ML19323H337

From kanterella
Jump to navigation Jump to search
Forwards Addl Info Re NUREG-0578,Item 2.1.6.a,Integrity Sys Outside Containment Likely to Contain Radioactive Matls. Leakage Test Results Indicate Elimination of Leakage After Maint & Completes Leakage Evaluation for NUREG-0660
ML19323H337
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/09/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0578, RTR-NUREG-578 490, NUDOCS 8006120395
Download: ML19323H337 (2)


Text

- _ _ _ _ -.

VznorxrA ELECTRIC AND POWE R C OM ENY H rcuxoxn,VImorNIA n3261 June 9, 1980 Mr. Harold R. Denton, Director Serial No.

49 0 Office of Nuclear Reactor Regulation N0/FET:baw Attn:

Mr. B. Joe Youngblood, Chief Docket No.

50-339 Licensing Branch No. 1 License No.

NPF-7 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Lessons Learned Short Term Requirement 2.1.6.a North Anna Power Station Unit No. 2

Dear Mr. Denton:

This letter is intended to provide additional information concerning NUREG 0578 item 2.1.6.a, Integrity of Systems outside Containment Likely to Contain Radioactive Materials for North Anna Unit 2.

The attachment contains the results of leakage tests performed recently for Recirculation Spray, Safety Injection, the Boron Injection Tank and Boron Recovery "B" Cas Stripper.

Note that in the cases of a report of leakage from any of these systems, a maintenance order was issued and the leakage has been eliminated.

This completes the leakage evaluation effort required by NUREC-0660 item III.D. l.1 and satisfies this requirement for issuance of a Full Power Safety Evaluation Report for North Anna Unit 2.

We will continue to monitor leakage from these systems through our Leak Reduction Program described in our letter Serial No. 015, dated January 10, 1980, entitled Lessons Iaarned Short Term Requirements.

If you have any questions or require additional information, please contact this office.

Very truly yours,

/:

fb, JrOh R[ Sylvia B.

Manager-Nuclear Operations and Maintenance cc: Mr. James P. O'Reilly

' 8006120 3f1$

~

Attachment North Anna Power Station Unit 2 Lessons Learned Short Term Requirement 2.1.6.a Report of Integrity of Systems Outside Containment Likely to Contain Radio-3 active Materials.

System / Component Test Date Test Leakage Leakage after Maintenance Recirculation Spray Pump A 3/5/80

~.25 GPM None Recirculation.

Spray Pump B 3/6/80 None Safety Injection Pump 1A 3/27/80

~ 10 drops / minute None Safety Injection Pump 1B 3/28/80 Valve Leak 56 drops /

None 1

minute Boron Injection Tank 3/28/80 None "B" Gas Stripper 4/4/80 None 4