Forwards IE Insp Rept 50-267/80-02 on 800201-29 & Notice of Violation
ML19323B257
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/19/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML19323B258 List:
References
NUDOCS 8005120155
Download: ML19323B257 (2)


See also: IR 05000267/1980002

Text

.- -

__

._

_

. - _

- -

-

-

- --

suosisols5

3

- - - -

---

,

r%

T/C

/

,%

UNITED STATES

[ 'h

[j

NUCLEAR REGULATORY COMMISSION

- , %Trf

f

REGION IV

i

h..

M[

611 RY AN PLAZA o AIVE. SUITE 1000

9

"f

A At.INGToN. TD AS 7601t

,

' **~*

March 19, 1960

n Reply Refer To:

j

Docket No. 30-267/30-02

'

i

!

Public Service Company of Colorado

ATTN:

Mr. C. K. Millen

,

t

Serior Vice President

'

P. O. Box 840

Denver, Colorado

80201

Gentle =en:

I

This refers to the inspection conducted under the Resident Inspection Program

by Messrs. M. W. Dickerson, R. E. Collins, R. G. Spangler, and L. A. Yandell

of this office during the period February 1, 1980 to February 29, 1980, of

j

activities authorized by NRC Operating License DPR-34, and to their discussions

1

l

of the findings with members of your staff at the conclusion of the

'

I

inspection.

l

Areas examined during this inspection are described in our report, which is

,

i

enclosed with this letter. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

1

During this inspection it was found that certain of your activities were

not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation enclosed herewith as Enclosure (1).

This notice is sent

to you pursuant to the provisions of Section 2.201 of the NRC " Rules of

Practice," Part 2; Title 10, Code of Federal Regulations.

See:1on 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in repl'/ including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) correct?ve steps which will be taken to avoid further noncompliance; and

(3) the date when full compliance wi.11 be achieved.

l

In accordance with Section 2.790 of the NRC's Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you or your contractors believe

to be proprietary, it is necessary that you =ake a written application

l

l

.

. _

,

.

-.

---

- - -

-

-

. _ _ .

-

-

.

. .

-

_ .

. - , . . -

-

.

- -

-- . _ . -

.

.

,

,

l

-

i

Public Service Co=pany of Colorado

-2-

March 19, 1980

i

i

,

within 20 days to this office to withhold such information from public

.

!

disclosure.

Any such application must include a full state =ent of the

]

reasons on the basis of which it cla1=ed that the information identified

l

in the application is contained in a separate part of the document.

If

j

we do not hear from you in this regard within the specified period, the

i

report will be placed in the Public Dccu=ent Room.

4

I

!

Should you have any questions concerning this inspection, we will be

I

pleased to discuss them with you.

!

a

Sincerely,

!

i

4.bb b a h-/

G . L. . dsen, Chief

Reactor Operations and

Nuclear Support Branch

i

Enclosures:

1.

Notice of Violation

2.

IE Inspection Report No. 50-267/80-02

,

cc w/ enclosures:

.

4

D. W. Warembourg, Nuclear Production Manager

i

Fort St. Vrain Nuclear Station

?. O. Box 368

)

Platteville, Colorado

80651

1,

L. 3 rey, Quality Assurance

(Same Address)

i

!

'

1

i

i

i

i

i

d

]

!

'

t

l

. , -

. _ _ _ , _ _

___ __

_

_ _ _ .

_

.

.

. .

.

.