Text
7/G
,
cID %,
UNITED STATES
o
NUCLEAR REGULATORY COMMISSION
J%
~ ' , '
REGloN IV
I I
I
611 RYAN PLAZA DRIVE, SUITE 1000
1
o
- *[? ' .' } o
{r
aj
ARLINGTON, TEXAS 76012
".
_
p
,g'u
,
April 30, 1980
j
In Reply Refer To:
RIV
i
Docket No. 50-498/Rpt. 80-07
50-499/Rpt. 80-07
i
Houston Lighting and Power Company
ATTN:
Mr. E. A. Turner, Vice President
Power Plant Construction and
Technical Services
Post Office Box 1700
Houston, Texas
77001
Gentlemen:
This refers to the inspection conducted by Mr. W. G. Hubacek of our staff
during the period April 8-11, 1980, of activities authorized by NRC Construc-
tion Permits No. CPPR-128 and 129 for South Texas Project, Units No. I and 2,
and to the discussion of our findings with L. D. Wilson and other member of
your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are disscussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with Appendix B tr> 10 C7R 50 of the NRC Regulations,
" Quality Assurance Criteria for Nuclear Power Plants." The item of noncompliance
and references to the pertinent requirements are identified in the enclosed
We have also eynmined actions you have taken with regard to previously identified
inspection findings. The status of these items is identified in paragraph 2 of
the enclosed report.
This notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Patt 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within 30 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance; and
i
'
(3) the date when full compliance will be achieved.
l
1
i
8006090
226
._
.
_ ___ __ _ _
_
_____
,
Houston Lighting and Power Company
-2-
April 30, 1980
l
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the reasons
,
why it is claimed that the information is proprietary. The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
t'
'
Sincerely,
.4
l
h..
,
W. C. Seidl
Chief
d
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
IE Inspection. Report No. 50-498/80-07
50-499/80-07
.