Confirms Compliance w/TMI-2 Bulletins & Orders Task Force Final Recommendations (Items C.3.9 Through C.3.12). Proportional Integral Differential Controller on Pressurizer Power Operated Relief Valve Modified
ML19323H328
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/09/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0660, RTR-NUREG-660 479, NUDOCS 8006120388
Download: ML19323H328 (2)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

VinoisrA Etscruic Axn Powr!:a CoxrAxy Rremonoxo,Vrwora rA 2a.a61 June 9, 1980 Mr. Harold R. Denton, Director Serial No.

479 Office of Nuclear Reactor Regulation N0/FHT:baw Attn:

Mr. B. Joe Youngblood, Chief Docket No.

50-339 Licensing Branch No. 1 License No.

NPF-7 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Bulletin and Orders Task Force Final Recommendations North Anna Power Station Unit 2

Dear Mr. Denton:

We have reviewed the NRC Memorandum SECY-80-230, dated May 2,1980, and presented to the Commissioners in a meeting on May 8,1980.

This memo-randum was intended to describe Commission actions required in connection with NUREG-0660, the TMI Action Plan.

, to this memorandum provided the specific 1MI-related require-I ments and actions for new operating licenses as contained in the Action Plan.

The first group of requirements, those for fuel loading and low power testing, included four final recommendations of the Bulletin and Orders (B&O) Task Force listed in Table C.3 of Volume i of the Action Plan:

C. 3.9, C. 3.10, C. 3.11 and C. 3.12.

It was noted that these B&O recommendations were not specifically delineated as fuel loading require-ments prior to the review of North Anna Unit 2.

j This letter is intended to confirm North Anna Unit 2 compliance with these four B&O Task Force final recommendations (Items C.3.9, C.3.10, C.3.11 and C.3.12).

Item C.3.9 I

B&O Recommendation:

For Wstinghoitse-designed reactors, modify the pressure (sic) integral derivative controller, if installed on the PORV, to eliminate spurious openings of the PORV.

Response: North Anna Unit 2 is in compliance with this item.

The pro-portional integral differential (PID) controller on the pressurizer P0RV has been modified as recommended' by Westinghouse.

The rate time constant has been set equal to zero, eliminating spurious openings of the PORV.

8 0 0 612 0 3f$r j

VenoixtA ELECTRIC AND Powra CourAxv To Mr. Harold R. Denton 2

Item C.3.10 B&O Recommendation:

For Wsstinghouse-designed reactors, if the anticipatory reactor trip upon turbine trip is to be modified to be bypassed at power levels less than 50 percent, rather than below 10 percent as in current designs, de-monstrate that the probability of a small-break LOCA resulting from a stuck-open PORV is not significantly changed by this modification.

Response

North Anna Unit 2 is in compliance with this item.

The antici-pating reactor trip upon turbine trip currently can only be bypassed at i

power levels below 10 percent.

Item C.3.11 B&O Recommendation: Demonstrate that the PORV installed in the plant has a failure rate that is not significantly less (sic) than the valves for which there is an operating history.

Response

N rth Anna Unit 2 is in compliance with this item.

The installed o

PORV manufactured by Masonellan (model no. 3" IA38RGP) is similar in design to the Copes-Vulcan valves used in most Westinghouse-designed plants.

Both valves were purchased to a Westinghouse design specification and, based on a review by Westinghouse, would be subject to similar failure mechanisms and rates.

In addition, two Masoneilan valves have operated satisfactorily for over two years at North Anna Unit 1.

No modification of these valves is required.

Item C.3.12 B&O Recommendation: For Westinghouse-designed reactors, confirm that there is at. anticipatory reactor trip on turbine trip.

O Response: North Anna Unit 2 is in compliance with this item.

There is currently an anticipatory reactor trip upon turbine trip.

If you have any questions or require additional information, please contact l

this office.

t Very truly yours,

)

n,

$Q B. R.' Sylvia Manager-N' clear Operations i

u and Maintenance-

~

!