ML19322C009

From kanterella
Jump to navigation Jump to search
Requests Completion Schedule for Electrical & Instrumentation Drawing Review
ML19322C009
Person / Time
Site: Oconee 
Issue date: 02/09/1970
From: Long C
US ATOMIC ENERGY COMMISSION (AEC)
To: Deyoung R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19322C007 List:
References
NUDOCS 7912200727
Download: ML19322C009 (1)


Text

n

/

A--C-~ r, l' 4[

]th,,M UNITED STATES

~)~ * > h'

[5 (

ATOMIC ENERGY COMMISSION L'

2 3' '

WASHINGTON, D.C. 20545 -

~

C

% r in o '#

FEB 9 - 15 0 e o

- Richard C. DeYoung, Deputy Assistant Director for Reaccor. Technology, Division of Reactor Licensing THRU:

Roger S. Boyd, Assistant Director for Reactor Proj>cte, D.g)si' of Reactor Licensing OCONEE ELECTRICAL AND INSTRUMENTATION DRAWING REVIEW At the request of the I & PT Branch, Duke Power Company and B&W informally provided Projects Branch No. 3 with Oconee RPS, ESF, and electrical systems drawings. These were received in the I & PT Branch January 12, 1970.

Please provide Projects with a schedule for completion of your review of these drawings including tentative meeting. dates with Duke to discuss your concerns.

=.

h

  1. l. !/ '
  • C. G. Long, ' hie f Reactor Projects Branch No. 3 Division of Reactor Licensing cc:

B. Grimes C. G. Long A. Schwencer 7 912 2007R7

.