ML19323C065
| ML19323C065 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/26/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hancock J FLORIDA POWER CORP. |
| Shared Package | |
| ML19323C066 | List: |
| References | |
| NUDOCS 8005140621 | |
| Download: ML19323C065 (2) | |
See also: IR 05000302/1980008
Text
-
7
8005140 @( W G
.
/
UNITED STATES
"% "zw ^,
8
n
NUCLEAR REGULATORY COMMISSION
'
s
<z
REGION 11
0,
'[
101 MARIETTA ST., N.W., SUITE 3100
b
ATLANTA. GEORGIA 30303
%
o
In Reply Refer To:
RII:RHW
50-302/80-08
Florida Power Corporation
ATTN:
J. A. Hancock, Director
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
This refers to the inspection conducted by R. H. Wessman of this office on
February 19-22, 1980 of activities authorized by NRC Operating License No.
DPR-72 for the Crystal River facility, and to the discussion of our findings
held with D. C. Poole at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the insl.ector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. ' Any such application must
include a full statement of the reasons on the basis of which it is claimed that.
the information is proprietary, and should be prepared so that proprietary infor-
1
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this reg'ard within the specified period,
the report will be placed in the Public Document Room.
(
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
i
l
E. c .
l
R. C. Lewis, Acting Chief
i
Reactor Operations and Nuclear
Support Branch
,
l
Enclosure:
l
See Page 2
1
.-.
.
. ~ . -
.. ..
..
-. -. .- - _-
-
._
. . - _
- _ - -
_
i.
- ,
g1$N
r
/
Florida Power Corporation
-2-
,
i
i
Enclosure:
!
Inspection Report No. 50-302/80-03
i
}
cc w/ encl:
D. C. Poole
Nuclear Plant Manager
P. O. Box 1240
,
Crystal River, FL 32629
,
I
i
4
I
l
>
l
i
!
i
l
!
}
r
i
l
t
I
i
k
a
,
i
_.
3
4
,
.
I
1
i
a
i
!
I
1
.
!
I
t
i
'
!
I - - -
,. .
. - - -
- _ _
_ _ _ - _ - . _ _ . . . . , _ . _ _ _ _ . _ _ . _ _ _ , _ _ . . _ , . , . . - _ . - . . _ . _ _ _ . . . . . _ - . - . ,.
-
,
-
-