Forwards IE Insp Repts 50-321/80-09 & 50-366/80-09 on 800324-26.No Noncompliance Noted
ML19323F419
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/18/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19323F420 List:
References
NUDOCS 8005290008
Download: ML19323F419 (2)


See also: IR 05000321/1980009

Text

"'4

d

.

UNITED STATES

8

h

NUCLEAR REGULATORY COMMISSION

j'.W

g

a

REGION 11

Md

b[

0,,

101 MARIETTA ET N.W SUITE 3100

%****+a

ATLANTA.GEORgbA 30303

APR 18 &

In Reply Refer To:

RII:RMC

50-321/80-09

50-366/80-09

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by R. M. Compton of this office on

March 24-26, 1980 of activities authorized by NRC License No. DPR-57 and NPF-5

for the Hatch facility, and to the discussion of our findings held with M. Manry

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope or this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

C. E. Murph , C

Reactor Construction and

Enclosures:

(See Page 2)

Engneering Support Branch

i

1

60052900o9

i .

...

Georgia Power company

-2-

JW'R 181980

.

Enclosures:

Inspection Report Nos. 50-321/80-09 and

50-366/80-09

cc w/ enc 1:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

W. A. Widner

Vice President and General Manager

Nuclear Generation

Georgia Power Company

Post Office Box 4545

Atlanta, GA 30303

,

- - . - - _ . -

'w...e.t.

-

,-.,.m.,.m=,.,

+,c-

.