ML19322A873

From kanterella
Jump to navigation Jump to search
Discusses Insp Rept 50-269/73-09 on 730813-17.No Noncompliance Noted
ML19322A873
Person / Time
Site: Oconee 
Issue date: 08/28/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A874 List:
References
NUDOCS 7911270631
Download: ML19322A873 (4)


See also: IR 05000269/1973009

Text

{{#Wiki_filter:____ . - . - - . - -- ' . '

UNITED STATES ,[[ , p'.h ATOM!C ENERGY COMMISSION - , ! o ' 1 DIRECTORATE OF REGULATORY OPEPATIONS ' -- J acciou u - suire eis g . '\\s 230 peacar a t e st acc7. Nearnwest g%ris ]' / , , ,g o At L4ur a, occacia som In Reply Refer To: AUG 281973 RO:II:FJ 50-269/73-9 .- Duke Power Company Attn: Mr. A. C. Thies, Senior Vice President Production and Transmission I Power Building 422 South Church Street Charlotte, North Carolina 28201 Gentlemen: l This refers to the inspection conducted by Mr. F. Jape of this office on August 13-17, 1973, of activities authorized by AEC Operating License No. DPR-38, for the Oconee 1 facility, and to J the discussion of our findings held by Mr. Jape with Mr. J. E. Smith at the onclusion of the inspection. Areas examined during the inspection and our findings are discussed in the ' enclosed inspection report. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no violations are disclosed. Two new unresolved items resulted from this inspection and are identified in Section III of the summary of the enclosed report. ( These items will be examined during subsequent inspections. In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the AEC's Public ' t Document Room. If this report contains any information that you believe to be proprietary, it is necessary that you submit a written application l , ' to this office requesting that such information be withheld from public disclosure. If no proprietary information is identified, a written statement to that effect should be submitted. If an' application is submitted, it must fully identify the bases for which information is , claimed to be proprietary. The application should be prepared so that information sought to be withheld is incorporated in a separate paper and referenced in the application since the application will be placed in the Public Document 2cem. Your application, or written statement, , ' ! > < i 7911270 ( 3 /

- _. .. _. _ . _ . . ,

. . Duke Power Company -2- AUG 281973 ' , , should be submitted to us within 30 days. If we are not' contacted as specified, the enclosed report and this letter may then be placed in the Public Document Room. , Should you have any questions concerning this letter, we will be glad to discuss them with you. Very truly yours, C w orman'.. More ey Directcr h k Enclosure: RO Inspection Report No. 50-269/73-9 . . % , f 9

e ' bmw l .- ' , n-

_ . _ _ _. . _. _ . _ . . - I - l

! a . . - . 2 . . . ' m . - Ltr to Duke Power Company

    • ' AUG 2 81973

- i DISTRIBUTION:

H. D. Thornburg, RO ' RO:HQ (h) ' i Directorate of Licensing (h) ! y- T Central Files . i

  • PDR

l' ' Local PDR l 'NSIC i

  • DTIE, OR

' State 'To be dispatched at a later date. l , _. I l

. 0 i ! - . . ! ( t . i t- i - , . . , t - . 4 3 b

~. ) i i . i .- - - _ . . . .

. __ _ . . _. __ . . .- - '

-

. . . - - - , . , . 'm Duke Power Company AUG 28 E Oconee 1 RO Inspection Report No. 50-269/73-9 . ce v/ encl: H. D. Thornburg, RO g RO:HQ (5) , 79 Central Files 2 1 Regulatory Standards (3) Directorate of Licensing (13) cc encl. onW: 'PDR ' Local PDR

  • NSIC

l

  • DrIE, OR

j ' State i i

l
  • To be dispatched at a later date.

< i . k I . J t , . . I h

i f !

. i I .'

!. . . _. 6 , - .,. - v ~ -- ---- , -- . - - . ,e -s - }}