ML19323D709

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 791231-800201
ML19323D709
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/07/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19323D684 List:
References
50-348-80-02, 50-348-80-2, 50-364-80-02, 50-364-80-2, NUDOCS 8005220196
Download: ML19323D709 (1)


Text

s.,

-a 6+

APPENDIX A NOTICE OF VIOLATION Alabama Power Company License No. NPF-2 Farley Nuclear Plant-Based on the NRC inspection December 31, 1979 - February 1,1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in correspond-ence to you dated December 31, 1974.

A.

As required by Technical Specification 6.8.b.c, written procedures stfall be established ad implemented for surveillance and test activities of safety related equipment.

Contrary to the above, on January 27, 1980, Work Request No. 21908 on I-A boric acid transfer pump was not completed in accordance with the instruc-tions delineated in Farley Nuclear Plant Administrative Procedure No. 52 in that the boric acid transfer pump was erroneously indicated to be operable during the performance of maintenance and the restoration and retest require-ments were not listed or Appended to the work request as required, even though the retest requirements had been completed.

This is a deficiency.

4 4

9 4

8005220

/fg

.