AVERAGE DAILY UNIT POWER LEVEL 80051609 O '
DOCKET NO. 50-285 UNIT Fort Calhoun #1 DATE May 8. 1980 COMPLETED BY B. J. IIickle TELEPilONE h02-536 kh13 MONTli April, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe. Net)
- 0.0 0.0 37 2 0.0 jg 0.0 3 0.0 19 0.0 4 0.0 20 0.0 5 0.0 21 0.0 6 0.0 22 0.0 7 .j 0.0 23 0.0 8 0.0 2.s 0.0 9 0.0 25 0.0 10 0.0 - -
26 0.0 1I 0.0 27 0.0 12 0.0 28 0.0 13 0.0 29 0.0 14 _. 0.0 30 0.0 15 0.0 31 1
16 0.0 j 1
INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) e
OPERATING DATA REPORT DOCKETNO. 50-285 DATE May 6, 1980 CO.\ lPLETED fly B. J. Hickle TELEPil0NE -402-536-4413 OPERATING STATUS Fort Calhoun #1 Notes '
- l. Unit Name:
- 2. Reporting Period: April, 1980
- 3. Licensed Thennal Power (31Wt).
1420
- 4. Nameplate Rating (Gross 31We): 502
- 5. Design Electrical Rating (Net 31We): h57
- 6. Stasimum Dependable Capacity (Gross 31We): h81
- 7. 31asimum Dependable Capacity (Net 31We): h57
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
n/A
- 9. Power Lesel To Which Restricted.If An (Net 31We): N/A
- 10. Reasons For Restrictions.If Any: N/A This Slonth Yr..to.Date Cumulatise -
- 11. Ilours in Reporting Period 719 0 2,903.0 57,8h0.0 '
- 12. Number Of flours Reactor Was Critical 0.0 h32.9 44,83h.5
- 13. Reactor Reserve Shutdown flours 0.0 0.0 1,309.5
- 14. Ilours Generator On Line 0.0 h30.5 h3,881.6
- 15. Unit Resene Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (31Wil) O.0 574,730.9 53,809,760.2 .
17 Grou Electrical Energy Generated (31Wil) O d _.___ . 190.60h.0 17.850,833.6 IS. Net Fic.trical Energy Generated (.\1Wil) 0.0 180,935.1 16,868,h54.9
- 19. Unit Senice Factor 0.0 14.8 75 9
- 20. Unit Availability factor 0.0 14.8 75.9
- 21. Unit Capacity Factor (Using .\lDC Net) 0.0 13.6 64.3
- 22. Unit Capacity Factor (Using DER Net) 0.0 13.6 63.8
- 23. Unit forced Outage Rate 0.0 0.0 h.5
- 24. Shutdowns Schtduled Oser Ne.st 6 Stonths(Type. Date.and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: May 15, 1980 ,
- 26. Units in Test Status (Prior to Commercial Operation): Fm ecast Achiesed INITI A L CRIIICALITY INITIAI. ELECTRICITY CO\l\lERCIA L OPERaT10N (4/77) ,
UNIT S!!UTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-285 UNIT NAME Fort Calhoun #1 6
DATE 14ay o, 1960 COMPLETED BY B. J. Hickle REPORT MONTi{ Anril, 2o80 TELEPilONE 402-536 kh13
"- D 8 t ', 3; ._5 d ._E Licensee Event E
,% -f%
o3 Cause & Corrective Action to 2E 4 2 5 ::: Fy
- $ C,. 5 Report
- SU !' Prevent Recurrence e
~ .7O={ u t
80-01 800118 s 2,472.5 c 1 n/A Reactor shutdown for annual refueling and r.aintenance outage, t
I 2 3 4 F: Forced Reason: Method: Exhibit G . Instructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data 11-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & I.icense Examination F-Administrative 5 G-Operational Error (Exp'=in) , Exhibit I - Same Source (9/77) Il-Other (E xplain)
Refueling Infonnation Ibrt Calhoun - Unit No.1 .
i Ecport for the nonth ending April 30, 1980
.. March 15, 1981
- 1. Scheduled date for next refueling shutdown.
Scheduled date for restart following refueling. May 15, 1981 i 2.
r
- 3. Will refueling or resumption of operation thereafter
- require a technical specification change or other NO
,' license anend. Tent?
- a. If anscr is yes, what, in general, will those be?
I 4
5
- b. If answer is no, has the reload fuel design
- arxl core configuration been reviewed by
- i. your Plant Safety Review Connlittee to deter-mine whether any unreviewed safety questions No are associated with the core reload.
- c. If no such review has taken place, when is it scheduled? February 1,1981
- 4. Scheduled date(s) for cubmitting proposed licensing action and support inforTation.
J Inportant licensing considerations associated with
~
5.
refueling, e.g. , new or different fuel design or supplier, unreviewed design or performance analysis '
nethods, significant changes in fuel design, new operating procedures.
I .
j j
- 6. The number of fuel assenblics: a) in the core 133 assemblies b) in the spent fuel pool 197 c) spent fuel pool storage capacity 483
~.,
d) planned spent fuel Ix>ol storage capacity 483'
- 7. The projected 7. ate of the last refueling that can be j discharged to the spent fuel xx)l- 1 assunting the present
.licenced capacity. ' 19e5 Prepared by
//
/ /r M /
.. Date Apri1 30, 1980-V.
'6,.esmeem ees M -g,, 4 gw s.,W. A b i%'" _
4 .g __ _
! CMAHA PUBLIC POWER DISTRICT Fort Calhoun Station Unit No.1 April 1980 Monthly Operations Report
,l 1
I. OPERATIONS SUIO!ARY Fort Calhoun was maintained in refueling shutdown during the month of April.
l Operaticas completed required surveillance tests and supported special maintenance functions as required.
Simulator trainin6 at Combustion Engineering facility in Windsor, l Connecticut, began in April.
Preparations for unit startup continued throughout April.
j A. PERFOPPJUICE CHARACTERISTICS t
LER Number Deficiency _ .
LER-006 As directed by IE Bulletin 79-013 the transmitter lead splices on HPSI Loop Flow Transmitters, the Pressurizer Pressure Trscenitters and the Steam Generator Pressure TransmittLr= lack sufficient documentation to insure that the transmitters vill remain operable in a POST LOCA environment. The splices will be coated with RTV31h5 clear adhesive, which is a LOCA qualified adhesive / sealant.
B. CHANGES I'I OPERATDIG METHODS None C. RESULTS OF SURVEILLANCE TESTS AND DISPECTIONS i
i Surveillance tests as required by the Technical Specifications Section 3.0 and Appendix B, were performed in accordance with the annual surveillance test schedule. The following is a su= nary of the surveillance tests which results in Operatiens Incidents and are not reported elsewhere in the report: '
Operations >
Incident - Deficiene;L .
OI-955 (ST-ESF-3) A/PC-Th2-2 out of tolerance.
OI-95h (ST-FD-1)
Several. detectors out of tolerance.
OI-959 (ST-RPS-5) C/ PIA-102Y out of tolerance.
OI-958 (ST-ESF-8) LI-290hx, LT-290hY, LT-992hY, LT 999hY cut of tolerance.
OI-956 (ST-ESF-8) A/PC-765, D/PC-765 out of tolerance.
1
(
i i
we 4 -- ~ -
Monthly Operations Report April 1980 Page Two D. CHA*IGES, TESTS AND EXPERIMENTS CARRIED OUT WITHOUT COMMISSION APPROVAL Procedure Descriptien EEAR-78-52A Control Room Walk-in Cabinet Weather Stripping /
completed as designed.
DCR 77-26 Add drain line and valve to Auxiliary Feed Pump Sprinkler System /ccmpleted as designed.
EEAR 78-52A/ Halon Discharge Test Centrol Rocs Walk-in MP-FC-78-52A Cabinet / completed as designed.
DCR 77-26 Rerette Fire Water Loop Pipe /ccmpleted as desigrwa.
SP-SOBS-2 Examination of Welds in Stagnant Oxygenated and Borsted Systems. No indications - continued operation justified.
SP-RCS-TEMP-1 RCS Temperature Rise with Shutdevn Cooling secured. RCS Heatup on h-9-80, 9 - 10 F.
per hour.
DCR 77-25 Fire Detector Modification / completed ac designed.
CR ThB-63 Remote Annunciation of Warehouse Sprinkler System /ccmpleted as designed.
PM-RM-1 Radicactive Scurce Surveillance of Licensed Scurces not at the Fort Calhoun Station / test completed with no significant abncrmalities.
SP-VA-60 Hydrogen Purge System Test.
SP-ICI-l ICI Flange Hydrostatic Testing. ,
E. RFSULTS OF LEAK RATE TESTS During the =enth of April, 1980, the plant was in a Refueling Shutdown condition. Local leak rate test continued on an "as needed" basis after valve and penetration repair. A comprehensive leak rate report will be forthecming.
F. ~ CHANGES I'T PLANT OPERATING STAFF None
I
~' ' " *
~ Monthly Operations Rapert
. April 1980 Page Three i
G. TRAINING 1
Training during the centh of April included Radiation Protection for contract. personnel working on site, Cycle 6 training for all operators and Monitor Team training. Siralator Requalification Training at the Cc=bustion Engineering Simulator in Windsor, Connecticut, began during the month.
H. CHNIGES, TESTS A'ID EXPERDIENTS REC.UIRING NUCLEAR REGULATCRY CO CiISSION AUTHORIZATICH PURSUANT TO 10CFR50.59 1
! 1. Changes to Facility Operating License DPR-40 l Amendment No. hT, dated April 1, 1980 The amendment revises Appendix A Technical Specifications-i for Cycle 6 core reload and reactor coolant system heatup 4
and cooldown.
i t
1 I
J kj !
Approved By ~
}I \ \l N
~
j ftnager-F6rt Calhoun Station l
- \ l i
I l
1 l
i i
I f
f
\
U' %. -
l
Menthly Operstions Report Pass
- . MA!:r'I'!!CICI (51gnift:act Safe:/ Reisted)
M. O.
- Date i Description Corrective Acti n h136 3-3-80 Modify ACS-2h6/P57 Pipe restraint. Work performed, pipe restraint returned to operating condition.
h1h3 3-3-80 Modify ACH-283/ACS-103 Work performed, pipe restraint returned to operating condition.
h355 3-3-80 Modify SIS-131 Work perfor=ed, pipe restraint returned to operating condition.
h3h2 3-3-80 Modify RCS-Sh Work performed, pipe restraint returned to operating condition.
h3h1 3-9-80 Modify SIS-129 Work perfor=ed, pipe restraint returned to operating conditidn.
h3ho 3-12-80 Modify SIS-120 Work performed, pipe restraint returned to operating condition.
L828 3-11-80 Modify SIS-117A Eliminate contact with SI-6B tank pipe to 23 RC loop.
h158 2-27-80 Gasket leaking FC #1 CVCS letdown Torqued head to 700 ft.lb.
heat exchanger head.
4811 3-18-80 Fuel oil transfer pumps 1 and 2 do Changed Filters, cleaned strainers not pump. and foot valves.
h853 3-12-80 Remove WDH-278. This han6er has been removed.
h856 3-12-80 Remove WDH-279 This hanger _has been removed.
h85h 3-19-80 Re=ove WDH-290. This hanger has been removed.
h56h 3-12-80 Grout pipe support at RCH h5 Work performed, hanger returned to operating condition.
h928 3-21-80 Modify Restraint ACH-3hT. Work performed, hanger returned to operating condition.
h720 3-21-89 Modify Restraint ACH-301. Work performed, hanger returned to operating condition.
h929 3-21-80 Modify Restraint ACE-3hk. Work performed, hanger returned to operating condition.
L852 3-21-80 Modify Restraint RCH hh. Work performed, hanger returned to operating condition.
/F4WWm DEwee hg.Saw __ w %d W p
- v v
Monthly Operations Report Page II. MAI:T~I'!A:!CI (51gnifi: ant Safaty Related)
M. O.
- L Cate l Descri;;ict Corrective Acti n hT57- 3-28-80 Replace danaged pipe restraint Replaced hanger rods damaged CIH-139 during installation of retrofit design.
h903 3-20-80 Mradify WDH-336/and WDS-173 Work performed, hanger and support returned to operating condition.
h878 3-23-80 Modify WDH-282/and WDS-158. Work perforced, hanger and support returned to operating condition.
4857 3-23-50 Re=ove Pipe restraint ACS h2-16. Work performed.
hT97 3-28-80 Modify Pipe restraint AC Detail "A". Work performed. ,
h585 3-19-80 Modify SIE-139 Work perfor=ed, hanger returned to operating condition.
k335 3-19-80 Modify FWH-160. Work performed and hanger returned to operating condition.
h390 3-18-80 Modify SIS-118A. Work perfor=ed and support returned to operating condition.
hThh 3-25-80 Modify SIS-95 Work perfor=ed and support returned to operating condition.
1 h900 3-23-80 Modify ACS-96. Work performed and support returned to operating condition.
h989 3-23-80 Modify SIS-13h. Work perfor=ed and support returned to operating condition.
h6h8 3-12-80 Modify ACS-269 Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
h860 3-18-80 Modify CAS-37 Work performed, pipe restraint returned to operating condition.
b137 3-1-80 Modify ACS-2h3/25h Pipe Restraint. Work performed, pipe restraint returned to operating condition.
hTh9 3-27-80 Modify ACS-29A Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h805 3-3-80 Modify FWH-52. Work perfor=ed, pipe restraint
- j. returned to operating condition.
Am* *mee-mai-+ +
Mcnthly Opera *; ions Repcrt Pige II. MAIZ ETA'ICI (Signift: ant Safety et. lated)
M. 3.
- Cate i Description Corrective Acticn ___
h802 3-3-80 Modify SIS-162 ripe Restraint. Work perfor=ed, pipe restraint returned to operati ; condition.
5063 3-31-80 Modify RWS-52A Pipe Restraint. Work perforned, pipe restraint returned to operating ccndition.
h583 3-10-80 Modify ACH-h35 Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
h565 3-10-80 Modify RCH 46 Pipe Restraint. Work perfor=ed. pipe restraint returned to operating condition.
h563 3-12-80 Modify WDH-332/171A Pipe Restraint. Wort perfor=ed, pipe restraint, returned to operating condition.
h551 3-7-80 Modify ACS-120 Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
45hh 3-11-80 Modify MSS-6 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h6h7 3-11-80 Modify ACS-233 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h861 3-lh-80 Modify WDS-171/WDH-305 Pipe Restraint Work performed, pipe restraint returned to operating condition.
hSk8 3-16-80 Modify CAS-h7 Pipe Restraint. Work performed, pipe restraint returned to opersting condition.
h600 3-16-80 Repair SIS-115 Pipe Restraint. Work perforned, pipe restraint returned to operating condition.
h868 68 1-0 Repair WDS-lh6A Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
'h35h 3-12-80 Modify SIS-122 Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
h139 3 h-80 Modify MSS-2 Pipe Restraint. Work performed, pipe restraint returned to operating ccndition.
3717 3-8-80 D/PIC-902-Signa, per=issive to Sigma maintenance procedure block setpoint drift down. MP-SIGMA-1 used for check.
R?placed both LID's.
3716 3-8-80 C/PIC-905-Sig=a, permissive to signa =aintenance procedure i
block setpoint drift down. MP-SIGMA-1 used for check.
2;;;;_ _; ;;r.. 1:0 ' ; .
r V
Menthly C"eratices Report
? tge II. MAIUTETA30Z (Significant Safecy Related)
M. 3. # Date ! Descrip:1cn Corrective Actica h250 3-7-80 Containment Sump Level - LT-505 Installed new cable from a=plifier Sensor for containment su=p level thru seal tile to sensor. In-sensse dead, stalled SNC male and female con-nectors on sensor end of cable.
Calibrated sensor.
3715 3-8-80 D/PIC-905 Sissa. Permissive to Sig=a =sintenance procedure block setpoint drift down. MP-SIGMA-1 used for check.
Replaced both LED's.
h165 3-lh-80 Metrascope, USPI 00S/0VLP and IISP Replaced bad relay, repaired cold Master Alarm LLSP Setpoint drifts. solder joint. Performed SCEAPIS to verify operability. ,
hS33 3-21-80 W.D. 143 Spent Regent. Pu=p has Adjusted packing, corrected seal leakage. leakage.
I h325 WD-3h Spent Resin pump leaking. Replaced packing and packing gland installed.
h523 3-8-80 D/PIC 905 Low Alarn LED vill not Replaced LED's, perform ST-ESF-11.
clear.
h6h0 3-8-80 solenoid Air Valve with du=p vent Replaced Pilot Stem and Block on D-2 is blowing air out of a Assembly, hole in bottom of the valve.
h550 3-9-80 Modify FWH-111. Work perfor=ed, hanger returned to operating condition.
kS98 3-12-80 Modify FWH-169 Work perfor=ed, hanger returned to operating ccndition.
4793 3-27-80 Renove restraint ACS-296. This modification consisted of support removal only. Work performed.
i 4901 3-17-80 Modify CAS-40. Work performed, support returned to operating condition.
h931 3-20-80 Modify CAS kh. Work performed, support returned to operating conditien.
5000 3-20-80 Modify WDS-155 Work perfor:ed, support returned to operating condition.
h906 3-20-80 Modify WDS-198. Work perferred, support returned to operating condition.
$ v eo n Monthly Operations Report Page
!!. MA!:~fEIA'ICR (Signif t:an: Safety Related)
- f. 9. 4 Cate i Descripcien Corrective Action h336 3-7-80 Modify FWS h9 Work perforned, support returned to operating condition.
h315 3-lh-80 Modify RCS h Work perfor=ed, support returned to operating condition.
h599 3-14-80 Install new pipe restraint This work perfor=ed per design FW h27-68. and procedure.
b907 3-18-80 Install new restraint ACS-3h6. This work perfor=ed per design and procedure.
kS8F 3-17-80 Modify ACS-111. This work perferned, support returned to operating conditio'n.
h909 3-17-80 Modify ACS-242 and 253 This work perfor=ed, support returned to operating condition.
h357 3-5-80 Modify RW-108 Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
4392 3-7-80 Modify RCH-5h Pipe Restraint. Work performed, pipe restraint returned to operating condition.
b182 3-1-80 Modify RCS-3A Pipe Restraint. Work performed, pipe restraint returned to operating condition.
hill 3-3-80 Modify RCS-19 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h39h 3-5-80 Modify CAS-3h Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition. ,
h926 3-27-80 Modify ACS-lh9 Pipe Restraint. Work performed, pipe restraint
- returned to operating condition.
h317 3-10-80 Repair SIS-166 Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
h322 3-1-80 Repair RCS-53 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h186 3-1-80 Repair ACS-2h5 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
. h187 3-3-80 Repair SIH-180 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
M OV T T
4 Menthly C;orati:es Reper Page
!!. MAIrr:A*:02 (Significan: Safety Related)
M. 3.
- Oate Descri;;1on Corrective Actica h375 3-10-80 Repair SIS-121 Pipe Restraint. Work performed, pipe .estraint returned to operatin6 condition.
L562 3-17-80 Repair WDS-186/CAS-h5 Pipe Restraint. Work perforned, pipe restraint returned to operating condition. -
h376 3-17-80 Repair FWS h8 Pipe Restraint. Work perferned, pipe restraint returned to operating condition.
h370 3-8-80 Repair FWS h0 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h368 3-7-80 Repair RCS-TA Pipe Restraint. Work performed, pipe restraint returned to operating conditio'n.
h95h 3-15-80 Re=ove ACH-319 Pipe Restraint. Work Completed.
h855 3-16-80 Remove WDS-157 Pipe Restraint. Work Completed.
k961 3-17-80 Re=ove WDH-302 Pipe Restraint. Work Completed.
kT9h 3-27-80 Remove ACH-345 Pipe Restraint. Work Ccmpleted.
h922 2-15-80 Reveld ACS-99/ACH-278 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h773 3-25-80 Finish Weld SIS-127A Pipe Restraint. Work performed, pipe restraint returned ta operating condition.
h863 3-l'-80
- Grout holes RCS-17, MSS h, RC-59, Work cc=pleted.
WDS-261.
h676 3-3-80 Lift floor plugs El.1025 Aux. 31ds. Plugs lifted and piping inspected.
for inspection of piping.
h58h 3-12-80 Modify RCS kh Pipe Restraint. Work perforned, pipe restraint returned to operating condition.
h997 3-20-80 Modify WDS-15h Pipe Restraint. Work perfor:ed, pipe restraint returned to operating condition.
h5h7 3-20-80 Modify CAS-5h Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h92h 3-19-80 Modify WDS-167 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
g*. A
. . e Monthly 0;erati ns Report Page
!!. MA!: CIA:iCZ (Significant Safety Related) l M. 3.
- Cate Description Corrective Act10n Modify SIS-128 Pipe Restraint.
~
h321 3-1-80 Work perfor=ed, pipe restraint returned to operating condition.
h771 3-27-80 Modify ACS-138 Pipe Restraint. Work performed, pipe restraint I returned to operating condition.
h393 3-10-80 Modify FWS-38 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h940 3-17-80 Modify FWH-110 Pipe Restraint. Work perfor=ed, pipe restraint 4
returned to operating condition.
5032 3-31-80 Modify SIH-lh8 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h5h9 3-11-80 Modify ACH-351 Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
4303 3-3-80 Modify ACS-98 Pipe Restrain 3. Work performed, pipe restraint returned to operating condition.
h301 3-5-80 Modify FWS-2C Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
h323 3-3-80 Modify SIS-159A Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h337 3-3-80 Modify FWH-10h Pipe Restraint. Work performed, pipe restraint returned to operating condition.
k338 3-6-80 Modify SIS-158 Pipe Restraint. Work perfor ed, pipe restraint returned to operating condition.
h339 3-3-80 Modify FWH-109 Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
h859 3-17-80 Modify WDS-19h Pipe Restraint. Work performed, pipe restraint returned to operating condition.
h200 3-3-80 Modify RCS-52 Pipe Restraint. Work performed, pipe restraint returned to opersting condition.
h199 3-T-80 Modify MSS-5 Pipe Restraint. Work perfor=ed, pipe restraint returned to operating condition.
4172 3-3-80 Modify RCS-53 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
4 Monthly Operatices Repor,
! Pye II. MA!:T"2"Wi!I (Signifitant Safety Related)
M. O.
- Date Description l Corree:1.e A :1:n k1h7 3-7-80 Modify SIS-153 Pipe Restraint. Work performed, pipe restraint j returned to operating condition.
L211 3-3-80 Modify SIS-176 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
i hihl 3-1-80 Modify FWS-39 Pipe Restraint. Work performed, pipe restraint returned to operating condition.
4 6
1
.I A
i i
4 4
1 4
.~ .
- -4-ema -pw- y-