Notification of 800317 Meeting W/ Util in Bethesda,Md Re 800226 Incident
ML19322E207
Person / Time
Site: Crystal River 
Issue date: 03/10/1980
From: Fairtile M
Office of Nuclear Reactor Regulation
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 8003260286
Download: ML19322E207 (3)


Text

_-

jare49 gb.

k UNITED STATES p,

NUCLEAR REGULATORY COMMISSION 5f

,j WASHINGTON, D. C. 20555

% n... p March 10,1980 Docket No. 50-302 MEMORANDUM FOR:

Robert W. Reid, Chief, Operating Reactors Branch #4, 00R FROM:

M. B. Fairtile, Project Manager, Operating Reactors Branch #4, D0R

SUBJECT:

FORTHCOMING MEETING WITH FLORIDA POWER CORPORATION (FPC) ON CRYSTAL RIVER 3 INCIDENT OF FEBRUARY 26, 1980 Date & Time:

March 17, 1980 9:00 a.m.

Location:

Holiday Inn Bethesda, Maryland

Purpose:

FPC. response to NRC letter of March 6,190s.

Enclosure 3 to that letter, attached, is the agenda.

Participants:

NRC Office of Nuclear Reactor Regulation Office of Inspection and Enforcement LICENSEE Florida Power Corporation

~

/

M. B. Fairtile, Project Manager Operating Reactors Branch #4 Division of Operating Reactors

Enclosure:

As stated j

l

Infonmation requested by COB, March 12 and March 1"/,1980-1.

Summarize power upset events on NNI/ICS that have previously occurred at your plant.

2.

Specifically review the Crystal River event, and address your plant's susceptibility to it in general.

3.

Set forth the information presented by your representative (s) in the meeting on March 4,1980.

4.

Address information available to the operator following various NNI/ICS power upset events, including a discussion of:

- how the operator determines whitt. information is reliable

- what information is needed to bring the plant to cold shutdown j

5.

Address the feasibility of performing a test to verify reliable information that remains following various NNI/ICS power upsets.

j 6.

Address each CR-3 proposed corrective action in terms of applicability to your plant.

7.

Expand your review under IE Bulletin 79-27 to include the implications of the CR-3 event.. Inform us of your schedule.for completion of this expanded review as discussed on March 4,1980.

In addition to the above, Florida Power Corporation should address:

, 1.

Sequence of events for the CR-3 trip.

2.

Proposed corrective actions at CR-3.

3.

Discuss the impact, whether it be beneficial or detrimental, of NRC Short Term Lessons Learned and Bulletins and Orders requirements.

I e.,

s,aw w

-gmaye mp-em- *- e - *

  • e*M NA*

6-e w -

(...

l.....

=

MEETING HOTICE DISTRfBUTION

+===

ORB #4

>=

ff:""

=EM=E Docket File W. Gammill

=

~ NRC PDR~

L. Shao

....g:;;;.

L PDR J. Miller, D0R ORB #4 Rdg P. T. Kuo (seismic reviews only)

~ ~ ~ ~

NRR Rdg H. Gaut, State Programs H. Denton AEOD E. G. Case

=

D. Eisenhut

=r R. Vollmer

==-

W. Russell B. Grimes T. J. Carter A. Schwencer

"""=
0. Ziemann F --.-

T. Ippolito Ii:9 R. Reid D

V. Noonan P. Check G. Lainas

==

G. Knighton Project Manager

'7 OELD OI&E(3)

OSD S. Showe, I&E (PWR) kNmm R. Ingram

.z :"

Receptionist, Bethesda

==fi R. Fraley, ACRS (16)

~ ~

Program Support Branch

...... =

TERA

"" :~.:..F

'O >

C d,_Buchaiii D 2 Meeting Notice File

==

NRC Participants

j =

R. Capra, B&O I..?

ii.==

.e e...H.l

.' 1 _.. ' *..

^

=:::.

]:~=

h..

..C

'I....'..

U

  • ^

<c.. n.

- -