ML19323A414

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/80-03,50-270/80-02 & 50-287/ 80-02 on 800114-24.No Noncompliance Noted
ML19323A414
Person / Time
Site: Oconee  
Issue date: 03/04/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19323A410 List:
References
NUDOCS 8004210195
Download: ML19323A414 (2)


See also: IR 05000269/1980003

Text

__ _________

___

c :s

(

i

'

\\~ 2

nni

[

UNITED STATES

8

hi

NUCLEAR REGULATORY COMMISSION

$

7[E

'

REGION il

o

101 MARIETTA ST., N.W.. CULT E 3100

g

ATLANTA, GEORGIA 30303

MAR

41980

In Reply Refer To:

RII:NE

50-269/80-3

50-270/80-2

50-287/80-2

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

'

Charlotte, NC 28242

Gentlemen:

'

This refers to the inspection conducted by N. Economes of this office on

January 14-24, 1980, of activities authorized by NRC Operating License Nos.

DPR-38, DPR-47 and DPR-55 for the Oconee facility, and to the discussion of our

findings held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of no'acompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will'be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard'within

the specified period, the report will be placed in the Public Document Room.

i

l

l

i

1

8004210 f N 5

1

I

.

.

'

.

Duke Power Company

-2-

,

!

Should you have any questions concernirg this letter, we will be glad to discuss

[

them with you.

Sincerely,

r e11

J.C.B/fInt,ActingChief

,

Reactor Construction and Engineering

Support Branch

Enclosure:

[

Inspection Report Nos. 50-269/80-3,

l

50-270/80-2 and 50-287/80-2

t

,

cc w/ enc 1:

J. E. Smith, Station Manager

P. O. Box 1175

'

Seneca, SC 29678

-

,

5

>

b

i

,

9

h

,

s

F

b

f

i

!

!

I

i

,

8e

e

-

-

-

.,7

,-- ,. -

+ -

r