ML19323H552 (3)


Text

.

g..

"M. D C)

Mu F

,u 53 'M '80 UNITED STATES OF AMERI,CA -

,,ag NUCLEARREGULATORYCOMMISSION7))qqgy 2 '.' i

  • 000NTY Before the Atomic Safety and Licensing Board In the Matter of LONG ISLAND LIGHTING COMPANY Docket #50-322 (Shoreham Nuclear Power Station Unit 1)

_________________i THIRD STIPULATION REGARDING CERTAIN SUFFOLK COUNTY CONTENTIONS I.

Technical and 1,egal representatives of the Applicant, the NRC Staff and Suffolk County '(SC or County) have continued their efforts to facilitate informal discovery by SC, as well as to resolve and/or particularize certain SC contentions.

As a result of these meetings, the Applicant, Staff and County stipulate that:

A.

The following SC contentions will be pursued no s

further in this proceeding because the pertinent County concerns

-1/ and 12a (iii).

have been resolved:

4a (ix) 1/

Nothing herein contained shall be deemed to waive SC's right to review *and evaluate completion of technical specifications as they specifically apply _to Shoreham operations.

SC reserves the l

right to reparticularize under Contention 8(a).

8006130 /d 2

B.

The following SC contentions will be pursued no further in this proceeding because they have been merged with other contentions:

l.

Contention 4a(v)is merged into contention 7a (iv).

2.

Contention 4a (xiii) is merged into contention 3a(i).

3.

Contention 6a (iv) is merged into contention 18a (ii).

4.

Contentions 6b and 16a are merged into contention 15a. 2/

5.

Contention 7a (v) is merged into contention 4a (iv).

6.

Con'tention 12a (v) is merged into contention 4a (xii).

7.

Contention 1,3c is merged into contentions 13a (ii)

(iii), (v) - (vi).

C.

SC is currently satisfied with the resolution of the following contentions, but each contention will be retained until the indicated NRC Staff action is taken and reviewed by 3/

the County:

1.

SC intends to drop contention 4a (iv) upon NRC Staff review and approval of the Shoreham Rod Block Monitor l

System, Reacto-M3nual Control System and the Rod Sequence Control System.

2/

SC reserves the right either to reparticularize under contention 15a a contention concerning Class 9 accidents and their consequences, or to posit a new contention on that issue.

3/ 'SC reserves the right to reparticularize any of the contentions included in Part C of this stipulation should SC conclude that the NRC Staff resolution of the contentions is technically deficient.

2.

SC intends to drop contention 4a(xii) upon NRC Staff review and approval ~of the Applicant's response to NRC Staff concerns relative to electrical pene-tration protection (Shoreham Confirmatory Issue No. 17) presented in Applicant's letter of March 13, 1979 (SNRC-365).

3.

SC will consider dropping contention lla(ii)upon confirmation by the NRC Staff of the acceptability of the Shoreham Core Spray System.

II.

The parties to this stipulation request that the Board accept the agreements set out in Part I above.

III.

There will be continuing efforts by the Applicant, Staff and County to resolve and/or adequately particularize the remaining SC contentions.

The Board will be kept informed of these efforts.

Respectfully submitted, LONG ISLAND LIGHTIN COMPANY

//$uN W.

Taylof ReVeley, III Anthony V. Earley, Jr.

SUFFOLK COUNTY NRC STAFF fW W

Patricia Dempsey

()

Irving Like ti;hard n. ";; fling Bernard M.

Bordenick Dated: June 10,1980 n