ML19323E847
| ML19323E847 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/15/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19323E848 | List: |
| References | |
| NUDOCS 8005270319 | |
| Download: ML19323E847 (2) | |
See also: IR 05000259/1980015
Text
.1
. . . . . . .
. u .1_
- _ . _ ... _ .
1.
_____ _
. - . -
.
--
a
'o
UNITED STATES
$ -Jl2;fy/
- .
[
g
NUCLIAR REGULATORY COMMISSION
g,o
g
a
REGION 11
a
101 MARIETTA ST., N.W., SUITE 3100
gf
8
l
ATLANTA, GEORGIA 30303
APR 151980
.
In Reply Refer To:
RII:LM
50-259/80-15
50-260/80-12
'
ll
50-296/80-13
,1
Tennessee Valley Authority
.
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
,
Gentlemen:
This refers to the inspection conducted by L. Modenos of this office on March 19-20,
1980 of activities authorized by NRC License Nos. DPR-33, DPR-52 and DPR-68 fer
,
the Browns Ferry Nuclear Plant facility, and to the discussion of our findings
,,
held with R. Guthrie at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
,
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
"
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
.,
'1
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
-
proprietary, it is necessary that you make a written application within 20 days
3
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
,
that proprietary information identified in the application is contained in a
,t
separate part of the document.
If we do not hear from you in this regard within
', i
the specified period, the report will be placed in the Public Document Room.
'
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
C. E. Murp y,
hie
Reactor Constru ton and
j
Engineering Support Branch
Enclosures:
(See Page 2)
l
l:
1
80052 7ON
.
- .
.
-
-
..
-
-
-.
. .
.
. .
.
.
.--
__.
._-.~u.--....-.-:-.-.------------
- -
- - -
- -
- - - - - -
- - - - - - - ~
.
.
g
Tennecsee Valley Authority
-2-
Jy>R 151980
.
Enclosures:
Inspection Report Nos. 50-259/80-15,
50-260/80-12 and 50-296/80-13
cc w/ enc 1:
H. L. Abercrombie
Plant Superintendent
,
!
P. O. Box 2000
"
Decatur, AL 35602
R. E. Rogers, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
.
H. N. Culver
249-A HBB
400 Commerce Avenue
Knoxville, TN 37902
i
.
.
,
,
_ . ,
, - - - - - -
-