Text

{{#Wiki_filter:_ _ _ _ _ _ O \\ l VIRGINIA' ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH March YEAR 1980 SUBMITTED: Y SUPERINTE.R@NT - OPERATIONS APPROVED: Q ER 8004170 E $$ -w

2 OPERATING DATA REPORT DOCKETNO. 50-338 DATE 9-4-du COMPLETED BY W. R. Madison TELEPHONE /03-W4-5151 l OPERATING STATUS i I

1. Unit Name: North Anna Unit 1 N'

g

2. Reporting Penod: March 1980
3. I te=*ad Thermal Power (MWt):

2775

4. Nameplate Rating (Grom MWe): _947 i

907 l

5. Demgn Elecencal Rating (Net MWe):

928

6. Maximum Dependable Capaczty (Grom MWe):

l

7. Maximum Dependable ('apac*y (Net MWe):

898

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Whaca Rastncted,If Any (Net MWe):

N/A N/A

10. Reasons For Restnctions.,1f Any:

h ~ This Month Yr to.Dats Canulative

11. Hours In Reporting Pened 744

?.184 15.461

12. Number Of Hours Ranctor Was Critical 744 1.691.9 11.R57 1
13. Reactor Reserve Shutdown Hours 0

37.0 185.3

14. Hour: Generator On Line 744 1.542.7 11.945 0 i
15. Unic Reserve Shutdown Hours 0

0 0 2,016,657 3,706,771 29.986.684

16. Gross Thermal Energy Genented (MWH)
17. Gross Electncal Energy Generated (MWH) 636.429 1.160.50R 4 506 R97
18. Net Elecencal Energy Generated (MWH).

601,060 1.088.034 8.941.480 j

19. Unit Semes Factor 100 70.6 72.7 100
20. Unit Availabday Factor 70.6 72.7 90.0 55.5 62.4
21. Unit Capacey Factor'(Using MDC Net) 89.1
22. Unit Capacay Ft stor (Using DER Net) 54.9 61.8
23. Unit Forced Outage Rate 0

6.6 3.8 l

24. Shutdowns Wint I Ovec Next 6 Months (Type. Date,and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • t.$,5_

i TAM Ik L, (9/77) N 'ti i

AVERAGE DAILY UNIT POWER LEVEL 50-338 f DOCKET NO. NA 1 g.g. DAE 4/1/80 COMPLETED BY W. R. Madison TELEPHONE J03) 894-5151 MONm March 1980 l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net) (MWe-Net) 1 830 775 37 832 261 2 18 3 830 g9 779 4 8 31 827 20 s 830 830 21 6 827 826 t 22 7 833 ) 23 826 8 835 24 828 9 833 25 830 to 831 y, 831 835 1I 27 830 12-806 831 28 g3 829 835 29 14 828 832 30 Is 830 830' 3 836 16 INSTRUCTIONS ~On this fonnatolist ihe average daily unit power levelin MWe. Net for each day in the reporting month. Com the nearest whole megawatt. (9/77) t

o .[t.

g.

?Y ~ g. 1.; DOCKET NO. 50-338 UNIT SilUTDOWNS AND POWER REDUCTION; UNIT NAME Nor:n Anna 1 4-8-00 I. DAu COMrl.ETED By A. G. Neufer _ jJ REPORT h.tONTil TELEPHONE March 1980 703-894-5151 ext. 288 b j -{oc .] g "i j j Licensee gg p cause A corrective i No. Date E g} Action to gg g Event g3 .c, N gg gg; gc Report #

  • U g

Preveal Recursence l l l 80-11 800317 NA NA A* NA NA NA NA Significant power reducticn of ' >20% of the average daily power L level. -I

i I

i' ? i l ~ l I k i I 2 3 4 F: Forced Reason: Method: Exhible G. instructisms i' 5: Sclieduled A. Equipment Failure (Emplain), l Mamsel for Psepneellem of Data ,l-D. Mal..icnance of Test

2. Manual 5crem.

Enity Sheels fos i.lcensee h I; C. Refueling 3.Aulomalle Scism. Event Repost (i.ER)l:lle (NUREG-D. Regulatory Restilethm 4Ohes (Explain) 0161) E Operator Training & IJcense Emendnethm l

  • ll F Asiministisilve 5

G.Operallunal Ensus (Emplain) Enliable 1 Ssene Simece (9/77) II-Ollies (Emplain)

  • See attached sheet.

,I . W ;- PIgn 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH MARCH UNIT NAME North Anna 1-YEAR 1980 DATE: 4-1-80 COMPLETED BY A. G. Neufe-g 80-11(A) 3/17/80 time 2100 ramped unit down to 250 MWE 33% power due to arcing the 500 KV bus disconnects and generator out put disconnects located in the station switchyard G-108, G56804, G-102 and G-105. At 2343 maintenance was completed in the switchyard, however, the unit was held at approximately 30% power until 3/18/80 at 1745 due to high steam generator cation conductivity. The unit was held at less than full power until 0620 3-19-80 due to unstable steam generator conductivity and an oil leak on "A" feed pump. i 6 b r r = .s s-s

  • ~

.i l .}}