Transfers Lead Responsibility for Evaluation & Resolution of Flooding of Turbine Bldg Problem from IE to Div of Operating Reactors
ML19322C102
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/06/1976
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Goller K
Office of Nuclear Reactor Regulation
Shared Package
ML19322C104 List:
References
IE-RID-76-25, NUDOCS 7912300086
Download: ML19322C102 (2)


Text

"

(/fpl' 1

b ***

DEC 6 1976 Serini Go..:

IE-RID _-76-25 TRidSITR Or LEAD ICSPONSIBILITY I

I l

To.

Karl R. Coller, Assistant Director for Operating T.eactors, NRR

Subject:

FLOODIHG OF T JUT 'E BUILDIEG AT OCOJEE L' NITS NCS.

1, 2 & 3 bOCC:T LOS.60-269 50-270 and 50-287 Reaponsible Branch Chief: Earl V. Seyfrit Deecription of Iten Eequiring lesolution:

I Da Oct cher 9,1976, flooding occurred in the turbino building. Unit No. 3 was chut down for refueling. Tae Unit Mo. 3 condenser had five manways open for maintenance.

Tne incident occurred when the cloctrical supply to tho air controllers on tite six 78-inch condenser outlet valves was lest. This caused the valves to attecpt to open. Que of the six strongbacks, installed on the valves as a aufety manaure, failed and one 78-inch valve opened. Ine laka water back-f1 wad throurja the open mauways until electrical power uas rastored 32 ninutes later, and tite open valve vaa closed. The water care within five inches of flowing over the curos 2 at the entrances to the auxilicry building. Turther l

flooding could nave rendered the high pressure f njection, low pressure injaction, l

contain tent spray and all sources of water to the uteam generators for all i

units inoperabla. Tae turbine and auxiliary buildings are corcon to all units.

I l

Eo poscibility c::ists for en incident which could cause rore severe flooding from rupture of a pipe downstrea:n of the 76-inch condeuser valve in the turbine building or failure of the valve bcucings.- Anotner possibility is

}

rupture of the condenser which could da= age the outlet valves adjacent to i

the condenser. A seismic event could cause such a failure.

hacorsendations and Proposed Course of Action:

1.

The Division of Operating:Eeactop (DOR) will ' review the flooding incident and detaruine if the licensee's proposed rourse of action is appropriate.

l

.60-24y M 4 l

7912300 Q M

" ~

s

i i

i Karl E. coller DEC 6 1976

,% At e conclukign of the re ew, DOR v otify th Offica Inspec ion and Eh'orcevent (

of their ra ts.

I here is need for ad' ional inf tion or ne require:aenta e to L imposed a I

the licen both tta licensee an IE vill be a advise

h. IE vill provida additional inforcation as required and verify adherence I

to any uwv requirements irposed by DOR.

Concurrence:

Boyca H. Crier, Lirector, Division of Reactor Inspection Prograrg, IE Date Karl h. Goller. / assistant isirector for Operating Reactors, ERR Date Enclosures 1.

Harorsadu= frou F. J. Long to K. V. Seyfrit dated October 29, 1976, 2.

Licensee Event keport RO 287/76-18 dated October 25, 1976.

l cc:

V. Stallo, OP.

l A. Schwencer, OR i

D. J. Neighbors, OR I

D. Thoceson IE C. W. Rainmuth, IE l

st d ution:

K. V. Seyfrit, IE IE Files l

J. H. Sniezek, IE Central Files (3) l C. W. q,,H IE Reading J. P. O'Leilly, IE:I RIP Reading M. C. Eosaley, IE:II BH Grier J. C. Keppler, IE:III 1

JA Dyer E. H. Howard, IE IV R*IAB hading j

R. H. Engelkan, IE:V T. Abell, HIPC i

H. K. Shspar, ELD I

i i

F21244H1 RIP-984 or sc = *

.. RIP :RTAB -- -RIP 2IAB

-RIP

-DOR i

j su===="*

-JA -Dyer -cd - -KV-Seyfrit--

BH Grier KR Coller--

I

-11/

/76- -11/

/76

-11/

176

~11I

/76-Toren AEC-)l3 (Rev. 9-53) AECM 0240

  1. u. s. novan=mesmet pae= Team orrects ser..sae.noe

t/);;;va na.w _

.I

/

000 1976 Karl R. Golier

/

IT will provide additional information as required and verify adherence A

ny new requirements imposed by DOR.

2 c

' L'J t

J l

Concurrence,:

J t IE Date Boyce H. Grier, Director, Division of Reactor Inspection Programs,

?(

1 Date E*4 Karl R. Goller, Assistant Director for Operating Reactors, DDR 1

q,j i<

w i:. '

29, 1976 Memorandum from F. J. Long to K. V. Seyfrit dated October

Enclosures:

Licensee Event Report RO 287/76-18 dated October 25, 1976 1.

2.

V. Stello, OR cc:

A. Schwencer, OR D. J. Neighbors, OR D. Thompson, IE G. W. Reinmuth, IE 5

K. V. Seyfrit, IE J. H. Sniezek, IE G. W. Roy, IE J. P. O'Reilly, IE:I N. C. Mosely, IE:II J. G. Keppler, IE:III E. M. Howard, IE:IV R. H. Engelken, IE:V i

T. Abell, MIPC H. K. Shapar, ELD s

SEE PREVIOUS YELLOW FOR CONCURRENCES RIP:RTAB RIP:RTAB RIP 00R JA0yer KVSeyfrit BHGrier KRGoller 1

11/29/76 11/ /76 11/ /76 11/ /76

~

g/)

7.,m,-

_y

. y. 3.,g.y.

N e.-.v

>U!'

\\

.. -;s

\\

\\

ew

. 'y'

\\

dk,

m