ML19322B596

From kanterella
Jump to navigation Jump to search
Requests Util Review Inservice Insp Requirements to Determine Whether They Require Discharging Fuel & Review of Schedule for Performing Insp in View of Proposed Fuel Storage Capability
ML19322B596
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/09/1976
From: Purple R
Office of Nuclear Reactor Regulation
To: Parker W
DUKE POWER CO.
References
NUDOCS 7912040624
Download: ML19322B596 (2)


Text

e b

1 February 9, 1976 DISTRIUTION l

Docket File (3) JRbuchanan Docket Nos. 50-269 NRC PDR(3)

DEisenhut 50-270 Local PDR VStello and 50-267 ORB #1 Reading KRGoller TJCarter Duke Power Company RAPurple GZech ATTh:

Mr. William u. Paracer, Jr.

Vice President SMSheppard l

Ste4o Production gotmere OELD Fost Office box 2176 i

422 South Cnurch Street OISE (3)

EAEREXI Cnarlotte, Nortn Carolina 23242 ACRS (16)

TBAberanthy ML:

UColEE MUCLEAR STATI'04, UNITS 1, 2, AllD 3 j

As you undoubtedly Know the current shortage of offsite fuel storago space and fuel reprocessing capability has curtailed the ability of some opera i

reaccor facilities to ship spent fuel to an offsite location.

i situation will probably continue to exist for several more years.

Inia available onsite storage space is used up, more facili Consequently, l

adequate capacity to discharge a full reactor core to the storage pool i

j ine capability to discharge a full core from the reactor vessel to th pool la considered to be an operational consideration ratner han a safe e storade problem.

iiowever, it should be noted that in some facilities, complete core unloading may be necesaary to perfors soac of the required reactor cool l

syatca inservice inspectiont..

.at j

coula ;;reclude compliance witn taese inspection requireacnts a operation.

We su;; eat that you review the inservice inspection requirements i discharging fuel, ana review your schedule for perform n the NhC require la view of your projected fuel storage capability.

nspections current inservice inspection schedules cannot be acco:sodated within you projected ability to disenurre fuel, you saould consider advancing your r

inspection scnedules accordingly or taxing otuer action to alleviate the proolea.

i l

aincerely O

Original signed by:

D j

Robert A. Purple h

[

i iiobert A. Purple, Chief Operating iteactors branch #1 Division of Operating heactors c.Wc : See next..ptc,e,_0RB#1 ORB #g ORil K GZech:

" JWetmor

~

Purpl6

_.2/5/76...

2Y/1/76_..

2/1/76...

s.......-.-...............,.._.._.

Y912040h$ -

Duk2 Power Company February 9, 1976 t

cc:

Mr. William L. Porter 3

Duke Power Company 1

P. O. Box 2178 422' South Church Street Charlotte, North Carolina 28242

{D

}

Mr. Troy B. Conner 0

9 Conner G Knotts 1747 Pennsylvania Avenue, NW Washington, D. C.

20006 Oconee Public Library 201 South Spring Street Walhalla, South Carolina 29691 G

1 I

1 l

{

\\

)

-