ML19322A912
| ML19322A912 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 07/01/1975 |
| From: | Goller K NRC OFFICE OF STANDARDS DEVELOPMENT |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19322A913 | List: |
| References | |
| NUDOCS 7911270672 | |
| Download: ML19322A912 (4) | |
Text
,
e-
?
Dock'dt Nos.
\\
269.
50-270 &
l i
to JUL1 1975
\\
Duke Power Company-.
~
Hr. William O.~ Parker, Jr.
~
ATTN!
9, s
Vice President '
Steam Production Post Office box 2178
~~
422 South Church Street Charlot te, North Carolina 26201 Centlement
,. ~-
It is a~ continuing objective of the'.
+
'piovide complete, prompt ' reviews of' alli' Nuclear Regulat'ory Commission
.c
- 3: M.
S operating license' o,'
a applications ' for'l'const fuction~ p5rmits 7 s and liceise amendment's.
act, upon s'uch applications {is,E to a 'laig'e extent 'a f Thi' length of" time' necessaritoX- _
completeness of the informatlon~ supplied b'y th'e licens unction'of the ~^"D'
^
application.
Conpleteness is particularly impo' rtant fo eeiin support "of its I
amendments that f
sed license -
wide range of proposed technical'specificatlon ch and approved before the facility can return to o ange" that must be developed ~
~
developed preliminary guidance (Enclosure 1)' f perati a.
The NRC has:
license amendments that relate to refuelinis th tor u'se in preparing'propos, your submitt&ls will include all required informatiomay help to assure that.
a -
n.1
~
Another related problem 'is that, of'leteness.* % - i : '._
L cake it dif ficult and sometimes impossible ~ fdr theof licensee _sulbm
~
Ihis problem becomes particularly difficult fo ' IIrevie
~
~.
~
umption of' operation ?,-
relate to refuelings that~ involve an extensive'numbcense amendments that' r
~
' specification changes.
requesting such license amendments is taxing the atMoreover, the er of technical-adequate time for review. -accoescodate individual schedules, unless the re aff's ability to y J,.
~
t esT'~~
[c uests are submitted with:i 9 Ifcense amendments thatIn order to improve the etficacy and'schedulin
~...
'q, ; 7 ;
L'~
j g of our' reviews ~of prop ~ osed:.
.~y relate to refuelings we' have prepared a list of fth inforniation that we need to forecast
]
(Refueling Information Re@est, Enclosurel2) 'C?l i
~
the 'requireinents for such' reviews ^
e
~ ~ for your Oconee Fuclear Station 11 nits 11 ;2 tiase~subm' it.' this 'informati :[
' f appropriate.c't this ' letter 'and' update' this information a;nnuaW th~
~
l i
i your annual operating report.We suggestthat( thisfinformation!be made aereafter,~"
i regular pah
~.
N-AF
s
..t 1
=_
nncoG72
\\
t
w
,w l
O Duke Power Company JUL 1 1975
- is' our hope that,with this information we can assess your plans f It refueling and schedule submittal dates which realistically reflect our or review requirements and your need for timely licensing action.
I This request cloar'ance number B-180225 (R0072); this clearance exp
, 1977.
Sincerely, Odginal Signed by Karl GoHer
~
Karl R. Coller, Assistant ~ Dire'ctor:
for Operating Reactoirs
,d Z ;< ~
Y
~
s 4
Division of Reactor Licenoing'.
.s 1-7
Enclosures:
1.
Guidance for Proposed License Amenaments_
/._
Relating to Refueling 2.
Rafueling Information Request cc: w/encls-
)
v See next ~ page 4
e
~
DISTRIBUTION Docket Files RSBoyd ORBf1 Rkading FSchroeder.
l<
NRC PDRs RDenise i
Local PDR RCDeYoung KRGoller VMoore TJCarter
~
RAPurple '
l.
LMcDonough SMSlieppard OELD-
^'
T OIGE (3)
%-['l'
~
,',[..
ACRS (14)
~
4 4<:
, Vd TBAbernathyi s..
? O '), "A PCheck.
~
~
BSchemel C'J
'E.J,1 ~. ~
$0
_~ ' '....
Dross.
+
f? '
HVanderMolen-AGiambusso x
fe FOR CONCURRENCE OF TR AND OELD SEE. LEAD CASE f
,. t1
.. 5 f., J
+
.,,[,c.,
RL:0R Mf1-RL'i '
RL':Ob
'~
50-77 6 78 m
S-
~ ^
DJa h,,,, y 5l18/7S.
_ $/ /_. _
e KRGoller 4c
~
s.
?~$)ll75 E/[']Si ~bE d ^'~
N'~
m
.,,,, _ s-
,. ^ *.
f Q_
_ h qL W L1
' " 2--J:-
L'- -2 QhtiW&C wr l AL6.k -a.M&d EJ ' %##F
. ~ ~
t.
.DikePoderCompany,
July 1, 197S cc w/ enclosures:
Mr. William L. Porter Duke Power Company P. O. Box 2178 422 South Church Street Charlotte, North Carolina 28201
~
Mr. Troy B. Conner Conner, Hadlock &.Knotts 1747 Pennsylvania Avenue, NW Washington, D. C.
20006 Oconec Public i,1brary 201 South Spring Street Walhalla. South Carolina 29691 W
T i
I:.
f ENCLOSURE 2 REFUELING INFORMATION REQUEST 1.
Name of facility 2.
Scheduled date for next refueling shutdown 3.
Scheduled date for restart following refueling 4.
Will refueling or resumption of operation thereafter require technical specification Change or other license amendment?
d If answer is yes, what, in general, will these be?
?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.
10 CFR Section 50.59)?
If no such review has taken place, when is it scheduled?
5.
Scheduled date(s) for submitting proposed licensing action and supporting i-srmation 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
I 4
1 4
..g _
,