y~6 t
~j OPERAllNG DATA REPORT DOCKEf NO. 50-302 DALE 41.1/80 COSIPLETED 11Y FNSulver 1 ELEPilONE (W4) 795-6486 OPERAIING S1 AlUS
- 1. Unit Name: Crystal River #3 Notes
- 2. Reporting Period: 1/1/Rn - 1/31/80
- 3. Licensed Thennal Power (51Wt p: 2457
- 4. Nameplate Rating (Gross alwe):
890~
- 5. Design Electrical Rating (Net 51We):
825
- 6..\\tasimum Dependable Capacity IGross 51We): H21
- 7. 51asimum Dependable Capacity (Net SlWe):
- 782
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
SERC. ratings __Q1DC_ gross and net - #6 and #7) were changed based on examination of past performance data.
- 9. Power Lesello Which Restricted. lf Any (Net 51We):
None
- 10. Reasons For Restrictions. If Any:
This Slonth Yr. to.Date Cumulatise
- 11. Ilours in Reporting Period 744 2184. _
26760
- 12. Number Of flours Reactor Was Critical 0
1305 5._.
16455.8
- 13. Reactor Rewne Shutdown llours 0
0 1116.9
- 14. Ilours Generator On.Line 0
1297.4 15997.6
- 15. Unit Resene Shutdown llours 0
0.
0
- 16. Grow Thennal Energy Generated (51Wil) 0 3085927 35402838.
17 Gross Electrical Energy Generated (.\\lWil) 0,__,_
1058396 12030164 Ib. Net Electrical Energy Generated (51Wil) 0 1009335.
- 11400975,
- 19. Unit Senice Factor 0
59.4%
59.87.
- 20. Unit Asailability Factor 0
59.4%
59.8%
- 21. Unit Capacity Factor (Using 51DC Net) 0 59.17 54.5%
22 Unit Capacity Factor (Using DER Net) 0 56 0J.
51.6%
t
- 23. Unit Forced Outage Rate 21.0%
18.0%
34.4%
- 24. Shutdowns Scheduled Oser Nest 6 51onths (T pe. Date,and Duration of Eacht:
3 Cont _itutinn refuelinn outage
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
5/16/80
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INill \\ L ( RillCAl.Il Y 1/14/77 O
INi ri n EttCiiuCliY 1/30/77 CO\\l%1ERCIR OPER AIlON 3/13/77 800421OPf0
'" A
DOCKLT NO. 50-302 UNil SilU lllOWNS ANI)l>Oh ER Rf.!)t!riloNg U NI I N A',tl FLCRP-3 DVIE 4 /1/R0
'Ed" REPolt f MON Ill MARCH g LLgylloNL (904) 795-6486 I
.E E
v
.i ?
,b 4 s'i t acnsee E-r st s roire,ine
\\"-
U HC I
3@
d
,5 5 $
l . c u t 5$
E.~3 4,non go 53 jdg Report Ji C Prescia Recurrence 6
80-9 800301 F
156 A
3 80-010/0lT IF INSTRU Continuation of outage began 2/26/80 with loss of power to part of the plant instrumentation.
80-10 800307 S
588 C
4 N/A The refueling outage was begun early ZZ ZZZZZZ since the plant was already shutdown for the forced outage of 2/26/80.
1 i
I 2
3 4
f: Fo ced Reason:
Method:
Exhibit C - Instructions S: Ss hed uled A Equipmer.t Failure (Explain)
! Manual t'or Preparanon of Data Il Maintenance of Test 2 Manual Sciarn.
Entr> Shecis for Licensee C-Refueling 3-Autunutie Scrain.
Esent Repost i1.ERI File (NtlRI.G-D Regulator) Restriction 4-Ot her (1:xplain )
01611 E-Operator Training & License Examination F Adininistrative 5
G-Operational I iros t Explain)
Eshibit I Same Source s!77 )
. !!-Other ( thplain t
AVLR \\GL D \\lLY liNil POhER LEVEL DOCKL I NO.10-302 UNIT E1CRP-3 DATE 441/80 CO\\1PLE IED BY 11WCulvo r TELEPil0NE (904)795-6486 510NTil MARCH DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE D \\lLY POhER LEVEL ISIWe-Net )
( SIWE-Net i 1
0 17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 n
21 0
6 0
22 0
7 0
23
_._ _ _ 0 8
0 24 0
9 0
25 Q__
10 n
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSIRUCIlONS On tins format.hst the asera2e daily unit pou er lesel in.\\lWe Nel for each day in the reporting miinth. Compute to th nearest whole megawatt.
f sum 71 1
MONTilLY STATUS REPORT REFUELING INFORMATION REQUEST 1.
Name of Facility: Crystal River Unit 3 2.
Scheduled date of next refueling shutdown:
Currently shut down 3.
Scheduled date for restart following refueling: June, 1980 4.
Will refueling or resumption of operation thereafter requi re a technical specification change or other license amendment?
Yes.
In general, changes to the CR #3 technical specifications will include:
a.
Moderator Temperature Coefficient (3.1.1.3) b.
Control Rod Insertion Limits (3.1.3.6) c.
Control Rod Group Assig:,oents (3.1.3.7) d.
Axial Imbalance Limits (3.2.1) e.
Refueling Boron Concentration (3.9.1)
These specifications will be reviewed and changed as necessary based on the reactivity of the third cycle as compared to that of the second cycle.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information: April, 1980 6.
Important licensing considerations associated with refuel ing, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, or new operating procedures.
Florida Power Corporation is presently discussing with the NRC staff our intent to request that the power level of CR #3 be raised from the present level of 2452 MW (t) to the ultimate core power level of 2544 MW (t) as described in the CR #3 FSAR.
FPC submitted, on February 28, 1979, our reload report justifying Cycle 2 operation of CR #3 at 2544 MW (t).
On May 25, 1979, FPC modified its Cycle 2 reload report justifying continued operation of 2452 MW (t).
It is our intent to continue our discussions with the NRC in order to obtain the power upgrade during Cycle 3 operation.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
a.
177 assemblies b.
60 assemblies i
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or
[
is planned, in number of fuel assemblies.
i a.
Present storage capacity - Pool A - 120 plus 8 failed fuel assemblies.
Pool B - 120 plus 8 failed fuel assemblies.
Simpson(MSRpt)DN89
8.
(Continued) b.
Filed request on January 9,1978 with NRC concerning expansion of Pool A from 120 to 544 assemblies plus 6 failed fuel assemblies and expansion of Pool B from 120 to 609 assemblies. Expansion of Pool A is to occur after the refueling in March, 1980.
The Pool B expansion will occur at a later refueling outage (approximately 1986).
Additional detailed design information concerning on.- fuel pool I
expansion was submitted to the Commission on March 3 and March 28, 1978, January 18, 1979, March 16, 1979, June 29, 1979, September 5, 1979 and October 10, 1979.
1 9.
The projected date of the last refueling that can be discharged to the spent fuel assuming the present licensed capacity.
1981-1982 1
l l
l l
Simpson(MSRpt)DN89