ML19323E822
| ML19323E822 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/15/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19323E823 | List: |
| References | |
| NUDOCS 8005270278 | |
| Download: ML19323E822 (2) | |
See also: IR 05000348/1980004
Text
1
\\
l$
- pam'o
UNITED STATES
!
g
go
eg
NUCLEAR REGULATORY COMMISSION
o
$
I
REGION 11
o
101 MARIETTA ST
N.W., SUITE 3100
ATLANTA, GEORGIA 20303
g ,5 g
In Reply Refer To:
RII:WPA
50-348/80-4
l
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by W. P. Ang of this office on March 25-26,
1980 of activities authorized by NRC License No. NPF-2 for the Farley Nuclear
Plant facility, and to the discussion of our findings held with R. George at the
conclusion of the inspection.
[,
Areas examined during the inspection and our findings are discussed in the
'
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
'
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
,
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
i
it is claimed that the information is proprietary, and should be prepared so
,
that proprietary information identified in the application is contained in a
!
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
,
.?
i
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
ij
Sincerely,
-
A
C. E. Mu hy,
hief
'
Reactor Construction and
j
Engineering Support Branch
Enclosure:
(See Page 2)
.
.
t
.
$
4
t
8 0 0 5 27 0My
1
-
.-
__
.
.. ..
APR 151980
Alabama Power Company
-2-
,
Enclosure:
Inspection Report No. 50-348/80-4
cc w/ encl:
,
A. R. Barton
Executive Vice President
P. O. Box 2641
Birmingham, AL 35291
F. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
_
Birmingham, AL 35291
H. O. Thrash
Manager-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
0. D. Kingsley, Jr.
Manager, Nuclear Engineering and
Technical Services
P. O. Box 2641
Birmingham, AL 35291
1
J. W. McGowan
Manager-Operations Quality Assurance
P. O. Box 2641
Birmingham, AL 35291
W. G. Hairston, III
)
Plant Manager
Drawer 470
Ashford, AL 36312
i
l
l
,
t