Forwards IE Insp Rept 50-286/79-23 on 790930-1027 & Notices of Violation
ML19323H142
Person / Time
Site: Indian Point 
Issue date: 03/14/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML19064A091 List:
References
NUDOCS 8006120132
Download: ML19323H142 (2)


See also: IR 05000286/1979023

Text

'

O.

^

.

.

.a Eg

UNITED STATES

o

NUCLEAR REGULATORY Commission

{

3

o

R EGION I

$

g

$31 PARK AVENUE

f

KING OF PRUSSIA. PENNSYt.VANIA 19406

%'* . . . . . ,/

MAR 1 4 1980

Docket No. 50-286

Power Authority of the State of New York

Indian Point 3 Nuclear Power Plant

ATTN: Mr. J. P. Bayne

Resident Manager

P. O. Box 215

Buchanan, New York 10511

Gentlemen:

.

Subject:

Inspection 50-286/79-23

This iefers to the inspection conducted by Mr. T. Rebelowski of this office on

September 30 - October 27, 1979 of activities authorized by NRC License No. DPR-

64 and to the discussions of our findings held by Mr. Rebelowski with yourself

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix B.

These items of

noncompliance have been categorized into the levels as described in our corres-

pondence to you dated December 31, 1974.

This notice is sent to you pursuant to

the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within twenty (20) days of your receipt of this notice, a written state-

(1) corrective steps which have been

ment or explanation in reply including:(2) corrective steps which will be taken

taken by you and the results achieved;

to avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

,

that you make a written application within 20 days to this office to withhold

j

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

docunent or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by the

Commission as listed in subparagraph (b) (4) of Section 2.790.

The information

8006120) R

,

_.

,

.

.

Power Authority of the State of

2

MAR 14 1990

,

New York

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Dc::ument Room.

Additionally, and in accordance with Section 2.790(d) of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, documentation of

findings of your control and accounting procedures for safeguarding special

nuclear materials and your facility security procedures are exempt from disclosure;

therefore, the pertinent section of the inspection report and Appendix A, will

not be placed in the Public Document Room and will receive limited distribution.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

. Brunner, Chief

Reg tor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation (Contains 2.790(d) Information)

2.

Appendix B, Notice of Violation

3.

Office of Inspection and Enforcement Inspection

Report Number 50-286/79-23 (Contains 2.790(d) Infomation)

cc:

George T. Berry, Executive Director (w/o Appendix A and Pages 12 and 13 of

report)*

A. M. Pratt, Assistant General Counsel (w/o Appendix A and Pages 12 and 13

of report)*

G. M. Wilverding, Licensing Supervisor (w/o Appendix A and Pages 12 and 13

of report)*

_

P. W. Lyon, Manager - Nuclear Operations (w/o Appendix A and Pages 12 and

13 of report)*

A. Klausmann, Director, Quality Assurance (w/o Appendix A and Pages 12 and

13 of report)*

D. Halama, Site Quality Assurance Engineer (w/o Appendix A and Pages 12 and

13 of report)*

J. F. Davis, Chairman, Safety Review Committee (w/o Appendix A and Pages

12 'and 13 of report)*

J. M. Makepeace, Director, Technical Engineering (Con Ed) (w/o Appendix A

and Pages 12 and 13 of report)*

W. D. Hamlin, Assistant to Resident Manager (PASNY) (w/o Appendix A and Pages

12 and 13 of report)*

  • Contains 2.790 Information

_

.

.

.

~