{{#Wiki_filter:_ _ _ _ _ _ O \\ l VIRGINIA' ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH March YEAR 1980 SUBMITTED: Y SUPERINTE.R@NT - OPERATIONS APPROVED: Q ER 8004170 E $$ -w
2 OPERATING DATA REPORT DOCKETNO. 50-338 DATE 9-4-du COMPLETED BY W. R. Madison TELEPHONE /03-W4-5151 l OPERATING STATUS i I
- 1. Unit Name: North Anna Unit 1 N'
g
- 2. Reporting Penod: March 1980
- 3. I te=*ad Thermal Power (MWt):
2775
- 4. Nameplate Rating (Grom MWe): _947 i
907 l
- 5. Demgn Elecencal Rating (Net MWe):
928
- 6. Maximum Dependable Capaczty (Grom MWe):
l
- 7. Maximum Dependable ('apac*y (Net MWe):
898
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Whaca Rastncted,If Any (Net MWe):
N/A N/A
- 10. Reasons For Restnctions.,1f Any:
h ~ This Month Yr to.Dats Canulative
- 11. Hours In Reporting Pened 744
?.184 15.461
- 12. Number Of Hours Ranctor Was Critical 744 1.691.9 11.R57 1
- 13. Reactor Reserve Shutdown Hours 0
37.0 185.3
- 14. Hour: Generator On Line 744 1.542.7 11.945 0 i
- 15. Unic Reserve Shutdown Hours 0
0 0 2,016,657 3,706,771 29.986.684
- 16. Gross Thermal Energy Genented (MWH)
- 17. Gross Electncal Energy Generated (MWH) 636.429 1.160.50R 4 506 R97
- 18. Net Elecencal Energy Generated (MWH).
601,060 1.088.034 8.941.480 j
- 19. Unit Semes Factor 100 70.6 72.7 100
- 20. Unit Availabday Factor 70.6 72.7 90.0 55.5 62.4
- 21. Unit Capacey Factor'(Using MDC Net) 89.1
- 22. Unit Capacay Ft stor (Using DER Net) 54.9 61.8
- 23. Unit Forced Outage Rate 0
6.6 3.8 l
- 24. Shutdowns Wint I Ovec Next 6 Months (Type. Date,and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- t.$,5_
i TAM Ik L, (9/77) N 'ti i
AVERAGE DAILY UNIT POWER LEVEL 50-338 f DOCKET NO. NA 1 g.g. DAE 4/1/80 COMPLETED BY W. R. Madison TELEPHONE J03) 894-5151 MONm March 1980 l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe. Net) (MWe-Net) 1 830 775 37 832 261 2 18 3 830 g9 779 4 8 31 827 20 s 830 830 21 6 827 826 t 22 7 833 ) 23 826 8 835 24 828 9 833 25 830 to 831 y, 831 835 1I 27 830 12-806 831 28 g3 829 835 29 14 828 832 30 Is 830 830' 3 836 16 INSTRUCTIONS ~On this fonnatolist ihe average daily unit power levelin MWe. Net for each day in the reporting month. Com the nearest whole megawatt. (9/77) t
o .[t.
- g.
?Y ~ g. 1.; DOCKET NO. 50-338 UNIT SilUTDOWNS AND POWER REDUCTION; UNIT NAME Nor:n Anna 1 4-8-00 I. DAu COMrl.ETED By A. G. Neufer _ jJ REPORT h.tONTil TELEPHONE March 1980 703-894-5151 ext. 288 b j -{oc .] g "i j j Licensee gg p cause A corrective i No. Date E g} Action to gg g Event g3 .c, N gg gg; gc Report #
- U g
Preveal Recursence l l l 80-11 800317 NA NA A* NA NA NA NA Significant power reducticn of ' >20% of the average daily power L level. -I
- i I
i' ? i l ~ l I k i I 2 3 4 F: Forced Reason: Method: Exhible G. instructisms i' 5: Sclieduled A. Equipment Failure (Emplain), l Mamsel for Psepneellem of Data ,l-D. Mal..icnance of Test
- 2. Manual 5crem.
Enity Sheels fos i.lcensee h I; C. Refueling 3.Aulomalle Scism. Event Repost (i.ER)l:lle (NUREG-D. Regulatory Restilethm 4Ohes (Explain) 0161) E Operator Training & IJcense Emendnethm l
- ll F Asiministisilve 5
G.Operallunal Ensus (Emplain) Enliable 1 Ssene Simece (9/77) II-Ollies (Emplain)
- See attached sheet.
,I . W ;- PIgn 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH MARCH UNIT NAME North Anna 1-YEAR 1980 DATE: 4-1-80 COMPLETED BY A. G. Neufe-g 80-11(A) 3/17/80 time 2100 ramped unit down to 250 MWE 33% power due to arcing the 500 KV bus disconnects and generator out put disconnects located in the station switchyard G-108, G56804, G-102 and G-105. At 2343 maintenance was completed in the switchyard, however, the unit was held at approximately 30% power until 3/18/80 at 1745 due to high steam generator cation conductivity. The unit was held at less than full power until 0620 3-19-80 due to unstable steam generator conductivity and an oil leak on "A" feed pump. i 6 b r r = .s s-s
- ~