ML19323B350
| ML19323B350 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/19/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19323B351 | List: |
| References | |
| NUDOCS 8005120268 | |
| Download: ML19323B350 (2) | |
See also: IR 05000327/1980005
Text
. _ _ _ _ _ _ _ _ _ _ _ .
8 0 v5 U0%7
-77t?
/. a,eQ'o
Q
.
UNITED STATES
8
- 'n
NUCLEAR REGULATORY COMMISSION
d ' #.
.r
REGION 11
o
8
101 MARIETTA ST
N.W.. SulTE 3100
l
E
j
ATLANTA, GEORGIA 30303
+....
!
MAR 191980
In Reply Refer To:
RII:MCA
50-327/80-5
50-328/80-4
Tennessee Valley Authority
ATTN: 11. G. Pa r ri s
Manager of Power
500A Chestnut Street Tower II
/
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by M. C. Ashenden of this offide on
February 12-15, 1980 of activities authorized by NRC Construction Permit Nos.
CPPR-72 and CPPR-73 for the Sequoyah facility, and to the discussion of our
findings held with J. M. Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
!
enclosed inspection report.
Within these areas, the inspection consisted of
'
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope ef this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulationa, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
t iie information is proprietary, and should be prepared so that proprietary
infctmation identified in the application is contained in a separate part of the
docurren t . If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
f. l,
R. C.
wis, Acting Chief
Reactor Construction and Nuclear
Support Branch
Enclosure:
See Page 2
--
__
_ _ - _ _ - _ _
__
_ _ _ _ _
_ _ _ _ _ _ _ _ _ _
.
MAR 191990
Tennessee Valley Authority
-2-
,
Enclosure:
Inspection Report No. 50-327/80-5
and 50-328/80-4
cc w/ encl:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
s'
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
'
400 Commerce Street
W10Cl31 C-K
Knoxville, TN 37902
D. L. Lambert , Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
T. B. Northern
Construction Engineer
Post Office Box 2000
Spring City, TN 37381
E. G. Beasley
Tennessee Valley Authority
309 Grant's Building
Knoxville, TN 37902
i
1
1
l