ML19322C151

From kanterella
Jump to navigation Jump to search
Forwards RO-287/76-09
Date released: 12/02/2019 Download: ML19322C151


RO-287/76-09:on 760713,power Increase Exceeded Power Level Cutoff During Feedwater Transient.Caused by Feedwater Demand Decrease.Induced Oscillation Resulted in Increased Flow & Temp Decrease.Manual Control Reduced Power
ML19322C155
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/27/1976
From:
DUKE POWER CO.
To:
References
Download: ML19322C155 (2)
Forwards RO-287/76-09
ML19322C150
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 07/27/1976
From: Parker W
DUKE POWER CO.
To: MOSELEY N C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19322C150 (2)