ML19322A842

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-270/75-06 & 50-287/75-06 on 750422-25
ML19322A842
Person / Time
Site: Oconee  
Issue date: 05/09/1975
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A839 List:
References
NUDOCS 7911270601
Download: ML19322A842 (3)


See also: IR 05000270/1975006

Text

--

. _ .

-

-__

.

. .

.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

<

-

REGloN il

230 PE ACHTR EE STR EET. N. W.

$UITE 818

ATLANT A. G EO R GI A 30303

_s

MAY

S 1975

In Reply Refer To:

IE:II:FJ

50-270/75-6

50-287-75-6

Duke Power Company

ATIN: Mr. A. C. Thies, Senior

Vice President

Production and Transmission

Power Building

422 South Church Street

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by Mr. F. Jape of this of fice on

April 22-25,1975, of activities authorized by NRC Operating License Nos.

DPR-47 and 55 for the Oconee 2 and 3 facilities, and to the discussion of

our findings held with Mr. L. E. Schmid at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

.

We have also examined actions you have taken with regard to previously

identified enforcement matters and unresolved items.

The status of these

items is identified in Sections II and IV of the summary of the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

J

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this of fice requesting that such information be withheld from public

disclosure.

If no proprietary information is identified, a written

statement to that ef fect should be submitted.

If an application is

os ito,

u

!

I

'

'%,.)

-191127oGo(

_

'

- ' -

-

-

. __ .

--.

.

.

-.

.

.

-2 -

^

Duke Power Company

submitted, it must fully identify the bases for which information is

'

claimed to be proprietary.

The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room. Your application, or written state =ent,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may thea be placed in

the Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Very truly yours,

0

- r9rdt

af

f

-

rean C. Moseley

-

Director

,

Enclosure:

g

IE Inspection Report Nos.

50-270/75-6 and 50-287 /75-6

cc/w report:

J. E. Smith, Plant Manager

P. O. Box 1175

Seneca, South Carolina 29678

,

.

.

I

e

.

  • +

~~ --

, _ ,

4