Discusses Insp Rept 50-269/73-13 on 731127-30 & 1203-07. Noncompliance Noted Re Chemical Discharge,Wastewater Collection & Fish Impingement Insp
ML19322A843
Person / Time
Site: Oconee 
Issue date: 12/26/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A844 List:
References
NUDOCS 7911270603
Download: ML19322A843 (4)


See also: IR 05000269/1973013

Text

__

_ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

[#

'

ATOMIC ENERGY COMMISSION

%

UNITE] STATE 3

(c'! .1 [;

DIRECTORATE OF REGULATORY OPERATIONS

  • I

'

arosos n - suite ets

g+g a ]4

y

\\/

,e

2m pe Acar ace sracer Nontn=est

.-

,,,,, ,,, , ,, ,, ,,,,

I'e rg s 0

AT L ANr A, GEomGs A M 303

%

DEC 2 G 1973

In Repiv Refer To:

RO:II:ca

50-269/73-13

Duke Power Company

ATTN:

Mr. A. C. Thies

Senior Vice President

Production and Transmission

Power Building

422 South Church Street

Charlotte, North Carolina

28201

Gentlemen:

This refers to the inspection conducted by Mr. Frank Jape of this office on

November 27-30 and December 3-7, 1973, of activities authorized by AEC

Operating License No. DPR-38 for the Oconee 1 facility, and to the discussion

of our findings held by Mr. Jape with Messrs. J. E. Smith and J. W. Hampton

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspector.

New unresolved items are identified in Section III of the summary of the

enclosed report.

During the inspection it was found that certain activities under your

license appear to be in violation of AEC requirements. The violation

and references to pertinent requirements are listed in Section I of

the summary of the enclosed report.

This notice is sent to you pursuant to the provisions of Section 2.201

of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

within 20 days of your receipt of this notice, a written statement

or explanation in reply including:

(1) corrective steps which have

been taken by you, and the results achieved; (2) corrective steps

which will be taken to avoid further violations; and (3) the date

when full compliance will be achieved.

7911270 Mg

,

.

.

s-

.

.

-

.

.

s

Duke Power Company

-2-

DEC 2 61973

,

Please provide us within 20 days, in writing, with your comments

concerning these items, a description of any steps that have been

or will be taken to correct them, a description of any steps that

have been or will be taken to prevent recurrence, and the date all

corrective actions or preventive messures were or will be completed.

In accordance with Section 2.790 of the AEC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

Room. If this report contains any information that you believe to be

proprietary, it is necessary that you submit a written application to

F ls office requesting that such information be withheld from public

i

disclosure.

If no proprietary information is identified, a written

statement to that effect should be submitted. If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Rocm. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

Public Document Room.

.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

You should note that this letter and your reply to this letter will be

disclosed to the public by being placed in an AEC Public Document Room.

Ve

truly yours,

,

,

9*, ., /1

'

QQ

A

Norman C. Moseley

Director

Enclosure:

RO Inspection Report No.

50-269/73-13

.

s

. .

... .. -

.

'

.

.

.O

>

,

,

Ltr to Duke Power Company fm N. C. Moseley

d'd

'

DEC 2 61973

DISTRIBUTION:

H. D. Thornburg, R0

RO:HQ (4)

Directorate of Licensing (4)

DR Central File '

  • PDR

-

  • NSIC
  • State

i

I

  • To be dispatched at a later date.

l

,

i

!

.

'

]

i

'

l

i

6

f

6

'.

l

.

'

,

_.

.. . ,

-

-

--

.

- ..-

. -,

_

_ _

__ _

j-

.

.

-

.

'

-

,

.

.

^

.

,

n

Duke Power Company

-

Oconee 1

RO Inspection Report No. 50-269/73-13

cc w/ enc 1:

H. D. Thornburg, RO

R

n ral File

Regulatory Standards (3)

Directorae of Licensing (13)

cc enc 1. only

  • PDR
  • NSIC
  • State
  • To be dispatched at a later date.

t

,

.

$

y

-

.

- - , . _ , . , _

,

3

,

,.-