Discusses Insp Rept 50-269/73-02 on 730203-04 & 07-16. Noncompliance Noted Re Lack of Documented Procedures Governing Design Changes
ML19322A887
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/20/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A888 List:
References
NUDOCS 7911270643
Download: ML19322A887 (5)


See also: IR 05000269/1973002

Text

___ _.

y,-w"M

H

"We

s

.

.

.

.

r. j.

%,

UNITED STATES

.

'

ATOMIC ENERGY COMMISSION

g * p, 3

s t

-

!

DIRECTORATE OF REGUIATCRY OPEPATICUS

.

\\'o/_,x % y

aEciou n - sun t ets

2M WE ACwT m E E ST R E ET. NomT wwgge

' '0, /

,#

TE W '***E2

'8081 GIG 8103

d45

AT L A NT A. GEomGB A 30303

In Reply Refer To:

MAR 2 01973

RO:II:REW

50-269/73-2

Duke Power Company

Attn: Mr. A. C. Thies

Senior Vice President

Production and Transmission

Power Building

422 South Church Street

Charlotte, North Carolina 28201

Gentlemen:

)

-

This refers to the inspection conducted by Mr. Warnick and others

of this office on February 3-4 and 7-16, 1973, of activities authorized

by AEC Construction Permit No. CPRR-33 and Operating License No. DPR-38

for the Oconee Unit 1 facility, and to the discussion of our findings

held by Mr. Warnick with Mr. Smith and other members,of your staff at

the conclusion of the inspection.

-

Areas examined during this inspection included your preparedness fcr r

-

and the actual loading of fuel into the reactor vessel and the acti71 ties

conducted under your license as they relate to radiation safety and to

j

compliance with the Commission's rules and regulations and the conditions

'

of your license. The inspectica consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the inspector.

,

During this inspection, it was found that certain of your activitte.=

appear to be in violation of AEC requirements. The item and references

to pertinent requirements are listed in the enclosure to this letter.

'

This letter is sent to you pursuant to the provisions of Section 2.201

of the AE.':'s " Rules of Practice," Pa.t 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

within twenty (20) days of your receipt of this notice a written state-

ment of explanation in reply including:

(1) corrective steps which

--

have been taken by you and the results achieved; (2) corrective steps

which will be taken to avoid further violations; and (3) the date when

full compliance will be achieved.

-

,

2 9u 2qQ

s

.

. .

t

,--u-

-

.-

- . - _

.

,

.

(~'.

Duke Power Company

-2-

MM 2 0 E

.

You should note that this letter and your reply to this letter vill

be disclosed p the public by being placed in an AEC Public Document

Room.

,

,

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Very truly yours,

-

M

//h e

.,

Norman C. Moseley

Director

Enclosure:

As stated

,

.

9

e

.

m

O

e

___ __

_

. .,

_ . .

- _

_.

.

.

.

.

< > .

.

ENCLOSURE

Docket No. 50-269

.

bertainofyouractivitiesappeartobeinviolationofAECregulations

as identified below:

'

Criterion V of Appendix B to 10 CTR 50 states, in part, " Activities

affecting quality shall be prescribed by documented instructions,

procedures, or drawings, of a type appropriate to the circumstances

,

I

Criterion III of Appendix B to 10 CFR 50 states, in part, ".

. .

Design changes, including field changes, shall be subject to design

control measures commensurate with those applied to the original

design and be approved by the organization that performed the origi-

nal design unless the applicant designates cnother responsible

organization."

.

Contrary to the above requirements, the Oconee Nuclear Station

j

Operations organization had no documented instructions or

procedures to ensure that design changes are subject to design

control measures commensurate with those applied to the original

design and approved by the organization that performed the original

J

design. (or another designated, responsible organization) .

.

.

m

.

O

$

.

-

.. .

.

. - -.

--

~.-

.

._ . - _ _ -

- . . . . .-

.

. . . . . _

-.

-

. .

-

- . - . -

.

!

-

.

4

.

,

,

.

("

-

-

..

%

Ltr to Duke Power Company

MAR 2 01973

i

.

,

-

1

'

.

,

cc w/ enc 1:

1

J. B. Henderson, RO

J. G. Keppler, RO

RO:HQ (h)

Directorate of Licensing (k)

.

.

j

DR Central Files

!

'PDR

l

' Local PDR

'NSIC

t

DTIE, OR

l

' State

!

.

2

'To be dispatched with licensee response.

I

1

4

!

I

-

i

v

I

i

.

1

i

e

2

i

i

i

>

~

.

e

e

]

l

.

.-

,

.

-.--u-

--

.

.

.

.

,'%

?

-

.

'

.

~

f

Duke Power Company

'

Oconee 1

RO Inspection Report No. 50-269/73-2

!

cc w/ enc 1:

,

i

J. B. Henderson, RO

J. G. Keppler, RO

RO:HQ (5)

DR Central Files

Regulatory Standards (3)

Directorate of Licensing (13)

,

i

cc encl. only:

'PDR

!

i

'NSIC

-

I

'DTIE, OR

i

  • State

i

'To be dispatched at a later date.

,

~

.

l.

2

.

)

i

,

k

.

4

e

!

!

<

l.