ML19322E738
| ML19322E738 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/21/1980 |
| From: | Bryant J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19322E737 | List: |
| References | |
| NUDOCS 8004020188 | |
| Download: ML19322E738 (2) | |
See also: IR 05000424/1980001
Text
- -
-
--
_
.
i
b
/^\\ pa neoug'o
d#
UNITED STATES
8
~g
NUCLEAR REGULATORY COMMISSION
o
$
.E
REGION 11
'
% * * * * * e'['
0,
101 MARIETTA ST., N.W., SulTE 3100
ATLANTA, G EORGI A 30303
FEB 21198C
In Reply Refer To:
RII:CRM
50-424/80-1
50-425/80-1
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
-
This refers to the inspection conducted by C. R. McFarland of this office on
January 30 - February 1,1980, of activities authorized by i1C Construction
Permit Nos. CPPR-108 and CPPR-109 for the Vogtle facility, and to the discussion
of our findings held with H. H. Gregory, III at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full scatement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
8004020lSII
--
.
-
-
._
_.
- - .- -. . _ _
._
-.
-
-
-_-.
_ . - . .
.
,
,
I
~
Georgia Power Company
-2-
.
'I
Should you have any questions concerning this letter, we will be glad to discuss
,
them with you.
.
l
Sincerely,
a
m
J.
yant, Acting Chief
.
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-424/80-1
and 50-425/80-1
cc w/ enc 1:
K. M. Gillespie,
4
Construction Project Manager
f
P. O. Box 282
Waynesboro, GA 30830
E. D. Groover
QA Site Supervisor
P. O. Box 282
Waynesboro, GA 30830
D. E. Dutton
Project General Manager
Georgia Power Company
Post Office Box 4545
Atlanta, GA 30303
,
e
'
1
w.
1
- - - - - , - - - -
-
,
n
-
-
-
-,.n.