ML19323D695

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/80-09 on 800305-24.No Noncompliance Noted
ML19323D695
Person / Time
Site: Davis Besse 
Issue date: 04/21/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19323D696 List:
References
NUDOCS 8005220168
Download: ML19323D695 (2)


See also: IR 05000346/1980009

Text

-

__ _

- _

_ - - _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -

.f"%

. TIC

,

.#

6

UNITED STATES

['-

NUCLEAR REGULATORY COMMISSION

,

n

-

.r

REGION lli

%

g

[

799 ROOSEVELT ROAD

g % * * + ,e

GLEN ELLYN. ILLINOIS 6o137

APR 211980

.

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by L. A. Reyes of this office on

March 5-24, 1980 of the Order Modifying your license dated March 5, 1980

and to the discussions with Mr. T. D. Murry through the course of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observa-

tions, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

hold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

.

8005ggg j [ g

y

_ _ . . _

__

_

_ . _ _

.

.

1

t

Toledo Edison Company

-2-

APR 211980

,

We will gladly discuss any questions you have concerning this

-

inspection.

Sincerely,

c

. F. Heishman, Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

IE Inspection

Report No. 50-346/80-09

cc w/ encl:

Mr. T. D. Murray, Station

Superintendent

Central Files

I

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State

of Ohio

1

.

'

'

4

_

_%

__