Forwards IE Insp Rept 50-369/80-02 on 800225-29.No Noncompliance Noted
ML19323B928
Person / Time
Site: McGuire 
Issue date: 04/01/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19323B923 List:
References
NUDOCS 8005140428
Download: ML19323B928 (2)


See also: IR 05000369/1980002

Text

l

f

/

UNITED STATES

o

8005140 $ $

8

k

NUCLEAR REGULATORY COMMISSION

3

REGION 11

,a

o,

~[

101 MARIETTA ST

N.W., SUITE 3100

'd

b

ATLANTA, GEORGIA 30303

o

APR - 11980

In Reply Refer To:

RII:WJM

50-369/80-2

Duke Power Company

-

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Genti men:

This refers to the inspection conducted by W. J. Millsap of this office on

February 25-29, 1980 of activities authorized by NRC Construction Permit No.

CPPR-83 for the McGuire Nuclear Station facility, and to the discussion of our

findings held with D. J. Rains at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application withia 20 days to this office to

withhold such information from public disclosure. Any such application must

.

include a full statement of the reasons on the basis of which it is claimed that

the informatior. is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

,

Sincerely,

-

.

.

. Philip S hr, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

'

See Page 2

4

,p..

, , , ,

,,w

,g h .4

-

---

  • -

-

  • ' ~ * "

"

  • ~

-- - - - - - - -

-

,

-

- - , . -

--9

, *,

g

- -

.

. .

.

-

._ .

.n-..-....

..

- - - . - .

-.

-- - .

.

.

.

I

Duke Power Company

-2-

APR - 1 1980

Enclosure:

Inspection Report No. 50-369/80-2

cc w/ enc 1:

M. D. McIntosh, Plant Manager

i

P. O. Box 488

Cornelius, NC 28031

J. C.' Rogers, Project Manager

P. O. Box 33189

-

Charlotte, NC 28242

,