Forwards IE Insp Rept 50-348/80-04 on 800325 & 26.No Noncompliance Noted
ML19323E822
Person / Time
Site: Farley 
Issue date: 04/15/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19323E823 List:
References
NUDOCS 8005270278
Download: ML19323E822 (2)


See also: IR 05000348/1980004

Text

1

\\

l$

  1. pam'o

UNITED STATES

!

g

go

eg

NUCLEAR REGULATORY COMMISSION

o

$

I

REGION 11

o

101 MARIETTA ST

N.W., SUITE 3100

ATLANTA, GEORGIA 20303

g ,5 g

In Reply Refer To:

RII:WPA

50-348/80-4

l

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. P. Ang of this office on March 25-26,

1980 of activities authorized by NRC License No. NPF-2 for the Farley Nuclear

Plant facility, and to the discussion of our findings held with R. George at the

conclusion of the inspection.

[,

Areas examined during the inspection and our findings are discussed in the

'

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

'

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

,

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

i

it is claimed that the information is proprietary, and should be prepared so

,

that proprietary information identified in the application is contained in a

!

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

,

.?

i

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

ij

Sincerely,

-

A

C. E. Mu hy,

hief

'

Reactor Construction and

j

Engineering Support Branch

Enclosure:

(See Page 2)

.

.

t

.

$

4

t

8 0 0 5 27 0My

1

-

.-

__

.

.. ..

APR 151980

Alabama Power Company

-2-

,

Enclosure:

Inspection Report No. 50-348/80-4

cc w/ encl:

,

A. R. Barton

Executive Vice President

P. O. Box 2641

Birmingham, AL 35291

F. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

_

Birmingham, AL 35291

H. O. Thrash

Manager-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

0. D. Kingsley, Jr.

Manager, Nuclear Engineering and

Technical Services

P. O. Box 2641

Birmingham, AL 35291

1

J. W. McGowan

Manager-Operations Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

W. G. Hairston, III

)

Plant Manager

Drawer 470

Ashford, AL 36312

i

l

l

,

t