ML19322B652

From kanterella
Jump to navigation Jump to search
Discusses Insp Repts 50-269/77-20,50-270/77-20 & 50-287/77-20 on 770830-0902 & Notice of Violation
ML19322B652
Person / Time
Site: Oconee  
Issue date: 10/05/1977
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19322B643 List:
References
NUDOCS 7912040678
Download: ML19322B652 (2)


See also: IR 05000269/1977020

Text

_.

_ _ _

_

.

. .

..

~

,

)

km "f Gg

UNITEo STATES

    • ,4

o

NUCLEAR REGULATORY COMM:SSION

  • j[, g

2

,(

R EGloN ll

{,g

g

230 PE ACHTREE STR EET, N.W. SUITE 1217

f

%.% l' }

ATLANTA, GEORGIA 30303

o

....

OCT

5 1977

In Reply Refer To:

RII:CEA

50-269/77-20

50-270/77-20

. 50-287/77-20

'

.

l

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

422 South Church Street

Charlotte, North Carolina

28242

.

Gentlemen:

This refers to the inspection conducted by Mr. C. E. Alderson of this

office on August 30 - September 2, 1977, of activities authorized by NRC

Operating License Nos. DPR-38,- DPR-47 and DPR-55 for the Oconee Unit 1,

2 and 3 facilities, and to the discussion of our findings held with

Mr. J. E. Smith at the conclusion of the inspection.

~

Areas examined during,the inspection and our findings are discussed in

-

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

During the inspection, it was found that certai. activities under your

license appear to be in noncompliance.with NRC taquirements. This item

and references to pertinent requirements are listed in the enclosed

Notice of Violation. This notice is sent to you pursuant to the provi-

sions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations. Section 2.201 requires you to submit to

,

this office, within 20 days of your ' receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which

have beep taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further noncumpliance; and (3).the date

when full comp'. lance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

'

and the enclosed inspection. report will be placed in the NRC's Public

Document Room. If this report contains any information that you for

your contractor) believe to be proprietary, it is necessary that you

Y9120 0(7h

.

. . - .

- - - - ..

. . - - . .

._.

.

..--

.

. . . - .

. - - - .

.-

.

-

.

-

COI

~:ry

'

.

..

_

%

(

Duke Power Company

-2-

>

.

.

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report.will be placed in the

Public Document Room.

Should you have any quu tions concerning this letter, we will be glad

to discuss them with you.

Very truly yours,

'

-g

w

F. J. Long, Chief

Reactor Operatons and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

RII Inspection Report Nos.

~

50-269/77-20

50-270/77-20

.

50-287/77-20

cc:

Mr. J. E. Smith, Station Manager

Oconee Nuclear Plant

P. O. Box 1175

-

Seneca, S. C.

29678

.'

e

+

.

.

I

-

,

i

.

._ _