Text
.
O( -
,,o, 800s2 8o o7.3 UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
(
WASHINGTON. D. C. 20665 6.,
a/
L C0>t10NWEALTH EDISON COMPANY DOCKET NO. 50-237 DRESDEN STATION UNIT NO. 2 AME DMENT TO FACILITY OPERATING LICENSE i
Amendment No. 48 License No. DPR-19 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Commonwealth Edison Company (the licensee) dated February 7,1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amendeo by changes to the Technical Specifications as indicated in the attachment to this license amend-ment, and paragraph.3.B of Provisional Operating License No. DPR-19 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 48, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
. 3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Y$~q Thomas A. Ippolito, hief Operating Reactors Branch #3 Division of Operating Reactors.
Attachment:
Changes to the Technical Specifications Date of Issuance: April 17,1980 4
4 1
r t
s i
ATTACHMENT TO LICENCE AMENDMENT NO. 48 PROVISIONAL OPERATING LICENSE NO. DPR-19 DXKET NO. 50-237 Replace the attached page 123 of the Appendix "A" Technical Specifications with the attached revised page.
i i
I
.l l
4 l
A I
TABLE 3.7.1 PRU!ARY C0!!TAINMU;T ISOf.ATTON DPR-39
!!uuher of Pouer Pfaximum Action on Isolation Op..ra t eil V.;1v :.
Operating Norma l Initiating P yi rion S I; pia l 3 l
. Croup -
Valve Identification In!,oa r.1 Out board Time (r:cc) 1
}Litn Seca:n Line Isolation 4
4 3<T<5 0
CC 7 35~
C SC l'
tLiin Stcr.ui Line Drain 1
1
] 35 C
SC 1
llain Steam Line Drain Hote 1 1
Recirculation Loop Sampic Line 1
1 1 5 0
SC
< 5 0
GC
'1-Isolation Condenser Vent to main accam line 1 1-Isolation Condenser Vent to main steam line 1
35 0
CC 2
< 20 0
CC 2
Drywell floor drain 2
1 20 0
GC 4
Drywell D uipment drain
.' 2 i
2
< 10 C
SC 2
Drywell Vent
~
2 Dryuell Vent Relief 1
1 15 C
SC 2.
Drywell Inert and purge #1601-21 1
< 10 C
SC 2
Drywell N2 tlakeup #1601-59 1-1 15 0
CC 2
Drywell and Suppression Chamber N2 1
1 15 0
CC Hakcup #1601 2 Dryuell and. Suppression Chamber Inett 1
1 15 D
- 1 t,01-5 5 1
1 15 C
SC 2
Suppression Chamber N2 Hakeup #1601-58 2
Suppre:.sion Chamber inert and purge #1601-56 1
1 10 0
GC 2
Dryuell and Suppression chamber vent from 1
< 10 C
SC rea.: tor building #1601-22 i
1 10 C
SC 2
Drywell vent to standby gas treatment system 1
1 10 C
SC.
2
. Suppression chamber vent 1
1 15 C
SC 2
Suppression chamber vent _ relief 10 5
0 GC
. Note 1 2 Dryuell air sampling system 2
1 10 0
GC 2
Dryacil Pnenmatic Supply Isolation l2 Torus to Condenser Drain 2
1 10 C
Sc 3
Cle..r.up demincralizer ' System 1
1 30 0
CC 2
1 30 0
CC k.
3 Claunup demincralizcc System 2
1 40 C
SC i
3_
Shutd.wn cooling system 1
1 40 C
SC 3
Shutdown cooling system 1
1 40 C
SC S
3 ShutJ.,un cooling uystem 1
< 15 C
SC 3
Re.:ccor head cool f og line P
4-nect rochine Steam so;> ply 1
1 25 0
GC z
1 1 25 0
GC 4
liPJI rurbine Steam supply Co 5
I.salation condenser steam supply 1
1 30 0
CC 3
1 1 30 0
CC 5
Twl..tlon con.lenser steam supply 5
I: lation condenser condensato return 1
1 30 0
CC-1 1 30 C
SC 5
Ia.21 tion condenser condensate return Note 1: Valve c n te reopened af ter isolation for sampling.
123
f[
'o,,
. UNITED STATES NUCLEAR REGULATORY COMMISSION E
o
,E WASHINGTON. D. C. 20556
\\ *** /
COPN0hWEALTH EDISON COMPANY DOCKET NO. 50-249 DRESDEN STATION UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE e
Amendment No. 43 License No. DPR-25 l
1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Comonwealth Edison Company (the licensee) dated February 7,1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance-(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, ths license is amended by changes to the Technical Specifications as indicated in the attachment to this license amend-ment, and paragraph 3.8 of Provisional Operating License No. DPR-25 is hereby amended to read as follows:
B.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 43, are hereby incorporated 1
in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
j l
2-3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COP 9tISSION j
u Thomas A. Ippolito, C ief Operating Reactors Branch #3 Division of Operating Reactors
Attachment:
Changes to the Technical Specifications Date of Issuance:
April 17, 1980 4
1 0
1 4
J
i ATTACHMENT TO LICENSE AMENDMENT NO.'43 FACILITY OPERATING LICENSE NO. DPR-25 DOCKET N0. 50-249 Replace the attached page 123 of. the Appendix "A" Technical Specifications with the attached revised page.
ir l
l f
8 f
1 i
i J
a 4
1
. e wm -
- e ep-w as es-e e
. 1sw+
= m e
w
- ~'
,h--
7
TA11LE 3.7.1 PRIMARY C0tiTAItafEfft ISOLATION DPR-25 Number of Power Maximum Action on Isolation Operated Valves Operating Normal Initiating Valve Identification Inboard Outboard Time (sec)
Position
_Sinual Group _
1 lbin Steam Line Isolation 4
4 3<T<5 0
CC 1
Main Steam Line Drain 1
3 35-C SC 1
< 35 C
SC 1
Main Steam Line Drain Note 1 1
Recirculation Loop Sample Line 1
1 35 0
SC
< 5 0
CC 1
Isolation Condenser Vent to main steam line 1 1
Isolation Condenser Vest to main steam line 1
35 0
CC 2
< 20 0
CC 2
Drywell floor drain 0
GC 2
320
-2 Drywell Equipment drain 2
1 10 C
SC 2
Drywell Vent 1
< 15 C
SC 2
Drywell Vent Relief 1
5 10 C
SC 2
, Drywell Inert and purge #1601-21 2
Drywell H2 Hakeup #1601-59 1
1 15 0
GC 2
Drywell and Suppression Chamber N2 1
1 15 O
CC-Hakeup #1601-57 2
Drywell and Suppression Chamber Inert 1
< 15 0
GC
- 1601-55 1
1 15 C
SC 2
Suppression Chamber N2 Hakeup. #1601-58 1
1 10 0
CC 2
Suppression Chamby inert and purge #1601-56 2
Drywell and Suppression chamber vent from 1
1 10 C
SC reactor building #1601-22 1
1 10 C
SC 2
Drywell vent to standby gas treatment system
~1 1 10 C
SC 2
Suppression chamber vent 1
< 15 C
SC 2
Suppression chamber vent relief 10 5
0 GC Note 1
-2 Drywell air sampling system 2
< 10 0
GC 2
Drywel1 Pueimwitic Supply Isolation 2
5 10 C
SC l
2 Torus to Condenser Drain 7
3 Cleanup demineralIzer System 1
< 30 0
r,C 2
< 30 0
CC 3
. Cleanup 'emineralizer System 2
< 40 C
SC 3
Shutduwn cooling system g
1
< 40 C
SC 3
Shutdown cooling system 3
1
< 40 C
SC 3
Shutdown cooling system 1
515-C SC 3
Reactor head cooling line 4
IIPCI Turbine Steam supply 1
< 25 0
CC I
< 25 O
CC g
4 IIPCI Turbine Steam supply 5
Isolation condenser steam supply 1
1 30 0
CC 5
Isolation condenser steam supply.
I 1 30 0
GC 5
Isolation condenser condensate return 1
< 30 0
GC 1
5 30 C
SC 5
Isolation condenser condensate return l
Note 1; Valve can be reopened af ter iso 1'ation for sasipling.
123
- -. -