ML19322B789
| ML19322B789 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/14/1976 |
| From: | Parker W DUKE POWER CO. |
| To: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19322B762 | List: |
| References | |
| NUDOCS 7912050779 | |
| Download: ML19322B789 (1) | |
Text
_ _ _ _ _ _
DUKE POWER COMPANY Powra Buttonwo 422 Sourn Ciruncis Sruzzr, Gnuat.ortz, N. C. 2a24a,
WILLIAM O. PA R M E R, J R.
TELgewoNt; AntA 704 Vict Pats otut 373-4083 se tae. PmOOwCTio%
May 14, 1976 Mr. Norman C. Moseley, Director U. S. Nuclear Regulatory Commission Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 Re:
IE:II:TNE 50-269/76-2 50-270/76-2 50-287/76-2
Dear Mr. Moseley:
1 My letter dated April 8, 1976 responded to OIE Inspection Report 50-269,
-270, -287/76-2. Item I.A.1 stated that high background readings seen on diation monitors RIA-33 and RIA-34 presently precluded a correlation of laboratory results and expected monitor readings.
In the interim until these background effects can be eliminated, beginning June 1, 1976, a redundant valve lineup check of the ef fluent pathway will be performed prior to each liquid effluent release.
In addition, a redundant sample and gross beta analysis will be performed prior to each liquid effluent release.
With regard to item I.A.3 concerning the interim waste build'ng vent gas monitor RIA-52, a daily check is being conducted to assure ins operability until the station modification providing an alarm is completed.
V y truly yours,
/
/
fN a.tL Lb. O William O. Parker, Jr.
MST:mmb 7912050779 i
i
,