Revised Monthly Operating Rept for Feb 1980
ML19323A092
Person / Time
Site: North Anna 
Issue date: 04/01/1980
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19323A090 List:
References
NUDOCS 8004170212
Download: ML19323A092 (2)


Text

a-?

O C

4 4

/

?

f' i

VIRGINIA" ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT

(

MONTH Tebi-YEAR 1980 (Revised April 1, 1980)

SUEMITTED:

g SUPERINUJH)ENT - OPERATI0'NS APPROVED:

i f NAGER l

21 %

8 0 04170 ' '.Y-

c OPERATING DATA REPORT DOCKETNO. 50-338 DATE 4-1-80 COMPLETED BY W. R. Madison TELEPHONE /u,$-w 4-5151 OPERATING STATUS North Anna Unit 1 Notes

~

3, gg,3,,,,

2. Reporting Period: February 1980 (Revisedl
3. Licensed Thermal Power (MWt):

2775 947

4. Nameplate Rating (Gross MWe):
5. Design Elecmml Rating (Net MWe):

907 928

6. Maximum Dependable Capacey (Gross MWe):

898

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occurin Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Rans:

N/A

9. Power Level To Which Rosmeted,if Any (Net MWe):

N/A l

10. Reasons For Restrictions.lf Any:

N/A

.i k

This Month Yr to.Date Cumulative 696 1,440 15,-217 l

!!. Hours in Reportmg Period

12. Number Of Hours Reactor Was Critical 604.5 447 o 11_11 t 1 l
13. Reactor Reserve Shutdown Hours 7.0 37.0

'185.'3

{

595.9 798.7 10.851.9 l

14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours 0

0 _,

0

16. Gross Therma! Energy Generated (MWH) 1,483,418

'1,690,114 27.970.027__

l

17. Gross Electrical Energy Generated (MWH) 471,315 524.079 8.870.428
18. Net Elecmcal Energy Generated (MWH).

442,506 486.974 8.340.420

19. Unit Service Factor 85.6 55.5 71 c'4 85.6 55.5 71.3 i
20. Unit Amilability Facto,_

70.8 37.7 61.0

21. Unit Capocary Factor'(Using MDC Net)

N. I 3/.3 60.4

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 14.4 12.0 4.0
24. Shutdowns WM Over Next 6 Months (Type. Date, and Duration of Esch):

i N/A

25. If Shur Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

~

i INfTIA1. CRITICALITY

~

l INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)

?

.