ML19323H142
| ML19323H142 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/14/1980 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Bayne J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| Shared Package | |
| ML19064A091 | List: |
| References | |
| NUDOCS 8006120132 | |
| Download: ML19323H142 (2) | |
See also: IR 05000286/1979023
Text
'
O.
^
.
.
.a Eg
UNITED STATES
o
NUCLEAR REGULATORY Commission
{
3
o
R EGION I
$
g
$31 PARK AVENUE
f
KING OF PRUSSIA. PENNSYt.VANIA 19406
%'* . . . . . ,/
MAR 1 4 1980
Docket No. 50-286
Power Authority of the State of New York
Indian Point 3 Nuclear Power Plant
ATTN: Mr. J. P. Bayne
Resident Manager
P. O. Box 215
Buchanan, New York 10511
Gentlemen:
.
Subject:
Inspection 50-286/79-23
This iefers to the inspection conducted by Mr. T. Rebelowski of this office on
September 30 - October 27, 1979 of activities authorized by NRC License No. DPR-
64 and to the discussions of our findings held by Mr. Rebelowski with yourself
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that certain of your activi-
ties were not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as Appendix B.
These items of
noncompliance have been categorized into the levels as described in our corres-
pondence to you dated December 31, 1974.
This notice is sent to you pursuant to
the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations.
Section 2.201 requires you to submit to this
office, within twenty (20) days of your receipt of this notice, a written state-
(1) corrective steps which have been
ment or explanation in reply including:(2) corrective steps which will be taken
taken by you and the results achieved;
to avoid further items of noncompliance; and (3) the date when full compliance
will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any infor-
mation that you (or your contractor) believe to be proprietary, it is necessary
,
that you make a written application within 20 days to this office to withhold
j
such information from public disclosure. Any such application must be accompanied
by an affidavit executed by the owner of the information, which identifies the
docunent or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790.
The information
8006120) R
,
_.
,
.
.
Power Authority of the State of
2
MAR 14 1990
,
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Dc::ument Room.
Additionally, and in accordance with Section 2.790(d) of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations, documentation of
findings of your control and accounting procedures for safeguarding special
nuclear materials and your facility security procedures are exempt from disclosure;
therefore, the pertinent section of the inspection report and Appendix A, will
not be placed in the Public Document Room and will receive limited distribution.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
. Brunner, Chief
Reg tor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation (Contains 2.790(d) Information)
2.
Appendix B, Notice of Violation
3.
Office of Inspection and Enforcement Inspection
Report Number 50-286/79-23 (Contains 2.790(d) Infomation)
cc:
George T. Berry, Executive Director (w/o Appendix A and Pages 12 and 13 of
report)*
A. M. Pratt, Assistant General Counsel (w/o Appendix A and Pages 12 and 13
of report)*
G. M. Wilverding, Licensing Supervisor (w/o Appendix A and Pages 12 and 13
of report)*
_
P. W. Lyon, Manager - Nuclear Operations (w/o Appendix A and Pages 12 and
13 of report)*
A. Klausmann, Director, Quality Assurance (w/o Appendix A and Pages 12 and
13 of report)*
D. Halama, Site Quality Assurance Engineer (w/o Appendix A and Pages 12 and
13 of report)*
J. F. Davis, Chairman, Safety Review Committee (w/o Appendix A and Pages
12 'and 13 of report)*
J. M. Makepeace, Director, Technical Engineering (Con Ed) (w/o Appendix A
and Pages 12 and 13 of report)*
W. D. Hamlin, Assistant to Resident Manager (PASNY) (w/o Appendix A and Pages
12 and 13 of report)*
- Contains 2.790 Information