ML19323D617

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-267/80-06 on 800303-28 & Notice of Violation
ML19323D617
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/10/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML19323D618 List:
References
NUDOCS 8005220030
Download: ML19323D617 (2)


See also: IR 05000267/1980006

Text

/

C__

/

/

.

.

UNITED STATES

/pa "'%co,'n

NUCLEAR REGULATORY COMMISSION

7 N*

REGION IV

E !@

C

611 RY AN PLAZA DRIVE, SUITE 1000

% ' r; . .._

.,[

ARLINGTON, TEXAS 7G012

$

,;, .[,/

April 10, 1980

....*

In Reply Refer To:

Docket No. 50-267/80-06

Public Services Company of Colorado

ATTN:

Mr. C. K. Millen

Senior Vice President

P. O. Box 840

-

Denver, Colorado

80201

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Mr. M. W. Dickerson of this office during the period March 8, 1980 to

March 28, 1980, of activities authorized by NRC Operating License DPR-34,

and to their discussions of the findings with members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in our report, which is

enclosed with this letter. Within these areas, the inspection consisted of

4

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

During this inspection it was found that certain of your activities were

not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation enclosed herewith as Enclosure (1).

This notice is sent

to you pursuant to the provisions of Section 2.201 of the NRC " Rules of

Practice," Part 2; Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance; and

(3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you or your contractors believe

to be proprietary, it is necessary that you make a written application within

i

l

!

!

8005220 ON

..

o

.

4

Public Service Company of Colorado

-2-

April 10, 1980

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it claimed that the information identified in the application

is contained in a separate part of the document.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

/j[ NISMw/

G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Notice of Violation

2.

IE Inspection Report No. 50-267/80-06

cc w/ enclosures:

[

D. W. Warembourg, Nuclear Production Manager

Fort St. Vrain Nuclear Station

P. O. Box 368

Platteville, Colorado

80601

L. Brey, Quality Assurance

(Same Address)

.

l

.