ML19323C881

From kanterella
Jump to navigation Jump to search
Forwards RO-50/219/80-16-1P Re Defective Pressure Switch
Date released: 12/03/2019 Download: ML19323C881


RO-50/219/80-16-1P:on 800420,during Surveillance of Generator Load Rejection Sensors,Pressure Switch Psl D Found Defective.Caused by Mislocated Operating Lever in Switch Housing.Switch Removed & Will Be Replaced
ML19323C883
Person / Time
Site: Oyster Creek
Issue date: 05/13/1980
From: Baran R, Schofield J
JERSEY CENTRAL POWER & LIGHT CO.
To:
References
Download: ML19323C883 (2)
Forwards RO-50/219/80-16-1P Re Defective Pressure Switch
ML19323C880
Person / Time
Site: Oyster Creek
Issue date: 05/13/1980
From: Carroll J
JERSEY CENTRAL POWER & LIGHT CO.
To: GRIER B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19323C880 (1)