ML19322B811
| ML19322B811 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/29/1977 |
| From: | Volgenau E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Horn C DUKE POWER CO. |
| Shared Package | |
| ML19322B778 | List: |
| References | |
| NUDOCS 7912050796 | |
| Download: ML19322B811 (5) | |
Text
.
O e
)
h APPENDIX 3 NOTICE OF PROPOSED IMPOSITION OF CIVIL PENALTIES
--LicensadMsd DPR-38
-- Duke Power Company ATTN:
Mr. Carl Horn,.Tr.
DPR-47 President DPR-55 P..O. Box 2178 Docket Nos.:
50-269 Charlotte, North Carolina 28242 50-270 50-287 Gentlemen:
This office proposes to impose civil penalties pursuant to Section 234 of the Atomic Energy Act of 1954, as amended, (42 USC 2282) and to 10 CFR 2.205 in the cu=ulative anount of Twenty One Thousand Five Hundred Dollars ($21,500) for the specific items of noncompliance set forth in Appendix A to the cover letter.
In proposing to i= pose civil penalties pursuant to this section of the Act and in fixing the proposed amount of the penalties, the f actors identified in the statements of consideration published in the Federal Register with the rule =aking action which adopted 10 CFR 20.205 (36 FR 16894) August 26, 1971, have been taken into account.
You say, within twenty (20) days of the date of receipt of this notice, pay the civil penalties in the cu=ulative a=ount of Twenty One Thou-sand Five Hundred Dollars (521,500) or you may protest the i= position of the civil penalties in whole or in part by a written answer.
Should you fail to answer within the ti=e specified, this office vill issue an order i= posing the civil penalities in the a=ount proposed above.
Should you elect to file an answer protesting the civil penalties, such answer =ay (a) deny the items of noncompliance lis ed in the Notice of Violation in whole or in part, (b) demonstrate exrenuating circumstances, (c) show error in the Notice of Violation, or (d) show other reasons why the penalties should not be imposed.
In addition to protesting the civil penalties in whole or in part, such answer may request remission or mitigation of the penalties.
Any written answer in accordance with 10 CFR 2.205 should be set forth separately from your statement or explanation in raply pursuant to 10 CFR 2.201, but you may incorporate by specific reference (e.g.,
giving page and paragraph numbers to avoid repetition).
Your attention is directed to the other provisions of 10 CFR 2.205 regarding, in particular, failure to answer and ensuing orders; answer, consideration by this office, and ensuing orders; requests for hearings, hearings and ensuing orders; compromise; and collaction.
WGlQ f9120507 %
e A
Appendix 3 -
Upon failure to pay any etvil penalty due which has been subsequently determined in accordance rich the applicable provisions.of' 10 CFR
- ~
2.205, the matter may be referred to the Attorney Ge ral, and the
" ^
penalty, unless compromised, remitted, or mitigated, m.ty be collected by civil action pursuant to Section 234c of the Atomic Energy Act of 1954, as amended, (42.USC 2282).
FOR THE NUCLEAR REGULATORY COMMISSION t
l f,/j,c pp Ernst Volgenau j Director Offica of Inspection and Enforcement Dated this !?
day of
'e 1977 at Bethesda, Maryland w
e G
j l
A3FCN b e-6 m
-=
==.. -----
. MAR' ? 91977 APPENDIX C
s ENFORCEE.I HISTORY RELATED TO RADIATION SAFETY Duke Power Company License Nos.
DPR-38 h-
'DPR-47' Oconee Nuclear Station DPR-55 Docket Nos.:
50-269 50-270 50-287 Noncompliance During Period from January 1974 to Januarv 1977 Inspection Dates on Which 4
_ _ _ _ Requirements Noncompliance Was iound J
l.
20.201, " Surveys" January 1974 February 1976 January 1977 2.
Technical Specification 3.9.3, January 1977 Instantaneous Liquid Waste Discharge Concentration 3.
Technical Specification 3.9.5, January 1977 Coordinate Liquid Waste Discharges with Keowee Hydro Plant 4.
Technical Specification 3.9.4, January 1977 Process Liquids When 1.25 Curies per Quarter is Exceeded
-5.
Tecnuical Specification 6.4.1, February - March 1974 Provide Detailed App. roved January 1977 Procedures 6.
Technical Specification 6.4.1, January 1974 Follow Procedures May 1975 October 1976 January 1977 7.
Technical Specificacion 6.6.2.1, January 1977 Report Within 24 Hours 8.
Technical Specification 6.5.2, January 1974 Racords Prepared and Maintained for Six Years 1
O
\\
---~-
' ~ ~
~'P" j
MAR 2 91977 2-Appendix C
~
}
Inspection Dates on hiich Noncompliance Was Found Reauirements 9.
10 CFR 20.203, " Caution signs, March 1974 labels, signals and controls" May 1975 October 1976 10.
10 CFR 50, Appendix 3, Criterion r/I, March 1974
" Corrective Action" 11.
10 CFR 50, Appendix 3, Criterion III, March 1974
" Control of Measuring and Test Equipment" 12.
10 CFR 50, Appendix 3, Criterion VI, Mr.rch 1974
" Document Control"
- 13. Technical Specification 3.10.7, March 1974 Continuously Monitor Unit Vent Discharges 14.
10 CFR 50, Appendix 3, Criterion V, March 1974
" Instructions, Procedures and Drawings"
- 15. Technical Specification 3.10.5.c, March 1974 Coordinate Gas Releases With Meteorological Conditions
- 16. Technical Specification 6.1.2.2.h, March 1974 Contene of Nuclear Safety Review
- Con:mittee Meeting Minutes 17.
10 CFR 19, "?osting of notices to March 1974 workers" April 1975 18.
30.41, "Transf er of 3yproduct May 1974 Material"
- 19. Technical Specification 6.6.2.1.a, May 1974 Report Abnor=al Occurrences N
o' m
-~~-
n e
MAR 291977 3-Appendix C
)
. Inspection Dates on Which Requirements
~~ Noncompliance Was Found
)
- 20. Technical Specification 3.9.8, July 1974 Sample and Analyze Liquid Wasta
- 21. Technical Specification 6.6.1.3.e(6)(a)4, October 1974 Report Environnental Data in Semiannual Report
- 22. Technical Specification 4.11.1, October 1974 1
Collect and Process Environmental February 1976 Samples
- 23. Technical Soecification 4.11.1, October 1974 Measure Environ::lental Radiation Levels with TLD's 24.
20.103, " Exposure of individuals January 1975 to concentrations of radioactive materials in restricted areas" 25.
19.13, " Notifications and reports January 1975 to individuals" 26.
20.401, " Records of surveys, January 1975 radiation nonitoring and disposal"
- 27. Technical Specification 3.9.7, February 1975 Liquid Effluent Monitor February 1976 Isolation Function 28.
10 CFR 50, Appendix 3, criterion II, April 1975
" Quality Assurance P cgram"
- 29. Technical Specification 3.9.6, February 1976 Compare Monitor Reading to Laboratory Analysis
- 30. Technical Specification 4.16, August - September 1976 Leak Test Sealed Sources
_