Forwards IE Insp Rept 50-293/79-07 on 791009-10.No Noncompliance Noted
ML19323A390
Person / Time
Site: Pilgrim
Issue date: 02/28/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini C
BOSTON EDISON CO.
Shared Package
ML19323A391 List:
References
NUDOCS 8004210169
Download: ML19323A390 (2)


See also: IR 05000293/1979007

Text

Yk

.

.

p cg7

UNITED STATES

o

NtJCLEAR REGULATORY COMMiss!ON

3

o

REGION 1

5

$

631 PARK AVENUE

f

KING OF PRUS$1 A. PENNSYLVANIA 19406

\\

/

FE3 2 3 G30

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. G. Carl Andognini, Manager

Nuclear Operations Department

800 Boylston Street

Boston, Massachusetts

02199

Gentlemen:

Subject:

Inspection 50-293/79-07

This refers to the inspection conducted by Mr. L. H. Thonus of this office on

October 9-10, 1979 at Pilgrim Nuclear Power Station, Unit 1, Plymouth, Massachu-

setts of activities authorized by NRC License No. DPR-35 and to the discussions

of our findings held by Mr. Thonus with Mr. P. McGuire of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application nust be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

8 0 0 4 210tM

,

o

.

Boston Edison Company M/C Nuclear

2

FEB 2 8 MO

I

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

[)

'

Get rge H. Smith, Chief

Fuil

acility and Materials Safety

anch

Enclosure: Office of Inspection and Enforcement Inspection

,

Report Number 50-293/79-07

>

cc w/ enc 1:

'

P. J. McGuire, Pilgrim Station Manager

[

,

e